TDA RESEARCH, INC.
Multi-physics simulation software for optimizing microwave curing of fiber-reinforced composite materials
- Sector
- Materials
- Headquarters
- Wheat Ridge, CO
- Total capital
- $282M
- Federal grants
- $107M
- 236 awards · 2008–2026
- Rank in peer group#1 of 11
- Private capital raised
- None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
- Federal contracts
- $176M
- 353 awards · NASA, Defense, Environmental Prot
- Rank in Materials#2 of 1258
- Granted patents
- 22
- 18 pending · first 2021
- Rank in peer group#1 of 11
Capital timeline
Latest events
- Federal grantNASA · Phase I · Phase I SBIR - Modular Lunar Surface Batteries With Extreme Thermal Tolerance And Night Operability$225K
- Federal grantNASA · Phase I · Phase I SBIR - Polysilazane-based Waterproofing Coating For Reusable Thermal Protection Systems$225K
- Federal contractDefense · A19-022 - Phase 2$2M
- Federal contractDefense · Research And Development.$140K
- Federal contractDefense · 3-D Printed Synthetic Soft Tissue$1.3M
- Federal grantDefense · Phase II · 3-D Printed Synthetic Soft Tissue$1.3M
- Federal grantDefense · Phase II · A19-022 - Phase 2$2M
Show 570 earlier federal awards
- Federal contractDefense · Multimodal Soft Robotic Sensor For Inspection In Confined Space$140K
- Federal grantDefense · Phase I · Research And Development.$140K
- Federal contractDefense · This Is An Award Of A Contract Under Small Business Innovative Research Program Topic 25.1-075.$140K
- Federal contractDefense · Scalable Homeland Innovative Enterprise Layered Defense (shield) Initial Order.$500
- Federal grantDefense · Phase I · This Is An Award Of A Contract Under Small Business Innovative Research Program Topic 25.1-075.$140K
- Federal grantDefense · Phase II · 873AUTHORITY$1.0M
- Federal contractDefense · 873AUTHORITY$1.0M
- Federal grantDefense · Phase I · Ultrasonic Sensor To Detect, Analyze, And Locate Microleaks In Gas Pressure Vessels$180K
- Federal contractDefense · Ultrasonic Sensor To Detect, Analyze, And Locate Microleaks In Gas Pressure Vessels$180K
- Federal contractDefense · Research And Development.$140K
- Federal grantDefense · Phase I · Research And Development.$140K
- Federal contractHealth and Human S · SBIR Topic 111, Phase II: A Compact Portable Medical Oxygen Generator$2M
- Federal grantDefense · Phase II · Sequential Phase II SBIR - Stackable Portable Oxygen Generator For Deployed Army Casualty Care$617K
- Federal contractDefense · Sequential Phase II SBIR - Stackable Portable Oxygen Generator For Deployed Army Casualty Care$617K
- Federal contractNASA · SBIR Phase III 80NSSC25C0487 Low-temperature Secondary Batteries For The Lunar Surface$2.8M
- Federal contractDefense · A Mobile Application For Prediction Of Blast Overpressure Exposure In Civilian And Military Operations$250K
- Federal grantDefense · Phase II · Chemical Sterilant Solution For Use In Austere Environments That Sterilizes Surgical Instruments And Other Materiel Through Immersion.$954K
- Federal grantNASA · Phase II · SBIR Phase III 80NSSC25C0487 Low-temperature Secondary Batteries For The Lunar Surface$2.8M
- Federal contractDefense · Requirement Is For A Deployable Oxygen Generation System (dogs) To Provide High Purity Oxygen To Support Exothermic Torch Operations.$296K
- Federal contractNASA · Phase II SBIR - Lunar Surface Secondary Battery Modules For Continuous Day/night Operation$849K
- Federal contractDefense · Chemical Sterilant Solution For Use In Austere Environments That Sterilizes Surgical Instruments And Other Materiel Through Immersion.$1.9M
- Federal grantNASA · Phase II · Phase II SBIR - Lunar Surface Secondary Battery Modules For Continuous Day/night Operation$849K
- Federal contractDefense · See Attached Pws.$210K
- Federal grantDefense · Phase I · See Attached Pws.$210K
- Federal grantDefense · Phase I · A Mobile Application For Prediction Of Blast Overpressure Exposure In Civilian And Military Operations$250K
- Federal contractDefense · Small Business Innovation Research (SBIR) Phase I, Topic A244-071: Water At The Point Of Need. Proposal A244-071-2324: Lightweight, Vehicle Compatible Technology For Potable Water At The Point Of Need.$250K
- Federal grantDefense · Phase I · Small Business Innovation Research (SBIR) Phase I, Topic A244-071: Water At The Point Of Need. Proposal A244-071-2324: Lightweight, Vehicle Compatible Technology For Potable Water At The Point Of Need.$250K
- Federal contractDefense · SBIR Ph I - Tda Research, Inc.$250K
- Federal grantDefense · Phase I · SBIR Ph I - Tda Research, Inc.$250K
- Federal contractNASA · Phase II SBIR$900K
- Federal grantNASA · Phase II · Phase II SBIR$900K
- Federal grantDefense · Phase I · 25-5D1 STTR Phase I - 3.3/5V Configurable Logic Asic: E25D-001-0010$200K
- Federal contractDefense · 25-5D1 STTR Phase I - 3.3/5V Configurable Logic Asic: E25D-001-0010$200K
- Federal contractDefense · This Is An Award Of A Base Contract Under Small Business Innovative Research Program Topic 25.1-001$140K
- Federal grantDefense · Phase I · This Is An Award Of A Base Contract Under Small Business Innovative Research Program Topic 25.1-001$140K
- Federal contractDefense · Dha Phase II SBIR Contract For Psoralen-uv-a Inactivation Based High-throughput Pathogen Inactivation Device$1.3M
- Federal grantDefense · Phase II · Dha Phase II SBIR Contract For Psoralen-uv-a Inactivation Based High-throughput Pathogen Inactivation Device$1.3M
- Federal grantDefense · Phase II · R&d: Seamless Knitted Mesh, Cold Weather$1M
- Federal contractDefense · R&d: Seamless Knitted Mesh, Cold Weather$1M
- Federal contractDefense · Research And Development.$240K
- Federal contractDefense · New 3D Printable Solid Propellant Binders For Rocket Motors$140K
- Federal grantDefense · Phase I · New 3D Printable Solid Propellant Binders For Rocket Motors$140K
- Federal grantDefense · Phase I · Research And Development.$140K
- Federal grantDefense · Phase I · New Award For SBIR Ph I Topic #N251-027$140K
- Federal contractDefense · New Award For SBIR Ph I Topic #N251-027$140K
- Federal contractDefense · Dha SBIR Phase II Enhancement Contract For Development Of Thermal Desorption (td) Tube Sequential Sampler$500K
- Federal grantDefense · Phase II · Dha SBIR Phase II Enhancement Contract For Development Of Thermal Desorption (td) Tube Sequential Sampler$500K
- Federal grantDefense · Phase I · Kickoff Briefing$75K
- Federal contractDefense · Kickoff Briefing$175K
- Federal contractDefense · Small Business Innovation Research (SBIR) Phase I, Topic A244-P063, Batteries Focused Open Topic$250K
- Federal grantDefense · Phase I · Small Business Innovation Research (SBIR) Phase I, Topic A244-P063, Batteries Focused Open Topic$250K
- Federal contractDefense · Dha STTR Phase I 3D Printed Synthetic Soft Tissue$250K
- Federal grantDefense · Phase I · Dha STTR Phase I 3D Printed Synthetic Soft Tissue$250K
- Federal contractDefense · 25-5A6 SBIR Phase II - Analysis And Re-engineering Of Printed Circuit Board Assemblies$1.3M
- Federal contractDefense · Small Business Innovation Research, Phase I. Topic A244-052, Dynamic Synthetic Tissues For Medical Simulation And Training.$250K
- Federal grantDefense · Phase I · Small Business Innovation Research, Phase I. Topic A244-052, Dynamic Synthetic Tissues For Medical Simulation And Training.$250K
- Federal contractDefense · SBIR Phase 1.$140K
- Federal grantDefense · Phase I · SBIR Phase 1.$140K
- Federal contractDefense · Serdp Project WP25-4608 "rapid Cure Polysilazane Topcoats" To Develop Improved Military Topcoats With Reduced Health, Environmental, And Regulatory Risks In Order To Assess The Feasibility Of Polysilazanes As Military Topcoat Replacements.$220K
- Federal grantDefense · Phase II · BASE$752K
- Federal contractDefense · BASE$1.4M
- Federal contractTransportation · Small Business Innovation Research Phase II Award On U.S. Dot Topic 23-FH1 Addressing Stormwater Runoff With A Self-contained Portable Treatment System$495K
- Federal contractDefense · Research And Development$1.0M
- Federal contractNASA · FY24 SBIR Phase I- Sensors For Precision Agriculture And Crop Management Decisions$150K
- Federal contractNASA · FY24 SBIR Phase I- Lunar Surface Secondary Battery Modules For Continuous Day/night Operation$144K
- Federal grantNASA · Phase I · FY24 SBIR Phase I- Sensors For Precision Agriculture And Crop Management Decisions$150K
- Federal grantNASA · Phase I · FY24 SBIR Phase I- Lunar Surface Secondary Battery Modules For Continuous Day/night Operation$144K
- Federal contractDefense · Small Business Innovation Research Topic 24.1-004$140K
- Federal grantDefense · Phase I · Small Business Innovation Research Topic 24.1-004$140K
- Federal contractTransportation · Tda Research, Inc. (PH3) - SBIR FY23 Phase II Phmsa For Portable State-of-charge Sensor For Lithium Batteries$1.0M
- Federal grantDefense · Phase I · SBIR Ph I$240K
- Federal contractDefense · SBIR Ph I$240K
- Federal grantHealth and Human S · Phase II · Filtration Media for In-Home PFAS Removal from Drinking Water$767K
- Federal grantAgriculture · **awards Issued Prior To January 20, 2025, Were Funded Under Previous Administrations And May Not Reflect The Priorities And Policies Of The Current Administration.** Protecting The Quality Of Water In The NATION'S Streams, Rivers, Lakes, And Estuaries Is A Critical Need And Important For Human And Ecosystem Health.efficient Protection Requires Knowledge Gained From Real-time Or Near Real Time Information On Nutrient Concentrations And Loads. Thisinformation Feeds Into Predictive Models And $175K
