Russell Carlson
Principal investigator, leads VALLEY TECH SYSTEMS INC.
DefenseFounder
Built from public records only: federal awards, patents, filings and papers.Is this you? Contact Noair Lab to claim this profile, correct it or hide it.
2015First federal award
$18.1MFederal grants as PI15 awards
5Patents grantedLatest Jun 20, 2023
0PapersOpenAlex
Federal awards and patents by year
AwardsPatents
15 awards · $18.1M
| Date | Agency | Award | Amount | Company |
|---|---|---|---|---|
| May 3, 2021 | DoD | SBIR Phase II Improvements to Weapon System Readiness Assessment Vehicles (WSRAV) | $1.5M | VALLEY TECH SYSTEMS INC |
| Dec 28, 2020 | DoD | SBIR Phase I Lightweight Structural Metamaterials for Second and Third Stage Rocket Motors | $150K | VALLEY TECH SYSTEMS INC |
| Jul 8, 2020 | DoD | SBIR Phase II Advanced Exo-atmospheric Propulsion and Control Systems | $1.2M | VALLEY TECH SYSTEMS INC |
| Jan 29, 2020 | DoD | SBIR Phase II Kinematic Reach/Containment | $997K | VALLEY TECH SYSTEMS INC |
| Jul 22, 2019 | DoD | SBIR Phase II Standard Missile 3 (SM-3) Materials Design Improvements | $3.0M | VALLEY TECH SYSTEMS INC |
| Jun 25, 2018 | DoD | SBIR Phase I Advanced Solid Axial Stage (ASAS) with Fast ResponseSecondary Hot Gas Injection TVC | $100K | VALLEY TECH SYSTEMS INC |
| Jun 5, 2018 | DoD | SBIR Phase II Affordable Extinguishable Divert and Attitude Control Systems (XDACS) | $1.7M | VALLEY TECH SYSTEMS INC |
| Apr 27, 2018 | NASA | SBIR Phase II Affordable Small Satellite Launch Vehicle Reaction Control System | $750K | VALLEY TECH SYSTEMS INC |
| Jun 19, 2017 | DoD | SBIR Phase II UltraLow Weight Hot Gas Valve for Long Duration SDACS ACS | $1.6M | VALLEY TECH SYSTEMS INC |
| Jun 10, 2016 | DoD | SBIR Phase II Lightweight Detachable Roll Control System | $2.2M | VALLEY TECH SYSTEMS INC |
| Jun 10, 2016 | NASA | SBIR Phase I Mars Ascent Vehicle Reaction Control System | $124K | VALLEY TECH SYSTEMS INC |
| May 6, 2016 | DoD | SBIR Phase II Standard Missile 3 (SM-3) Materials Design Improvements | $1.5M | VALLEY TECH SYSTEMS INC |
| Mar 8, 2016 | DoD | SBIR Phase II Advanced Divert and Attitude Control | $1.5M | VALLEY TECH SYSTEMS INC |
| Sep 11, 2015 | DoD | SBIR Phase II Advanced controllable solid propulsion thruster development for a lightweight detachable Roll Control System | $750K | VALLEY TECH SYSTEMS INC |
| Jun 1, 2015 | DoD | SBIR Phase II Lightweight Low Power Long Duration Attitude Control System (ACS) Thruster | $1000K | VALLEY TECH SYSTEMS INC |
6 patents as inventor
- US 10598128VALLEY TECH SYSTEMS INCMar 24, 2020
- US 10712138VALLEY TECH SYSTEMS INCJul 14, 2020
- US 11143143VALLEY TECH SYSTEMS INCOct 12, 2021
- US 11448165VALLEY TECH SYSTEMS INCSep 20, 2022
- US 11680543VALLEY TECH SYSTEMS INCJun 20, 2023
- US VALLEY TECH SYSTEMS INC—
Matched by the first inventor’s name and the patent’s company.
Peer ranks
Federal funding#3
Awards as PI#17
Patents#16
Companies
- VALLEY TECH SYSTEMS INCLeads (SEC Form D) · Defense
Federal awards through Oct 21, 2026 and patents through Oct 20, 2026. Awards come from NIH, NSF and other agency records that name a principal investigator; DoD and NASA contract awards do not, so they are not shown here. Researchers are matched by name and company.