Harish Bhandari
Principal investigator.
Defense
Built from public records only: federal awards, patents, filings and papers.Is this you? Contact Noair Lab to claim this profile, correct it or hide it.
2014First federal award
$9.1MFederal grants as PI17 awards
0Patents grantedNone matched
0PapersOpenAlex
Federal awards and patents by year
AwardsPatents
17 awards · $9.1M
| Date | Agency | Award | Amount | Company |
|---|---|---|---|---|
| Jan 6, 2023 | DoD | SBIR Phase I Passivation of Bulk and Surface Defects in III-V Bismuth-based Detectors | $150K | RADIATION MONITORING DEVICES, INC. |
| Apr 4, 2022 | DOE | SBIR Phase II Large-Area Atomic Layer Deposition (ALD) of Titanium Nitride for RF Windows | $1.1M | RADIATION MONITORING DEVICES, INC. |
| Aug 27, 2021 | DOE | SBIR Phase II Commercial ALD Process for Elimination of Memory Effects in Xe Beta Cells | $200K | RADIATION MONITORING DEVICES, INC. |
| May 3, 2021 | DOE | SBIR Phase II 9b Bright Electron Source for X-ray Free Electron Lasers | $1.1M | RADIATION MONITORING DEVICES, INC. |
| Mar 22, 2021 | DoD | STTR Phase II Low Temperature Atomic Layer Deposition of Manganese Telluride on Topological Insulator | $1.1M | RADIATION MONITORING DEVICES, INC. with Boston College |
| Feb 22, 2021 | DOE | SBIR Phase I Large-Area Atomic Layer Deposition (ALD) of Titanium Nitride for RF Windows | $200K | RADIATION MONITORING DEVICES, INC. |
| Feb 18, 2020 | DOE | SBIR Phase I Bright Electron Source for X-ray Free Electron Lasers | $200K | RADIATION MONITORING DEVICES, INC. |
| Aug 19, 2019 | DOE | SBIR Phase II Commercial ALD Process for Elimination of Memory Effects in Xe Beta Cells | $1000K | RADIATION MONITORING DEVICES, INC. |
| May 29, 2019 | DoD | SBIR Phase I Engineering the interface chemistry for improved performance III-V based infrared sensors | $108K | RADIATION MONITORING DEVICES, INC. |
| Jul 2, 2018 | DOE | SBIR Phase I Commercial ALD Process for Elimination of Memory Effects in Xe Beta Cells | $150K | RADIATION MONITORING DEVICES, INC. |
| May 21, 2018 | DOE | SBIR Phase II Manufacturing and Packaging of Reliable Bialkali Photocathodes via Sputtering | $1000K | RADIATION MONITORING DEVICES, INC. |
| Sep 25, 2017 | DoD | SBIR Phase I Hot Wall Epitaxy of Mixed Lead Chalcogenides in Resonant Cavity Structures | $225K | RADIATION MONITORING DEVICES, INC. |
| Jun 12, 2017 | DOE | SBIR Phase I Low Emittance High Brightness Electron Source for Wakefield Accelerators | $150K | RADIATION MONITORING DEVICES, INC. |
| Feb 21, 2017 | DOE | SBIR Phase I Manufacturing and Packaging of Reliable Bialkali Photocathodes via Sputtering | $153K | RADIATION MONITORING DEVICES, INC. |
| Oct 31, 2016 | DoD | SBIR Phase II Conformal Multilayered Passivation for Type-II indium arsenide/gallium antimonide Superlattice Mesas | $1.1M | RADIATION MONITORING DEVICES, INC. |
| Apr 17, 2015 | DoD | STTR Phase II Conformal Passivation of High Aspect Ratio HgCdTe Surfaces by ALD Using a Novel Cd-Precursor | $1000K | RADIATION MONITORING DEVICES, INC. with Illinois Institute of Technology |
| Dec 22, 2014 | DoD | SBIR Phase I Conformal Multilayered Passivation for Type-II InAs/GaSb Superlattice Mesas | $125K | RADIATION MONITORING DEVICES, INC. |
Peer ranks
Federal funding#20
Awards as PI#11
Patents#189
Companies
- RADIATION MONITORING DEVICES, INC.Linked by awards · Defense
Research institutions
Federal awards through Oct 21, 2026 and patents through Oct 20, 2026. Awards come from NIH, NSF and other agency records that name a principal investigator; DoD and NASA contract awards do not, so they are not shown here. Researchers are matched by name and company.