- Federal grantAgriculture · **awards Issued Prior To January 20, 2025, Were Funded Under Previous Administrations And May Not Reflect The Priorities And Policies Of The Current Administration.** Kraft Lignin Is A Common Byproduct Of The Forestry Industry Produced In The Paper Pulping Process. Despite The Variety Of Applications, Only 1-2 % Of The Annually Produced 50-70 Million Tons Of Lignin Is Used To Produce Value-added Products. Thus, The Market Potential For Lignin And Its Derivatives Is Grossly Underutilized. With A $175K
- Federal contractDefense · Dha SBIR Phase I Psoralen-uv-a Inactivation Based High-throughput Pathogen Inactivation Device$250K
- Federal grantDefense · Phase I · Dha SBIR Phase I Psoralen-uv-a Inactivation Based High-throughput Pathogen Inactivation Device$250K
- Federal grantDefense · Phase II · SBIR Ph II$500K
- Federal contractDefense · SBIR Ph II$1M
- Federal grantDefense · Phase II · BASE$1.2M
- Federal contractDefense · BASE$1.7M
- Federal contractDefense · STTR Phase II -- Portable Working Dog Protective Shelter$1.3M
- Federal grantDefense · Phase II · STTR Phase II -- Portable Working Dog Protective Shelter$661K
- Federal grantDefense · Phase II · Validation Of Nature-inspired Mode Sensing Principles For Unmanned Aircraft System$1.2M
- Federal contractDefense · Validation Of Nature-inspired Mode Sensing Principles For Unmanned Aircraft System$1.2M
- Federal grantDefense · Phase I · Small Business Technology Transfer (STTR) Phase I Study$99K
- Federal contractDefense · Small Business Technology Transfer (STTR) Phase I Study$99K
- Federal grantHealth and Human S · Phase I · High Efficiency Sorption System for Removing Harmful Contaminants from Indoor Air$275K
- Federal grantDefense · Phase II · Research And Development 873AUTHORITY$750K
- Federal grantDefense · Phase I · Development Of A Ruggedized In-ear Pulse Oximeter Device (epod-r)$110K
- Federal contractDefense · Development Of A Ruggedized In-ear Pulse Oximeter Device (epod-r)$110K
- Federal contractDefense · Research And Development 873AUTHORITY$1.0M
- Federal grantDefense · Phase II · Sbir/sttr Phase II R&d New High Performance Solid Propellant Ingredients$1.4M
- Federal contractDefense · Sbir/sttr Phase II R&d New High Performance Solid Propellant Ingredients$1.4M
- Federal contractDefense · 873AUTHORITY$1.2M
- Federal contractDefense · One (1) Year Baa Under Arl Broad Agency Announcement (baa) For Arl Foundation Research Competencies.$3.4M
- Federal contractDefense · Medical Research And Development Dha Phase III SBIR Contract For Project Titled Pilot Breathing Air Environmental Sampler Development$500K
- Federal grantHealth and Human S · Phase I · Advanced Pediatric Airway Trainer for Enhanced Clinical Education in Pediatric Critical Care$300K
- Federal contractDefense · SBIR Phase II Topic A224-025, Wearable Technolgies For Physiological Monitoring.$1.7M
- Federal grantDefense · Phase I · One Way Tracer Technology for 40mm Ammunition$140K
- Federal grantDefense · Phase II · Portable Hydrogen Generator for Vehicle Fleet Refueling$1.8M
- Federal grantEnergy · Phase II · Low Cost, High Efficiency Krypton Capture Technology$1.1M
- Federal grantEnergy · Phase II · A New Direct Air Capture System Operating on Low Grade Heat Generated from Geothermal Plants$1.6M
- Federal grantHealth and Human S · Phase II · Filtration Media for In-Home PFAS Removal from Drinking Water$759K
- Federal contractDefense · A Compact, Energy-efficient, Portable Oxygen Concentrator With Extended Shelf Life$3.2M
- Federal grantDefense · Phase I · High Energy Density Batteries$175K
- Federal contractDefense · SBIR Phase III High Pressure Hydrogen$400K
- Federal contractNASA · SBIR Phase II Solid-state Rechargeable Batteries For Extreme Lunar Surface Environments$850K
- Federal grantDefense · Phase I · A New System for Scalable Production of Carbon-based Composites from Sequestered Environmental Carbon$140K
- Federal grantDefense · Phase I · Technology Development Strategy for the Design of Passive and Semi-passive Underwater Accousting Metamaterial Filters$140K
- Federal contractDefense · SBIR Ph I$240K
- Federal grantEnergy · Phase I · Durable Catalysts and Membranes for AEM Electrolyzer Operated with Impure Water$200K
- Federal grantEnergy · Phase I · A Reactive Capture System for Removing CO2 from Industrial Applications$250K
- Federal grantEnergy · Phase I · Nanoporous Anion Exchange Membranes for Water Electrolyzers$200K
- Federal contractTransportation · Small Business Innovation Research FY23 Phase 1 Effort On Topic 23-FH1 For A Low-cost High-capacity Portable Stormwater Treatment System For Emerging Contaminants$150K
- Federal grantDefense · Phase I · Seamless Knitted Mesh, Cold Weather Baselayer Undershirt and Drawer$140K
- Federal contractDefense · Small Business Innovation Research Phase I Research And Development Topic 23.1-002.$240K
- Federal contractDefense · SBIR Ph II Topic Concentrated Atropine Sulfate Formulation$1.3M
- Federal contractNASA · SBIR II Phase Contract In-circuit Energy Storage Device For Extreme Environments$900K
- Federal grantDefense · Phase II · Thermal Flux Data Collection System$1.8M
- Federal grantDefense · Phase I · Composite Microwave Curing Hybrid Simulation Model$140K
- Federal contractDefense · Phase I Award$250K
- Federal grantDefense · Phase II · Enhanced Combat Tourniquet with Modular Wound Infection Prevention Capabilities$1.1M
- Federal grantHomeland Security · Phase II · Low-cost Diagnostic for Animal and Zoonotic Diseases$1.0M
- Federal contractHomeland Security · SBIR Phase II Cpff Award To Tda Research, Inc.$535K
- Federal contractDefense · "tda Research, Inc." SBIR Phase I - Topic: A224-025$150K
- Federal contractDefense · To Develop An Improved Waste Activated Sludge (was) Treatment System That Produces Class A Biosolids (safe To Be Administered To Soil Without Pathogenic Risk) At Lower Cost Than Currently Available Technologies.$150K
- Federal grantDefense · Phase II · Development of a Chemical Sterilant for Use in Austere Environments$1.1M
- Federal contractDefense · Research And Development$2.5M
- Federal grantDefense · Phase I · Non-PFAS Omniphobic Liquid Repellent Coatings$183K
- Federal grantDefense · Phase I · Portable Working Dog CBRN Shelter$183K
- Federal grantDefense · Phase I · Tunable, Repeatable, Calcium Lanthanum Sulfide Ceramic Powder$240K
- Federal contractDefense · SBIR Phase I.$140K
- Federal grantDefense · Phase II · Reactive Boron Fuel for Energetic Applications$800K
- Federal contractDefense · SBIR 2 N211-026$1.1M
- Federal contractDefense · Small Business Innovation Research Program, Defoamer Solution And Delivery System For Rapid Collapse Of Hi-ex Foam, Phase II$735K
- Federal contractDefense · Dha Sblr Phase II Medical R&d Contractor, Proposal NO.H2-0703$1.1M
- Federal grantDefense · Phase II · Efficient Production of Low‐Cost Battery Electrode Materials$1.6M
- Federal contractDefense · 8509317518!DEFENSE R&dexperimental Devel$1.8M
- Federal grantEnergy · Phase II · Onboard Monitoring Method for Detection of Damage to Carbon Fiber Composite Overwrap on Hydrogen Fuel Tanks$1.1M
- Federal contractDefense · Serdp WP22-3296 Functional Additives To Improve Fluorine-free Fire Suppressant Foams$1.5M
- Federal grantDefense · Phase II · Stackable Portable Oxygen Generator for Deployed Army Casualty Care$1.1M
- Federal grantEnergy · Phase II · A New Sorbent Process for Transformational Carbon Capture Process$1.1M
- Federal contractDefense · Tda Research, Inc. WP22-7456 - Demonstration And Validation Of Pfas-free Fire Suppression Foam$989K
- Federal grantDefense · Phase I · Homocomposite Radomes$240K
- Federal contractDefense · SBIR Phase I.$240K
- Federal grantDefense · Phase I · Ammonium Perchlorate Replacement for Propellants$150K
- Federal contractNASA · In Circuit Energy Storage Device For Extreme Environments$150K
- Federal contractNASA · Solid-state Rechargeable Batteries For Extreme Lunar Surface Environments$150K
- Federal contractDefense · Sbir/sttr Phase I Research & Development - New High Performance Solid Propellant Ingredients$150K
- Federal grantNASA · Phase I · Low Temperature Durable Siloxane/epoxy Nanocomposite Coating for Drastic Reduction in Lunar Particulate Adhesion$150K
- Federal grantDefense · Phase I · 3D Kinematic Deformation Sensor Grid$250K
- Federal grantEnergy · Phase I · A Novel Sorbent-assisted Steam Methane Reforming Process for Production of Blue Hydrogen$250K
- Federal grantEnergy · Phase I · Modular H2 Separation System for Biomass Gasification$250K
- Federal grantEnergy · Phase I · Sustainable Automotive Composites Using Surface-Modified Cellulose Fibers$200K
- Federal grantDefense · Phase I · Improved Surface Preparation for Fluorescent Penetrant Non-Destructive Inspection$140K
- Federal grantEnergy · Phase I · A New Direct Air Capture System Operating on Low Grade Heat Generated from Geothermal Plants$250K
- Federal grantEnergy · Phase I · Low cost, High Efficiency Krypton Capture Technology$200K
- Federal grantDefense · Phase I · 3D Printed, Modular E-Skin for Submersible and Scalable Tactile Sensing$240K
- Federal grantDefense · Phase I · Enhanced Combat Tourniquet with Modular Wound Infection Prevention Capabilities$250K
- Federal grantHomeland Security · Phase I · Low-cost Diagnostic for Animal and Zoonotic Diseases$150K
- Federal grantAgriculture · Bacterial Plant Pathogens Present A Formidable Challenge To Growers Because There Are Few Pesticide Products Available To Deal With Them. Current Bacterial Disease Management Methods Routinely Use Copper-containing Bactericides, Which Are One Of The Oldest Pesticides Available. Plants Have Different Sensitivities To Copper Phytotoxicity And Bacterial Pathogens Are Becoming Resistant To Copper. Growers Have Requested And Required New Bactericidal Tools To Mitigate Economically Significant Damagin$170K
- Federal grantNASA · Phase II · Resins for Rapid Manufacturing of C-C Composites$750K
