Dr. Troy Beechner
Principal investigator.
Materials
Built from public records only: federal awards, patents, filings and papers.Is this you? Contact Noair Lab to claim this profile, correct it or hide it.
2015First federal award
$5.0MFederal grants as PI9 awards
0Patents grantedNone matched
0PapersOpenAlex
Federal awards and patents by year
AwardsPatents
9 awards · $5.0M
| Date | Agency | Award | Amount | Company |
|---|---|---|---|---|
| Aug 29, 2019 | DoD | SBIR Phase II High Power Density Aircraft Power Factor Correction | $748K | MAINSTREAM ENGINEERING CORP |
| Jul 5, 2019 | DoD | SBIR Phase II High Temperature Motor Drive | $704K | MAINSTREAM ENGINEERING CORP |
| May 24, 2018 | DoD | SBIR Phase I High Temperature Motor Drive | $154K | MAINSTREAM ENGINEERING CORP |
| Jul 13, 2017 | DoD | SBIR Phase II GaN Dual-Stage Power Supply | $999K | MAINSTREAM ENGINEERING CORP |
| Mar 14, 2017 | DoD | SBIR Phase II Four-Quadrant GaN-Based Battery Isolator Unit | $995K | MAINSTREAM ENGINEERING CORP |
| Sep 26, 2016 | DoD | STTR Phase II Weapon Inspection, Sustainment and Recorder Device | $999K | MAINSTREAM ENGINEERING CORP with Florida Institute of Technolgy |
| Aug 18, 2016 | DoD | SBIR Phase I GaN Dual-Stage Power Supply | $150K | MAINSTREAM ENGINEERING CORP |
| Aug 25, 2015 | DoD | SBIR Phase I 4-Quadrant GaN Based Battery Isolator Unit | $149K | MAINSTREAM ENGINEERING CORP |
| Jul 6, 2015 | DoD | SBIR Phase I Extreme Temperature, Low Loss Custom Power Switch | $80K | MAINSTREAM ENGINEERING CORP |
Peer ranks
Federal funding#24
Awards as PI#23
Patents#88
Companies
- MAINSTREAM ENGINEERING CORPLinked by awards · Materials
Research institutions
Federal awards through Oct 21, 2026 and patents through Oct 20, 2026. Awards come from NIH, NSF and other agency records that name a principal investigator; DoD and NASA contract awards do not, so they are not shown here. Researchers are matched by name and company.