- Federal contractDefense · STTR Phase I, Ffp, Topic A21C-T016$1.3M
- Federal contractDefense · Develop New Engineered Beads And Incorporate Them Into Fabric Materials That Can Self-detoxify Cwas Or Tics Using Mof Materials$1.1M
- Federal contractDefense · Phase I SBIR Topic - A214-012-0566$260K
- Federal grantEnergy · Phase II · Nanoporous Anion Exchange Membranes for Solar Fuel Generators$1.1M
- Federal grantDefense · Phase I · Development of a Chemical Sterilant for Use in Austere Environments$250K
- Federal grantDefense · Phase II · Ignition Composition with Low Moisture Susceptibility$698K
- Federal grantEnergy · Phase I · Dense 3D Nanoscale Electrode Batteries with a Conformal Solid Electrolyte$200K
- Federal contractDefense · Feasibility Study, SBIR Phase I, Topic SOCOM213- 002, Concentrated Atropine Sulfate Formulations$150K
- Federal contractDefense · SBIR Phase II R&d$1.7M
- Federal contractDefense · Dha 2020.2 SBIR Phase II Medical R&d Contract For Proposal #H2-0650, Titled: "technology For Portable Dialysate Generator" Log #21000272$1.1M
- Federal contractEnvironmental Prot · Epa SBIR FY21-22 Phase I Baa Solicitation - A New Photocatalyst Based Air Treatment System To Reduce The Risks From Transmission Of Viruses And Bacteria$100K
- Federal contractEnvironmental Prot · Epa SBIR FY21-22 Phase I - Metal Organic Frameworks For Low Cost Radon Mitigation$100K
- Federal grantAgriculture · Ammonia Emissions Are One Of The Major Air Quality Concerns At The Global, National And Regional Levels. Ammonia Emissions From Poultry Farms Account For 27% Of The U.S. Total Atmospheric Ammonia Emissions. High Ammonia Levels Are A Concern Both Inside And Outside The Poultry House; It Is A Precursor Of Acid Rain And Significantly Compromises Poultry Welfare. It Is Not Just Malodorous, But Has Significant Hazardous Effect On The Health Of Caretakers. Ammonia Levels Are Particularly Important Dur$650K
- Federal contractHealth and Human S · SBIR Topic 111, Phase I, Oxygen Delivery Device Innovations$300K
- Federal contractDefense · Tda Research, Inc. Serdp WP21-1056$1M
- Federal contractHomeland Security · SBIR Crpp Wearable Chemical Sensor Badge.$269K
- Federal contractNASA · Ceramic Springs$75K
- Federal grantDefense · Phase I · Composite Helmet to Mitigate Concussive Force$250K
- Federal grantDefense · Phase I · Hemp-based Fabric for Military Uniforms$140K
- Federal grantDefense · Phase I · Ceramic Fiber Manufacturing$140K
- Federal grantEnergy · Phase II · Mitigating Stress Corrosion Cracking in Spent Nuclear Fuel Dry Storage Casks$1.1M
- Federal contractDefense · New Purchase Order For Medical R&d Dha SBIR Ph I H211-009-0191 Project Titled, "stackable Portable Oxygen Generator For Deployed Army Casualty Care"$250K
- Federal contractDefense · SBIR Phase II$800K
- Federal grantNASA · Phase II · Rapid Manufacturing of C-C Composites for Thermal Management$750K
- Federal grantDefense · Phase I · Portable Air Contaminant Control System$140K
- Federal contractDefense · SBIR Phase 1 Award, N211-026$240K
- Federal grantDefense · Phase II · Active EOD Bomb Suit Cooling Shirt$1.5M
- Federal grantEnergy · Phase I · Ionic Liquid-based Electrowinning for Refining of Rare Earth Oxides/Salts$250K
- Federal grantDefense · Phase I · Technology for a Sterile Water for Irrigation Generator$150K
- Federal contractNASA · Carbon-carbon Composites (c/c) Are Currently Used As Hot Structures In A Variety Of Extreme Environments Encountered During Hypersonic Flight, Rocket Launch And Atmospheric Entry, Descent And Landing.$125K
- Federal contractNASA · Water Recovery From Wastewater Is Considered Required For Long-duration Human Exploration Missions Away From Earth.$125K
- Federal contractNASA · A Regenerable Purification System To Remove Sulfur And Halide Impurities$125K
- Federal contractNASA · Additive Manufacturing Of Structured Sorbents For CO2 And H2O Removal$125K
- Federal grantDefense · Phase I · Efficient Production of Low-cost Battery Electrode Materials$150K
- Federal contractDefense · Phase I SBIR Proposal L203-004-0058 Po 8508190679 12 Month Pop$300K
- Federal grantDefense · Phase II · Technology for Genitourinary Tissue Repair$1.5M
- Federal contractDefense · SBIR Phase II Year 1 Topic A19-022$1.1M
- Federal contractDefense · Award Of Tda's Dha SBIR Sequential Phase II Medical R&d Contract From PROPOSALH2#-0016, For "optimal Rewarming Solutions For Cryopreserved Tissue Systems"$1.5M
- Federal contractDefense · Tda Research, Inc. Small Business Innovation Research Phase 1 Using Mofs For Textile Applications$167K
- Federal grantDefense · Phase I · Modular Technology for Closed-Cycle Potable Water Production$50K
- Federal grantEnergy · Phase I · Nanoporous Anion Exchange Membranes for Solar Fuel Generators$200K
- Federal grantDefense · Phase II · Rapid Prototyped 3D Printed Filters for CW Agent Protection$1.0M
- Federal grantDefense · Phase II · Evaluation and Development of Military Working Dog Decontamination Kit$647K
- Federal contractDefense · First Monthly Technical Report$1.5M
- Federal grantHealth and Human S · Phase I · Filtration Media for In-Home PFAS Removal from Drinking Water$225K
- Federal grantDefense · Phase II · Strength Loss Indicator for Webbing$800K
- Federal contractDefense · STTR 2 N19B-T032 Contract Award$1.1M
- Federal contractDefense · Dha 2020.2 SBIR Phase I Medical R&d Purchase Order For Proposal #H202-004-0017, Titled: Technology For Portable Dialysate Generator" Log 20000123$249K
- Federal grantDefense · Phase II · Expeditionary Portable Oxygen Generator System$1.0M
- Federal contractDefense · Phase I First Monthly Technical Report-$166K
- Federal grantDefense · Phase I · Rapid Manufacturing of Toughened Carbon Carbon Composites$150K
- Federal grantDefense · Phase I · Cost Effective Synthesis of Linear Ring Opening Metathesis Polymers$167K
- Federal grantDefense · Phase I · SiC SiC Fasteners$140K
- Federal grantDefense · Phase I · Direct Seawater Electrolyzer/Fuel-Cell Coupled System for Electricity and Potable Water$240K
- Federal contractDefense · Kick-off Briefing Materials$140K
- Federal grantDefense · Phase I · Nano-synthetic Materials Smart System Enabling Sensor Discovery and Fabrication$250K
- Federal contractDefense · Conduct Development Of A Deployable Munition Capable Of Disseminating An Obscurant Quickly Over A Volume At Least 5 Meters In Diameter And 10 Meters Long When Ejected.$111K
- Federal grantAgriculture · Novel System To Reduce Air Pollution From Poultry Production Systems$100K
- Federal grantAgriculture · Wood Flour Is A Forest Waste Product Used As A Filler In Plastic Composites, But Due To The WOOD'S Hydrophilicity It Is Difficult To Blend Into A Hydrophobic Polymer Matrix. This Results In Wood Agglomeration And Creates Voids, Reducing The COMPOSITE'S Mechanical Strength. This Can Be Mitigated By Chemically Functionalizing The Wood Flour To Impart Hydrophobicity. While Promising, Academic Investigations Have Not Led To A Commercial Process. Tda Research, Inc. (tda) Proposes To Develop A$96K
- Federal contractHealth and Human S · FY20 SBIR Phase 1 Topic #400 - Tda Radi-sense: Encapsulated Nanoparticle Oxygen Imaging Agents For Radiotherapy Guidance$400K
- Federal contractNASA · A New Oxygen Recovery Process To Reduce Waste From Propellant Tanks$125K
- Federal contractNASA · Rapid Manufacturing Of C-c Composites For Thermal Management$125K
- Federal grantEnergy · Phase II · Onboard Monitoring Method for Detection of Damage to Carbon Fiber Composite Overwrap on Hydrogen Fuel Tanks$1.1M
- Federal grantNASA · Phase I · High Capacity Sorbents for Removal of Problematic Contaminants from Processed Wastewater$125K
- Federal contractDefense · The Purpose Of This Action Is To Award A SBIR Phase I Contract.$111K
- Federal grantEnergy · Phase I · Stress Corrosion Cracking Mitigation Coating$200K
- Federal grantEnergy · Phase I · Novel Utilization Strategies for Ocean Plastic Wast$207K
- Federal contractHomeland Security · The Purpose Of Contract Is To Award A New SBIR Contract To Develop A Power Module For First Responders (pmfr) That Would Service All The Current And Emerging Requirements Of On-body Devices.$1M
- Federal grantDefense · Phase II · An Alternative Corrosion-Resistant Coating to be Applied to Aluminum and Magnesium$750K
- Federal grantHealth and Human S · Phase I · A Catalytic Filter System for Indoor Air Quality Improvement$225K
- Federal contractEnvironmental Prot · SBIR Phase II Proposal #B19P2-7A01-DEVELOPMENT Of A Non-toxic Paint Stripper. Tda Research, Inc.$300K
- Federal contractDefense · SBIR Phase I$240K
- Federal contractDefense · SBIR Phase I - Cleaning Personal Protective Equipment Of Military Firefighters$111K
- Federal grantEnergy · Phase II · Highly Selective Anion Exchange Membranes for Non-aqueous Redox Flow Batteries$1M
- Federal grantDefense · Phase I · Novel NDE of Defects in Li Ion Batteries$150K
- Federal grantDefense · Phase II · Fluorine-free AFFF Replacement$748K
- Federal grantDefense · Phase I · Cleaning Personal Protective Equipment of Military Firefighters$111K
- Federal grantDefense · Phase I · Evaluation and Development of MIlitary Working Dog Decontamination Kit$167K
- Federal grantDefense · Phase I · Defoamer Solution and Delivery System for Rapid Collapse of Hi-EX Foam$150K
- Federal grantDefense · Phase II · Innovative Material (and Application Method) for a Hydrophobic/Oleophobic Coating to an Aluminum-Bodied Heat Exchanger$749K
- Federal contractDefense · Research And Development$999K
- Federal grantDefense · Phase II · Low-Density, Low-Volume Explosion Suppression Material for Aircraft Fuel Tanks$750K
- Federal contractDefense · STTR Phase 1 N19B-T032 Award$240K
- Federal contractDefense · Phase III SBIR Effort$610K
- Federal contractDefense · Research And Development$1.5M
- Federal grantDefense · Phase I · Ceramic Durable Solid Lubricant Coating for Firearms$140K
- Federal contractDefense · Research And Development.$240K
- Federal contractDefense · SBIR Phase II - T2-0361 Application Of Ultra-low Cost Differential Pressure Sensors To The Large N Acoustic Sensor Problem$1.0M
- Federal grantHealth and Human S · Phase I · Cuff Electrodes with Soft Wire Electrical Leads$245K
- Federal contractDefense · Exhaust Gas Temperature Sensing Using Thermally Luminescent Compounds$750K
- Federal grantEnergy · Phase II · A New Sorbent Process for Transformational Carbon Capture Process$1M
- Federal grantEnergy · Phase II · Highly Efficient Smart Tanks for Hydrogen Storage$1M
- Federal grantNASA · Phase II · Ceramic Springs$750K
- Federal contractNASA · Hypersonic Aircraft, Especially Reusable Hypersonic Aircraft, Require Advancements In High Temperature Materials Because Of The Extreme Temperatures Resulting From Frictional Heating.$825K
- Federal contractDefense · 6 Month SBIR Phase I Topic A19-022. The Contractor Shall Research And Develop A Chemical Hydrogen Gas Generator$162K
- Federal grantDefense · Phase I · A Novel NDE Instrument for Carbon-Carbon Materials for Hypersonic Applications$150K
- Federal grantHealth and Human S · Phase II · Novel Polymer Matrix for Dental Applications$492K
- Federal contractDefense · SBIR Phase II - Energetic Modification Of Aluminum Nanoparticles Proposal A2-7535 Topic A12-012$1.0M
- Federal grantEnergy · Phase I · Atomically Precise Membranes for Advanced Gas Separations$200K
- Federal grantEnergy · Phase I · Onboard Monitoring Method for Detection of Damage to Carbon Fiber Composite Overwrap on Hydrogen Fuel Tanks$200K
- Federal contractDefense · Award Of Tda's Dha 18.1(A) SBIR Phase II Medical R&d Contract From Proposal H2-0449 For "chronological Sweat Sensor Patch For Real-time Human Molecular Biomarker Monitoring"$1.1M
- Federal contractHomeland Security · The Purpose Of This Action It To Issue SBIR 19.1 Phase I Contract To Tda Research, Inc.$150K
- Federal grantDefense · Phase I · Rapid Prototyped 3D Printed Filters for CW Agent Protection$150K
- Federal grantDefense · Phase I · Chemical Hydrogen Gas Generator Based on Aluminum Alloy/Water Reaction$162K
- Federal contractDefense · Dha 17.2 SBIR Phase II Medical,research And Development Contract From Proposal H2-0426, Topic: DHA172-011 Titled "lightweight, Compact System For Generating Lactated Ringer's Solution".$999K
- Federal contractEnvironmental Prot · Tda Research, Inc. SBIR Phase I$100K
- Federal contractEnvironmental Prot · Tda Research, Inc. SBIR Phase I$100K
- Federal grantDefense · Phase II · Tactical Active Anti-Fogging Goggle or Spectacle$999K
- Federal contractDefense · Small Business Innovative Research Via An Alternative Corrosion-resistant Coating To Be Applied To Aluminum And Magnesium Seconder$150K
- Federal grantDefense · Phase II · Advanced PEM Electrocatalysts for Submarine Oxygen Generators$1.5M
- Federal grantEnergy · Phase I · Highly Selective Anion Exchange Membranes for Non-aqueous Redox Flow Batteries$150K
- Federal grantDefense · Phase II · Energetic Modification of Aluminum Nanoparticles$495K
- Federal grantDefense · Phase II · On Demand Energy Activated Liquid Decontaminants and Cleaning Solutions$1.0M
- Federal contractDefense · Research And Development Igf::ot::igf$125K
- Federal contractDefense · SBIR Phase I Topic - Conductive Propellant Additives For Electrical Ignition$150K
- Federal contractDefense · SBIR Phase I Non-fluorinated Afff Replacement$150K
- Federal contractDefense · Igf::ot::igf - Research And Development$744K
- Federal grantDefense · Phase II · Low Hyrdrogen Embrittlement (LHE) Brush Plating Chemistries for Cadmium (Cd) Replacement$750K
- Federal contractDefense · Fy 2017 Baa For Multi-fuel Reformer For Battlefield Hydrogen.$998K
- Federal contractDefense · Base Year (12 Months)$1.2M
- Federal contractDefense · Research And Development Igf::ot::igf$225K
- Federal grantHealth and Human S · Phase II · Novel Polymer Matrix for Dental Applications$992K
- Federal grantHealth and Human S · Phase I · Cuff Electrodes with Soft Wire Electrical Leads$492K
- Federal grantAgriculture · The Greenhouse Requires An Environment That Has Optimum Nutrients, Temperature, Water And Light So That It Is Conducive To Rapid, Healthy Plant Growth. Undesirable Organisms Also Grow In Such An Environment, Including Disease-causing Microbial Plant Pathogens And Slimy Microbial Biofilm Organisms That Are Difficult To Remove And Can Cause Worker Hazards. Growers Need A Universally Effective Antimicrobial Disinfectant That Can Be Used Against Undesirable Microbes In A Greenhouse Environment And P$594K
- Federal grantEnergy · Phase II · Surface Modification of Cellulose Nanomaterial for use in Hydrophobic Matrix Materials$1M
- Federal contractDefense · STTR Phase II$1.0M
- Federal contractNASA · Human Exploration Of Mars, As Well As Unmanned Sample Return Missions From Mars Can Benefit Greatly From The Use Of Propellants And Life-support Consumables Produced From The Resources Available On Mars Mars CO2 Rich Atmosphere Offers An Abundant Staring Material On Which To Synthesize Needed Resources Such As Oxygen, Carbon Monoxide, And Methane. The Preferred Method Of Oxygen Generation Uses A Solid Oxide Electrolyzer (soe) To Produce Oxygen In One Stream And A Mixture Of Carbon Monoxide And $125K
- Federal contractNASA · Hypersonic Aircraft, Especially Reusable Hypersonic Aircraft, Require Advancements In High Temperature Materials Because Of The Extreme Temperatures Resulting From Frictional Heating. One Aspect Of This Problem Is Making Seals That Can Function Through A Very Large Temperature Range, Perhaps Up To 1000 C Or Higher. Metallic Springs Essentially Lose Their Ability To Function At 600 C Or Below. Ceramic Springs, Principally Made Of Silicon Nitride, Are Capable Of Functioning Throughout That Tempera$125K
- Federal contractNASA · Tda Research Inc.(tda) In Collaboration With University Of Puerto Rico Mayaguez (uprm Is Proposing To Develop A Highly Efficient CO2 Removal System Based On Uprm Proprietary Strontium Exchanged Silico-alumino-phosphate (SR-SAPO-34) Sorbent For Closed Loop Space Craft Cabin Air Re-vitalization During Deep Space Missions. In The Phase I Work, We Successfully Completed Bench-scale Proof-of-concept Demonstrations, Elevating The Trl To 3. In Phase II, We Will Further Optimize The Sorbent And Scale-$750K
- Federal contractNASA · This Statement Of Work (sow) Addresses Material Supply Request For The US International Space Station (iss) Ammonia Scrubber. The Intent Of This Statement Of Work Is To Outline Activities And Deliverables To Support Delivery Of Class I Flight Grade Sorbent Media To Support A November 2018 Flight Date. The Ammonia Scrubber Is Designed To Remove Ammonia From The Cabin Of The Commercial Crew Vehicles During An Ammonia Leak On The International Space Station. Tda Developed A Sorbent Media Designe$269K
- Federal grantEnergy · Phase I · A New Process for Energy-Efficient Dewatering Methods for Cellulosic Nanomaterials$150K
- Federal grantEnergy · Phase I · Ionic Liquid – Nanoporous Polymer Hybrid Electrolyte Membranes for Vehicle Lithium Ion Batteries$150K
- Federal grantEnergy · Phase I · Highly Efficient Smart Tanks for Hydrogen Storage$150K
- Federal grantDefense · Phase II · Corrosion Indicating Coatings for Aircraft Bilges and Wheel Wells$750K
- Federal contractDefense · Corrosion Indicating Coatings For Aircraft Bilges And Wheel Wells$1.5M
- Federal grantDefense · Phase I · Feasibility Study for Development of a Military Tactical Spectacle with an Active Anti-fogging System$150K
- Federal grantDefense · Phase I · Smart Sweat Sensor Patch for Realtime Monitoring$150K
- Federal contractDefense · Research And Development Igf::ot::igf$225K
- Federal grantDefense · Phase I · Low-cost, High Thermal Conductivity Interface Materials$125K
- Federal contractDefense · Research And Development Igf::ot::igf$225K
- Federal grantNASA · Phase II · Novel Sorbent to Remove Radioactive Halogens and Noble Gases from NTP Engine Exhaust$750K
- Federal contractDefense · Exhaust Gas Temperature Sensing Using Thermally Luminescent Compounds$150K
- Federal grantEnergy · Phase I · Nanostructured Carbon-Based Gas Diffusion Layers for Enhanced Fuel Cell Performance$150K
- Federal grantEnergy · Phase I · Methane Aromatization in a Membrane Reactor$150K
- Federal contractHomeland Security · Igf::ot::igf Department Of Homeland Security, Science And Technology, FY17.1 Phase II Contract Proposal Title: Wearable Smart Chemical Sensors$750K
- Federal grantDefense · Phase I · Low Cost Large N Acoustic Array$150K
- Federal grantDefense · Phase I · Lightweight, Compact System for Generating Lactated Ringer's Solution$150K
- Federal grantHealth and Human S · Phase II · UHMWPE Composite Material for Joint Implants$334K
- Federal grantDefense · Phase II · Advanced Materials for Carbon Dioxide (CO2) Capture$500K
- Federal contractDefense · BASE$1M
- Federal grantDefense · Phase II · Genitourinary Tissue Repair, Restoration and Protection: Preserving Fertility and Function in Wounded Warriors$1.0M
- Federal grantDefense · Phase II · Advanced Filtration System for Serum Potassium$1.0M
- Federal contractDefense · Igf::ot::igf Dha SBIR Phase II Proposal A2-6698$984K
- Federal contractDefense · Igf::ot::igf Dha SBIR Phase II Award$2M
- Federal contractDefense · Igf::ot::igf Dhp SBIR Phase II Proposal H2-0195$998K
- Federal contractDefense · Igf::ot::igf Dhp Phase I Proposal H171-006-0104 Topic DHA17-006 Intelligent Thermal Desorption Tube Sequential Sampler Erms 17100002$150K
- Federal grantAgriculture · Biological Efficacy And Phytotoxicity Optimization Of A Novel Oxidant Product For Plant Production$595K
- Federal contractEnvironmental Prot · Igf::ot::igf SBIR Phase I: Tda Research, Inc.$100K
- Federal grantDefense · Phase II · Chromate-Free Flexible Coating$750K
- Federal grantEnergy · Phase II · Hydrogen Generation from Vacuum Gas Oil (VGO)$1M
- Federal grantAgriculture · Novel Oxidant Product Formulation For Greenhouse Disinfection$100K
- Federal contractDefense · Igf::ot::igf Brush-plated Low Hydrogen Embrittlement Tin-zinc Alloy Coating For The Replacement Of Cadmium$150K
- Federal contractNASA · Igf::ot::igf Tda SBIR Phase III Improved Materials And Hardware For Trace Contaminant Control$167K
- Federal grantEnergy · Phase I · Surface Modification of Cellulose Nanomaterial for Use in Hydrophobic Matrix Materials$150K
- Federal grantNASA · Phase I · H2/He Separation System$125K
- Federal contractDefense · Igf::ot::igf Corrosion Indicating Coatings For Aircraft Bilges$150K
- Federal contractHomeland Security · Igf::ot::igf Department Of Homeland Security, Science And Technology. FY17.1 Phase I Contract Proposal Title: Wearable Chemical Sensor Badge$100K
- Federal grantEnergy · Phase II · Molecularly Precise Nanoporous Desalination Membranes$1M
- Federal grantDefense · Phase I · Perfusion Technology for Vascular Composite Tissue Conservation and Maintenance$100K
- Federal contractDefense · Igf::ot::igf Proposal A161-049-0713$29K
- Federal grantDefense · Phase II · Ignition Composition with Low Moisture Susceptibility$396K
- Federal contractDefense · Igf::ot::igf Research And Development$842K
- Federal grantDefense · Phase II · Innovative, High-Energy, High Power, Light-Weight Battery Storage Systems Based on Li-air, Li-sulfur (Li-S) chemistries$1.1M
- Federal contractEnvironmental Prot · Igf::ot::igf Fund 2017 SBIR Phase II New Award- Tda Research, Inc. - Isocyanate-free Polyurethane Coating$300K
- Federal contractDefense · Igf::ot::igf SBIR Phase I Research And Development$150K
- Federal grantDefense · Phase II · Highly Stable Carbon Fiber Composite Ablators$999K
- Federal contractDefense · Status Report Igf::ot::igf$150K
- Federal grantDefense · Phase I · Technology for Genitourinary Tissue Repair$150K
- Federal grantHealth and Human S · Phase I · Improved Respirator Carbons for Ammonia Hazards$150K
- Federal grantDefense · Phase I · Low-cost Rapid Stand-off Detection of Explosives$100K
- Federal grantDefense · Phase II · Expeditionary Portable Oxygen Generation System$750K
- Federal grantAgriculture · A Biological Efficacy And Phytotoxicity Study Of A Novel Oxidant Product For Plant Protection Against Pathogens$100K
- Federal contractDefense · Status Report Igf::ot::igf$150K
- Federal grantAgriculture · Efficient Process For The Production Of A Drop-in Diesel Fuel Oxygenate From Bio-succinic Acid$100K
- Federal grantDefense · Phase I · Contaminated Material Encapsulation Technology for Transportation$150K
- Federal grantEnergy · Phase II · Warm Gas Multicontaminant Removal System$1M
- Federal contractDefense · Final Technical Report Base Period Igf::ot::igf$100K
- Federal contractDefense · Igf::ot::igf. Dhp Phase II Proposal H2-0175 Entitled, "optimal Rewarming Solutions For Cryopreserved Tissue Systems".$1.0M
- Federal grantHealth and Human S · Phase I · Advanced Cooling System for Mine Rescue Rebreathers$150K
- Federal grantDefense · Phase I · Compact Ruggedized Field-Use Platelet Apheresis$80K
- Federal grantDefense · Phase I · Improved Synthesis and Characterization of New Energetic Compounds$80K
- Federal contractDefense · IGF::OT::IGF!8503401330!SERVICES - Manag$100K
- Federal grantHealth and Human S · Phase I · Development of Optimized Endectocide-treated Bird Feed Formulations for West Nile Virus Control$150K
- Federal contractDefense · Igf::ot::igf Phase I SBIR "chromate-free Flexible Primer"$150K
- Federal contractNASA · Igf::ot::igf SBIR Phase III Contract With Tda Research Design, Manufacture, Test, And Performance Reporting Of A Water Save System That Fits In A Single Locker$150K
- Federal grantEnergy · Phase I · Hydrogen Generation from Vacuum Gas Oil$150K
- Federal grantEnergy · Phase I · Atomically Precise Catalysts for the Conversion of Glycerol to High Value Chemical Intermediates$150K
- Federal grantEnergy · Phase I · Study and Prediction of Chlorine Induced Stress Corrosion Cracking$150K
- Federal grantNASA · Phase I · Polyethylene Production from In-Situ Resources in Microchannel Reactors$125K
- Federal grantNASA · Phase I · High Char Flexible Polymers$125K
- Federal contractNASA · Igf::ot::igf Tda Research Inc.(tda) In Collaboration With University Of Puerto Rico Mayaguez (uprm Is Proposing To Develop A Highly Efficient CO2 Removal System Based On Uprm Proprietary Strontium Exchanged Silico-alumino-phosphate (SR-SAPO-34) For Closed Loop Space Craft Cabin Air Re-vitalization During Deep Space Missions.$125K
- Federal contractNASA · Igf::ot::igf A Recent Trade Study Showed That Active Removal Of Ammonia (NH3) And Formaldehyde (CH2O) Is Crticial To Meeting The 24-HR Smac Limits In The Advanced Space Suit Designs (jennings 2009). Tda Research, Inc. (tda) Proposes To Develop A New Tccs For The Plss Based On A Combination Of A Regenerable NH3 Sorbent And An Ambient Temperature Catalyst That Can Oxidize Formaldehyde Into Much More Benign CO2 To Control The Concentration Of These Contaminants In The Spacesuit Ventilation Loop. $125K
- Federal grantNASA · Phase II · Multifunctional Polyolefin Matrix Composite Structures$750K
- Federal contractDefense · Vector Protection - Determination Of Active Ingredient Levels For A New Pyrethroid Uniform Treatment Formulation$682K
- Federal contractDefense · Igf::ot::igf SBIR Phase II$746K
- Federal grantDefense · Phase I · Conducting Elastomeric Electrodes for Bio-Interface Applications$150K
- Federal contractDefense · Igf::ot::igf$100K
- Federal grantHealth and Human S · Phase II · UHMWPE Composite Material for Joint Implants$493K
- Federal grantEnergy · Phase I · Chemical Looping Dry Reforming for Converting Shale Gas to Liquid Fuels and Chemicals$150K
- Federal grantEnergy · Phase I · Molecularly Precise Nanoporous Desalination Membranes$150K
- Federal contractDefense · Igf::ot::igf SBIR I: Vapor And Aerosol Wearable Passive Dosimeter$150K
- Federal contractDefense · Igf::ot::igf SBIR Phase I Research And Development$140K
- Federal contractNASA · Igf::ot::igf The Orion Multi-purpose Crew Vehicle (mpcv) Needs An Emergency Breathing System, In The Event That The Cabin Atmosphere Becomes Contaminated From A Chemical Spill, Or From A Fire. The Emergency Breathing Needs For Orion Are Similar To, But Not The Same As, The Emergency Breathing Needs On Iss. Iss Is A Large Vehicle, With A Slow Cleanup Time - It Needs Up To 8 Hours Of Breathing Protection. But Because Iss Has A Series Of Safe Havens And Isolation Hatches, The Astronaut Can Retreat$185K
- Federal contractDefense · SBIR Pi R&d. Igf::ot::igf$150K
- Federal grantDefense · Phase II · Chromate-Free Fuel Tank Coating$750K
- Federal contractDefense · Igf::ot::igf. SBIR Phase I Dhp 15.1 H151-014-0172 Entitled "novel Rewarming Technique For Cryopreserved Tissue."$150K
- Federal grantAgriculture · A Regenerable Sorbent For Deep Desulfurization Of Alpha Pinene$500K
- Federal contractEnvironmental Prot · Igf::ot::igf 2015 SBIR Phase I Award - Tda Research, Inc.$100K
- Federal grantHealth and Human S · Phase I · Antimicrobial Coatings to Reduce Hospital Infections$144K
- Federal grantDefense · Phase II · Paint Additive for Early Detection of Corrosion$1M
- Federal contractInterior · Igf::ot::igf This Research&development Effort Is To Support The Department Of Homeland Securities (dhs) Requirement For The Ability To Respond To An Attack With Biological Agents. Specifically Dhs Requires A Decontaminant To Kill Anthrax Spores On Building Exteriors, And Even Large Outdoor Areas. The Objective Is To Optimize The New Decontaminant To Meet National Security Needs.$750K
- Federal grantHealth and Human S · Phase II · End-of-Service Life Indicator (ESLI)$525K
- Federal contractNASA · Igf::ot::igf Lightweight And Compact Multifunction Computer-controlled Strength And Aerobic Training Device Sap Purchase Requisition: 4200554633$84K
- Federal contractNASA · Igf::ot::igf Polyethylene, And Ultrahigh Molecular Weight Polyethylene (uhmwpe) In Particular, Is An Outstanding Material For Radiation Shielding In The Sense That Its Extraordinarily High Hydrogen Content Both Minimizes The Production Of Secondary Ions During Exposure To Energetic Radiation And Captures Neutrons. Its Low Density And High Wear Resistance Also Make It Attractive For The Structures Of Manned Spacecraft And Extraterrestrial Habitats. However, Its Use In Structures Is Limited By Fla$125K
- Federal contractDefense · SBIR Phase I Topic N151-025 Igf::ot::igf$150K
- Federal grantDefense · Phase II · Novel Trap for Ticks and Fleas Incorporating a CO2 Generator$1.0M
- Federal contractInterior · Igf::ot::igf Lightweight, Man-portable,low-power Individual Water Purification System$100K
- Federal contractDefense · Igf::ot::igf Develop.of Vector Arthropd Pitfall Or Sticky Trap - SBIR II$998K
- Federal contractDefense · "igf::ct::igf" SBIR Phase II$989K
- Federal contractNASA · Igf::ot::igf An On-board Oxygen Concentrator Is Required During Long Duration Manned Space Missions To Supply Medical Oxygen. The Commercial Medical Oxygen Generators Based On Pressure Swing Adsorption (psa) Are Large And Highly Power Intensive. Tda Research, Inc. (tda) Proposes To Develop A Small, Lightweight, Portable Oxygen Generator Based On A Vacuum Swing Adsorption (vsa) To Produce Concentrated Medical Oxygen. The Unit Uses Ambient Vehicle Cabin Air As The Feed And Delivers High Purity Oxy$755K
- Federal grantDefense · Phase I · Lightweight, Man-Portable, Low-Power Individual Water Purification System$150K
- Federal contractNASA · Igf::ot::igf An On-board Oxygen Concentrator Is Required During Long Duration Manned Space Missions To Supply Medical Oxygen. The Commercial Medical Oxygen Generators Based On Pressure Swing Adsorption (psa) Are Large And Highly Power Intensive. Tda Research, Inc. (tda) Proposes To Develop A Small, Lightweight, Portable Oxygen Generator Based On A Vacuum Swing Adsorption (vsa) To Produce Concentrated Medical Oxygen. The Unit Uses Ambient Vehicle Cabin Air As The Feed And Delivers High Purity Oxy$755K
- Federal contractDefense · Igf::ot::igf Paint Additve For Early Dectection Of Corrosion ~ SBIR Phase II$1M
- Federal grantHealth and Human S · Phase II · UHMWPE Composite Material for Joint Implants$408K
- Federal contractDefense · Aluminum Alloy Corrosion Control And Prevention$2.1M
- Federal grantEnergy · Phase I · A Renewable Polymer from Fast Pyrolysis of Biomass$150K
- Federal grantDefense · Phase II · Soft and Elastomeric Intramuscular Electrode with Therapeutic Delivery Capability$1.0M
- Federal contractNASA · Igf::ot::igf The Goals Of The Phase III Program Is To Upgrade The Software Of The Ngred Developed During Phase II To Accommodate Aerobic Functionalities In The Form Or A Rowing Machine And To Improve The Usability Of The Ngred For Future Testing At NASA. To Accomplish These Goals, We Will Execute The Following Tasks.$50K
- Federal grantDefense · Phase I · High Stability Composite Ablative Insulator$125K
- Federal grantDefense · Phase I · Electroplated Alloys for Replacement of Hard Chrome on Stainless Steel Actuators$150K
- Federal contractHomeland Security · Igf::ot::igf New SBIR Phase I Contract$100K
- Federal contractNASA · Igf::ot::igf Human Exploration Of Mars, As Well As Unmanned Sample Return Missions Can Benefit Greatly From Use Of Propellants And Life-support Consumables Produced From The Resources Available On Mars. The First Major Step Of Any In-situ Propellant Production System Is The Acquisition Of Carbon Dioxide From The Mars Atmosphere And Its Compression For Further Chemical Processing. Tda Research Inc. Proposes To Develop A Compact, Lightweight, Advanced Sorbent-based Compressor To Recover High-press$125K
- Federal contractNASA · Igf::ot::igf An On-board Oxygen Concentrator Is Required During Long Duration Manned Space Missions To Supply Medical Oxygen. The Commercial Medical Oxygen Generators Based On Pressure Swing Adsorption (psa) Are Large And Highly Power Intensive. Tda Research, Inc. (tda) Proposes To Develop A Small, Lightweight, Portable Oxygen Generator Based On A Vacuum Swing Adsorption (vsa) To Produce Concentrated Medical Oxygen. The Unit Uses Ambient Vehicle Cabin Air As The Feed And Delivers High Purity Oxy$125K
- Federal contractNASA · Igf::ot::igf Tda Research Proposes To Develop A Computer-controlled Lightweight And Compact Device For Aerobic And Resistive Training (dart) To Counteract Muscular Atrophy And Bone Loss And To Improve The Overall Wellness Of Astronauts Operating In Microgravity. The Dart Will Be Able To Provide Resistive Loads Up To 350 Lbf And Will Accurately Simulate The Load Profile Of A Mass In A 1-G Environment. It Will Also Be Capable Of Applying Custom Load Profiles Such As Eccentric Overloading. In Aerob$125K
- Federal contractNASA · Igf::ot::igf Tda Research, Inc. (tda) Proposes To Develop A Post-fire Air Purification System That Consists Of A Particulate Removal Assembly, A Sorbent Bed To Remove The Combustion By-products Generated By Low Intensity Fires (such As Hcn, Hcl, SO2 And NH3) And An Ambient Temperature Oxidation Catalyst To Eliminate Any Carbon Monoxide (co) And Volatile Organic Compounds (vocs). The Unit Will Be Designed To Rapidly Restore The Cabin Air To A Safe Condition. In Phase I, We Will First Evaluate The$125K
- Federal contractDefense · Phase I SBIR Topic A14-003; Entitled "paint Additive For Early Detection Of Corrosion"$150K
- Federal contractDefense · N141-080$80K
- Federal contractDefense · Igf::ot::igf SBIR Topic N141-017 "enviromentally Friendly Altenative Synthesis And Process To Manufacture Cost-effective Hexanitrohexaazaisowurtzitane."$80K
- Federal contractDefense · Igf::ot::igf SBIR I: Tda Research: Chromate-free Fuel Tank$150K
- Federal contractDefense · Igf::ot::igf Twelfth Monthly Technical Report--$1M
- Federal contractNASA · Igf::ot::igf The Increasing Frequency Of International Space Station (iss) Egress Operations Contaminates The Spacecraft Environment With Propel Ant Residues (such As Anhydrous Hydrazine) And Their Decomposition By-products, As Well As Coolants Such As Ammonia And Freon. NH3 And N2H4 Have A 24 Hour Spacecraft Maximum Allowable Concentration (smac) Of 7 Ppm And 0.3 Ppm, Respectively. Tda Research Inc. Is Developing A New Adsorbent That Can Remove These Contaminants To Sub Ppmv Concentrations With$750K
- Federal contractInterior · Igf::ot::igf Helmet-mounted Thermal Sensor For First Responder Burn-saver Device$998K
- Federal contractDefense · Igf::ot::igf FY13 SBIR Funds Topic: AF131-202$150K
- Federal contractDefense · Igf::ot::igf SBIR I Novel Trap For Ticks And Fleas Incorporating A CO2 Generator$150K
- Federal contractDefense · Igf::ot::igf SBIR Phase I U435CFM$100K
- Federal contractDefense · Igf::ot::igf Small Business Innovation Research (SBIR) Phase II On Osha Wastewater Treatment$750K
- Federal contractDefense · Igf::ot::igf Battery Management, Monitoring And Diagnostic Device For Navy Energy Storage Modules$801K
- Federal contractDefense · SSDX-12 Commerical Floor Cleaner$70K
- Federal contractDefense · Igf::ot::igf First Monthly Progress Report$765K
- Federal contractDefense · BASE$736K
- Federal contractDefense · SBIR Phase I Contract Award Topic N132-100$80K
- Federal contractDefense · Igf::ot::igf Advanced Sorbent Cartridge Incorporating Novel Sorbents Based On Metal-organic Framework (mof) Materials$2.5M
- Federal grantAgriculture · Ambient Temperature Oxidation Catalyst For Ethylene Control In Fresh Produce Containers$450K
- Federal grantAgriculture · A Regenerable Sorbent For Deep Desulfurization Of Alpha Pinene$100K
- Federal contractDefense · Small Business Innovative Research (SBIR) Phase II. Phase II Is Being Issued To Continue Research On Energetic Surface Modification Of Aluminum Nanoparticles.$988K
- Federal contractDefense · Igf::ot::igf SBIR Phase II Research&development, Coatings For Alkali Vapor Laser Cavity.$995K
- Federal contractDefense · STTR Phase I - A13A-019-0258$1.1M
- Federal contractNASA · Igf::ot::igf A Spacecraft Thermal Control System Must Keep The Vehicle, Avionics And Atmosphere (if Crewed) Within A Defined Temperature Range. Since Water Is Non-toxic And Good For Heat Transport, It Is Typically Used As The Coolant That Circulates Within The Crew Cabin Boundary. This Loop Then Interfaces With Another Low Freeze Point Fluid, Such As Ammonia, For Transport Of Heat To A Radiator Where The Temperatures Can Be Considerably Below The Freezing Point Of Water. The Volumetric Expansion$687K
- Federal grantAgriculture · A New Renewable Polymer From Bio Oil$100K
- Federal contractDefense · Igf::ot::igf Scientific Research Services$150K
- Federal contractNASA · Igf::ot::igf The Increasing Frequency Of International Space Station (iss) Egress Operations Results In Chemical Contamination Of The Spacecraft Environment. Among The Most Important Contaminants Are Propellant Residues (such As Hydrazine) And Their Decomposition By-products, As Well As Coolants Such As Ammonia And Freon. Ammonia Has A 24 Hour Spacecraft Maximum Allowable Concentration (smac) Of 7 Ppm (perry, 2010) And Hydrazine Has A 24 Hour Smac Of 0.3 Ppm (nasa/jsc 20584, March, 2001). These$125K
- Federal contractNASA · Igf::ot::igf Converting In-situ Resources Into Propellants, Energy Storage Reactants, Or Other Useful Products At The Site Of Exploration, Known As In-situ Resource Utilization (isru), Instead Of Transporting These Supplies From Earth Can Significantly Reduce The Cost And Risk Of Human Exploration While At The Same Time Enabling New Mission Concepts And Long Term Exploration Sustainability. NASA Needs Innovative Gasification Reactors To Convert Trash Into Useful Intermediate Products Such As Ca$125K
- Federal contractEnvironmental Prot · Igf::ot::igf Other Functions 2013 SBIR Phase I Tda Research, Inc.$80K
- Federal contractDefense · Darpa SBIR Phase I Entitled, "biodegradable, Biocompatible Conductor For Resorbable Medical Implants".$100K
- Federal contractHomeland Security · Igf::ot::igf$100K
- Federal contractDefense · SBIR Phase I - (H122-007-0183)$150K
- Federal contractDefense · Optically Covert Detection Of Trace Wmd Residues - SBIR Phase I$150K
- Federal contractNASA · Igf::ot::igf - Tda Research, Inc. Is Developing A Compact, Low Power, Next-generation Exercise Device (ngred) That Can Generate Any Force Between 5 And 600 Lbf. We Use A Closed Loop Control System And A Servo Motor To Smoothly And Accurately Simulate The Gravitational And Inertial Loads Of Lifting A Weight On Earth. However, Because The System Uses A Computer-controlled Motor, The Load Can Be Varied Independently During The Concentric And Eccentric Phase Of The Exercise. Thus, The System Can Eas$750K
- Federal contractDefense · SBIR Phase II, Topic #:OSD09-EP6$747K
- Federal contractDefense · Second Technical Progress Report$100K
- Federal contractDefense · Basictopic N093-208$591K
- Federal contractDefense · Relevant Environmental Aircraft Tasks$72K
- Federal contractDefense · Phase I SBIR Contract.$150K
- Federal contractDefense · Phase I SBIR For New Syntheses Of Chlorinated High Energy Density Explosives.$100K
- Federal contractDefense · Small Business Inovative Research Project - Topic A12-012 Entitled "energetic Surface Modification Of Aluminum Nanoparticles"$150K
- Federal contractDefense · Base Period$312K
- Federal contractEnvironmental Prot · SBIR Phase II- Tda Research, Inc$300K
- Federal grantAgriculture · Sustainable Green Diesel Production: Upgrading Biomass Waste Pyrolysis Oil$100K
- Federal grantAgriculture · Ambient Temperature Oxidation Catalyst For Ethylene Control In Fresh Produce Containers$100K
- Federal contractNASA · Sap Purchase Requisition: 4200430175 SBIR Phase III Simplified Non Commercial NNA12AB15P For "control Of Solid Waste Using Low Temperature Oxidation Support Requirements"$13K
- Federal contractDefense · Phase II SBIR To Tda Research, Inc. For SBIR Topic A10-136 For "energy-efficient Hybrid Water Purification System"$729K
- Federal contractDefense · Status Report$150K
- Federal contractNASA · A Spacecraft Thermal Control System Must Keep The Cabin (both Air And Its Structure If Manned) And Electronic Equipment Within A Narrow Temperature Range Even Though The Environment May Vary From Very Cold To Warmer Than Room Temperature. Since Water Is Safe To Use And An Excellent Coolant (other Than Its High Freeze Point And Volumetric Expansion During Freeze), A Water Coolant Loop Often Is Used To Transport Heat To Or From The Spacecraft Via Heat Exchangers To The Heat Sink Systems That Rejec$125K
- Federal contractNASA · Tda Research, Inc Proposes To Develop A Compact, Low Power, High Life-cycle Computer Controlled Programmable Force Generator (pfg) That Can Generate Any Force Between 0 And 700 Lbf During Any Phase Of The Exercise Motion. The Proposed Device Uses A Closed Loop Control System To Maintain The Predetermined Load Throughout The Range Of Motion By Controlling An Electric Motor. The Force Applied During The Eccentric Phase Is Independent Of The Force Applied During The Concentric Phase; The Force Appl$125K
- Federal contractNASA · Nanosatellites Are Receiving Increased Interest Since They Are Proving Reliable For Surveillance, Communication And Other Space Missions. Also, The Possibility Of Launching "constellations" Of Them Offers Unique Capabilities For Low-cost Experimentation, Sensing And Communications In Space. In Comparison To Larger Spacecraft, Their Development Time And Costs Have Reduced And Their Launch Costs Are Low. As A Result Several Agencies Have Recently Launched Nanosats To Test Their Ability To Perform $125K
- Federal contractDefense · Flat Uv-cured Powder Coating$750K
- Federal contractDefense · Ph I Research&development$150K
- Federal contractDefense · Energetic Nanoparticles For High Impulse Reduced Smoke Propellants$150K
- Federal contractDefense · Tda Research SBIR Phase I - High Strength Amorphous Metal Alloy For Penetrator Noses And Cases$150K
- Federal contractDefense · Phase I SBIR Titled "passivation Method For Aluminum Nanoparticles"$100K
- Federal contractDefense · Status Report$150K
- Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$750K
- Federal contractDefense · Phase II Extension Cpp$851K
- Federal contractNASA · A Practical CO2 Control System For Extravehicular Activity (eva) On Mars Have Not Yet Been Developed. Tda Research, Inc. Proposes To Develop A Durable, High-capacity, Continuously Regenerable Sorbent That Can Remove CO2 From The Breathing Loop. The Energy For Regeneration Is Provided By The Metabolic Load, And The Sorbent Can Be Regenerated At Or Above 6 Torr, Eliminating The Potential For Martian Atmosphere To Leak Into The Regeneration Bed And Into The Breathing Loop. In Phase I, We Demonstrat$599K
- Federal contractDefense · Technical Data - Develop And Demonstrate A Novel Power System That Will Be Utilized In An Air Launched Small Unmanned Aerial System (suas). The End Solution Should Not Only Extend The Duration Of The Suas, But Also Address The Growing Need For More Power By The Payload.$100K
- Federal contractEnvironmental Prot · SBIR Phase I Tda Research$80K
- Federal contractEnvironmental Prot · SBIR Phase I Tda, Research$80K
- Federal contractEnvironmental Prot · SBIR Phase I Tda, Research$80K
- Federal contractNASA · Immense Quantities Of Expensive Liquefied Helium Are Required At Stennis And Kennedy Space Centers For Pre-cooling Rocket Engine Propellant Systems Prior To Filling With Liquid Hydrogen, For Pressurizing Tanks And For Safely Purging Residual Hydrogen. Presently, The Helium Used In These Processes Is Discarded, Along With Substantial Quantities Of Hydrogen. Tda Research Proposes To Design And Build A Compact, Portable And Cost Effective Membrane System For Recovering, Purifying And Storing Both H$100K
- Federal contractNASA · The Outstanding Properties Of Silicon Carbide (sic) Include Excellent Specific Strength, Extreme Chemical Resistance, Tremendous Hardness, And Retention Of Its High Strength At Very High Temperatures. The Brittleness Typically Associated With A Ceramic Can Be Mitigated By Forming Composites With Either Carbon Or Sic Fibers. However, The Processes For Forming Sic Matrix Composites Limit The Size And Complexity Of The Resulting Shapes. It Is Therefore Necessary To Develop Techniques For Efficientl$100K
- Federal contractDefense · Phase I Small$120K
- Federal contractDefense · Darpa STTR Phase II$741K
- Federal contractDefense · Flat Uv-cured Powder Coatings$100K
- Federal contractNASA · NASA Is Developing A System To Filter Cabin Air, Concentrate A Stream Of Low Pressure High Purity Oxygen, Compress The Oxygen With An On Board Compressor, And Store The Oxygen In The External High Pressure Oxygen Storage Tanks Called Hpgts (high Pressure Gas Tanks). The Oxygen Purity Requirement For Use In The Emu (eva Mobility Unit, Commonly Known As The Space Suit ) Is Greater Than 99.5% Purity. The Delivery Rate Target Is 5 Lbs O2 Per Day. The Target Footprint For The Oxygen Separation System$62K
- Federal contractDefense · Research And Development SBIR Phase II Topic N091-035$953K
- Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$70K
- Federal grantAgriculture · Desulfurization Of Biogas Derived From Animal Manure$400K
- Federal contractNASA · SBIR Phase Iii-oxygen Separation Sorbent Feasibility Study NASA Is Developing A System To Filter Cabin Air, Concentrate A Stream Of Low Pressure High Purity Oxygen, Compress The Oxygen With An On Board Compressor, And Store The Oxygen In The External High Pressure Oxygen Storage Tanks. The Oxygen Purity Requirement For Use In The Emu(eva Mobility Unit, Commonly Known As The Space Suit ) Is Greater Than 99.5% Purity. The Delivery Rate Target Is 5 Lbs O2 Per Day. The Separation System Will Operate$80K
- Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$70K
- Federal grantAgriculture · Low-cost Removal Of Dissolved Solids And Fermentation Inhibitors For Cellulosic Ethanol$90K
- Federal contractDefense · Mesoporous Sorbents$728K
- Federal contractDefense · Army SBIR Phase 1$70K
- Federal contractDefense · R&d SBIR Topic N101-028$80K
- Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$100K
- Federal contractEnvironmental Prot · SBIR Phase II$225K
- Federal contractDefense · First Status Report$100K
- Federal contractDefense · Phase I$100K
- Federal contractDefense · First Status Report$70K
- Federal contractDefense · SBIR Phi/tda Research$70K
- Federal contractDefense · Base Period - Demonstration And Enhancement Of The Electrochemical Decontamination$418K
- Federal contractDefense · SBIR Phase 1 - A093-158-1161$835K
- Federal contractDefense · Scientific Research Services$681K
- Federal contractEnvironmental Prot · SBIR Phase I$70K
- Federal contractDefense · 6MO SBIR Phase 1, Topic #OSD09-EP6$100K
- Federal contractNASA · CO2 Control For During Extravehicular Activity (eva) On Mars Is Challenging. Lithium Hydroxide (lioh) Canisters Have Impractical Logistics Penalties, And Regenerable Metal Oxide Canisters Weigh Too Much. Cycling Bed Systems And Permeable Membranes That Are Regenerable In Space Vacuum Cannot Vent On Mars Due To The High Partial Pressure Of CO2 In The Atmosphere. Although Sweep Gas Regeneration Is Under Investigation, The Feasibility, Logistics Penalties, And Failure Modes Associated With This Tec$100K
- Federal contractNASA · The Kennedy Space Center Maintains Approximately $2 Billion Worth Of Ground Support Facilities To Support Its Launch Vehicle Program. Maintenance Of The Ground Facilities Is A Difficult And Ongoing Task Since The Kennedy Space Center (ksc) Is Located In One Of The Most Aggressive Corrosion Environments In The U.S. The Effects Of The Corrosive Environment At The Ksc Are Compounded By The Exhaust Of The Space Shuttle's Solid Rocket Boosters Which Produce An Estimated 17 Tons Of Hydrochloric Acid W$600K
- Federal contractDefense · (sttr-phase II) Novel Propellants For Variable Thrust/isp Colloid Thrusters$500K
- Federal contractNASA · Both Manned And Unmanned Off-earth Missions Of The Future Will Require Very Lightweight, Inexpensive, High Efficiency, Flexible And Single-use Photovoltaic (pv) Arrays To Generate Electric Power. Current Pv Technology Horizons Do Not Meet The Requirements For Expanded Mission Capability. Although Inorganic Pvs Hold The Record For Solar Power Conversion Efficiency, They Are Inflexible, Heavy, And Expensive To Produce. There Is Increasing Interest In A New Type Of Pv Technology That Is Based On Or$600K
- Federal contractDefense · Scientific Research Services$750K
- Federal contractDefense · Scientific Research Services$750K
- Federal contractDefense · Scientific Research Services$730K
- Federal contractDefense · Scientific Research Services$50K
- Federal contractDefense · Technical Data$100K
- Federal contractDefense · First Status Report$100K
- Federal contractDefense · STTR (phase I) - Novel Propellants For Variable Thrust/lsp Colloid Thrusters$100K
- Federal grantAgriculture · Desulfurization Of Biogas Derived From Animal Manure$80K
- Federal contractDefense · SBIR Topic N091-035$150K
- Federal contractEnvironmental Prot · SBIR Phase II$225K
- Federal contractDefense · First Status Report$70K
- Federal contractEnvironmental Prot · SBIR Phase I$70K
- Federal contractNASA · An On-board Oxygen Concentrator Is Required During Long Duration Manned Space Missions To Supply Medical Oxygen. Commercial Medical Oxygen Generators Are Pressure Swing Adsorption (psa) Based Systems That Use Nitrogen Selective Zeolites And Are Mostly Large, Massive, And Power Intensive. Tda Research, Inc. (tda) Proposes To Develop A Small, Lightweight, Portable Oxygen Generator That Uses A High Capacity, Long Life, Regenerable Oxygen Absorbent To Produce Concentrated Medical Oxygen From Ambient$100K
- Federal contractNASA · As The Length Of Manned Space Missions Increase, Requirements To Sustain Those Missions Increase Proportionately. Daily Food Supplies Require Food Packaged And Sent From Earth, Preparation Mechanisms And Waste Treatment. The Window For Food Preservation Could Be 3-5 Years. This Will Require Food Packaging That Provides Excellent Barriers To Water Vapor And Oxygen, Is Durable At The Processing Conditions (retort Sterilizing, Microwave Processing), And Has Low Mass. Storage And Disposal Of Used Fo$100K
- Federal contractNASA · High Capacity Anodes For Advanced Lithium Ion Batteries Lithium-ion Batteries Are Slowly Being Introduced Into Satellite Power Systems, But Their Life Still Presents Concerns For Longer Duration Missions. Future NASA Goals For Retuning To The Moon And The Manned Exploration Of Mars Will Demand Increased Specific Energy And Life From Batteries. The Properties Of The Graphite Anode, And In Particular The 'solid Electrolyte Interface' (sei) Layer, Are Key Focus Areas For Advancement. Improving The$100K
- Federal contractNASA · Low Toxicity Corrosion Inhibitors For Smart Coatings The Kennedy Space Center (ksc) Is Located Near One Of The Most Corrosive Natural Environments In The World. Corrosion Of Ksc Ground Assets Is Exacerbated By The Highly Acidic Exhaust Of The Shuttle Solid Rocket Boosters (srbs). During Launch Approximately 17 Tons Of Hydrochloric Acid Are Generated From The Srb Exhausts. Thus While The Launches Are Infrequent, They Produce A Highly Acidic Environment On Coated Structures Leading To Excessive C$100K
- Federal contractDefense · Scientific Research Services$70K
- Federal contractDefense · Oxidative Desulfurization System$120K
- Federal contractDefense · SBIR$750K
- Federal grantAgriculture · Low-cost Conversion Of High Free Fatty Acid Oils And Fats Into Methyl Esters (biodiesel)$350K
- Federal contractDefense · Scientific Research Services$718K
- Federal contractDefense · N08-098 High-capacity Primary Battery For Extreme Environments$70K
- Federal contractDefense · Scientific Research Services$100K
- Federal contractDefense · Scientific Research Services$100K
- Federal contractDefense · SBIR OSD05-MT6, Phase II$725K
- Federal contractDefense · Effective Catalytic Self-deconaminating$572K
- Federal contractDefense · SBIR II$1.1M
- Federal contractDefense · SBIR I - OSD08-EP3 - Foil Bearing Supported Centrifugal$100K
- Federal contractDefense · Scientific Research Services$560K
- Federal contractDefense · Rapid Cure, Environmentally Acceptable Liquid Shim$742K
- Federal contractDefense · Basic Contract$780K
- Federal contractDefense · Progress Report$70K
- Federal contractEnvironmental Prot · Small Business Innovation Research - Phase I$70K
- Federal contractDefense · Contract Summary Report.$100K
- Federal contractNASA · Flexible, Lightweight, Low-cost Organic Photovoltaics With Improved Efficiency$100K
- Federal contractNASA · Post Flight Catalyst Testing. I Recommend That NASA, George C. Marshall Space Flight Center Negotiate With Tda Research Only For The Procurement Of Post-flight Tccs Catalyst Evaluation Services. The Total Estimated Cost Of This Effort Is $43,498 And The Estimated Period Of Performance Or Lead-time For Completion Is Twelve To Fourteen Weeks From Date Of Receipt Of Catalyst Samples. This Recommendation Is Made Pursuant To Far 13.106, For The Acquisition Of Supplies Or Services Determined To Be Rea$41K
- Federal contractDefense · Phase I Sibr For A Novel Syngas Purification System To Support Mobile Synthetic Fuel Plants.$100K
- Federal contractNASA · Carbon Monoxide Removal Material$25K
- Federal contractDefense · Rad 1 /wrair SBIR Phase 1 A072-152-1770$834K
- Federal contractDefense · CO2 Sorbent$19K
- Federal contractDefense · STTR Phase 2 ($550K To $750K) Inc Funding/no Opt Cpff$750K
- Federal contractDefense · R&D$35K
- Federal contractEnvironmental Prot · Small Business Innovation Research - Phase II$225K
- Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences$152K
- Federal contractDefense · Base Year$200K
- Federal contractDefense · SBIR II$750K
- Federal contractDefense · Catalytic Nitration Of Toleune-a$120K
- Federal contractDefense · Scientific Research Services$750K
- Federal contractDefense · 200612!009180!5700!FA8650!DET 1 Afrl/pk !FA865006C2673 !a!n! !y! ! !20060905!20081215!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000250000!N!N!000000750000!AC11!RDTE/AIRCRAFT-BASIC Research !A1B!AIRCRAFT Engines And Spares !000 !not Discernable !541710!E! !3! ! ! ! ! !999$1.3M
- Federal contractDefense · 200612!601305!2100!W911QY!USA Materiel Command ACQUISITION!W911QY06C0097 !a!n! !n! ! !20060830!20081231!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000358595!N!N!000000724342!AD31!RDTE/SUBSISTENCE-BASIC Research !C9E!ALL Other Supplies And Equipment !000 !not Discernable !541710!E! !3! ! ! ! ! !999$724K
- Federal contractDefense · 200609!005991!5700!FA8650!DET 1 Afrl/pk !FA865006C5012 !a!n! !y! ! !20060612!20081015!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000750000!N!N!000000750000!AC16!RDTE/AIRCRAFT-MANAGEMENT Support !A1A!AIRFRAMES And Spares !000 !not Discernable !541710!E! !3! ! ! ! ! !999$750K
- Federal contractEnvironmental Prot · Small Business Innovation Research -phase II$225K
- Federal contractDefense · 200607!600404!2100!W911NF!USA Materiel Command ACQUISITION!W911NF06C0048 !a!n! !n! ! !20060425!20070425!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000304666!N!N!000000304666!AZ11!RDTE/OTHER Research & Development-basic Research !S1 !services !000 !not Discernable !541710!E! !3! ! ! ! ! !999$750K
- Federal contractDefense · 200607!600405!2100!W911NF!USA Materiel Command ACQUISITION!W911NF06C0049 !a!n! !n! ! !20060425!20070425!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000307657!N!N!000000307657!AZ11!RDTE/OTHER Research & Development-basic Research !S1 !services !000 !not Discernable !541710!E! !3! ! ! ! ! !999$750K
- Federal contractDefense · 200604!600303!2100!W911QY!USA Materiel Command ACQUISITION!W911QY06C0028 !a!n! !n! ! !20060127!20061130!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000070234!N!N!000000120234!AD31!RDTE/SUBSISTENCE-BASIC Research !C9E!ALL Other Supplies And Equipment !000 !* !541710!E! !3! ! ! ! ! !999$120K
- Federal contractDefense · 200604!002745!2100!W56HZV!TACOM - Warren !W56HZV05C0634 !a!n! !y! ! !20060125!20080130!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000385739!N!N!000000000000!AD21!RDTE/SERVICES-BASIC Research !S1 !services !000 !not Discernable !541710!E! !3! ! ! ! ! !999$730K
- Federal contractNASA · SBIR 2004 Phase II Research Project Entitled: "control Of Solid Waste Using Low Temperature Oxidation"$600K
- Federal contractNASA · SBIR II: Research Project "an Advanced Rapid Cycling CO2 And H2O System For Portable Life Support Systems"$600K
- Federal contractDefense$448K
- Federal contractDefense · 200510!348712!1700!N68335!NAVAL Air Engineering Station !N6833505C0300 !a!n! !y! ! !20050725!20070725!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000300000!N!N!000000747910!AC62!RDTE/ELECTRONICS & Communication Eq-applied Resea !A7 !electronics And Communication Equip !000 !* !541710!E! !3! ! ! ! ! !202$748K
- Federal contractDefense · 200503!001059!2100!W31P4Q!USA Aviation And Missile COMMAND!W31P4Q05CR137 !a!n! !n! ! !20041222!20070115!181947730!181947730!181947730!N!TDA Research, Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000295374!N!N!000000000000!AD92!RDTE/OTHER Defense-applied Research !A2 !missile And Space Systems !000 !* !541710!E! !3! ! ! ! ! !202$745K
- Federal contractDefense$749K
- Federal contractDefense · 200411!000269!5700!GR15 !afrl/mnk !FA865104C0393 !a!n! !y! ! !20040819!20060818!181947730!181947730!181947730!N!TDA Research Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000375000!N!N!000000750000!AC56!RDTE/WEAPONS-MANAGEMENT Support !A5 !weapons !000 !* !541710!E! !3! ! ! ! ! !999$737K
- Federal contractDefense$812K
- Federal contractDefense · 200208!002683!1700!A8050 !naval Air Warfare Center, AIRCRA!N6833502C0024 !a!n! !n! !20020528!20040527!181947730!181947730!181947730!N!TDA Research Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000375000!N!N!000000000000!AC62!RDTE/ELECTRONICS & Communication Eq-applied Resea !A1A!AIRFRAMES And Spares !2000!NOT Discernable Or Classified !541710!E! !3! ! ! ! ! !99990909!B$739K
- Federal contractDefense · 200209!002235!2100!AH01 !usa Aviation And Missile COMMAND!DAAH0102CR184 !a!n! !n! !20020523!20050830!181947730!181947730!181947730!N!TDA Research Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000352634!N!N!000000000000!AD92!RDTE/OTHER Defense-applied Research !A2 !missile And Space Systems !1000!NOT Discernable Or Classified !541710!E! !3! ! ! ! ! !99990909!B$743K
- Federal contractDefense · 200111!002556!2100!AH01 !usa Aviation And Missile COMMAND!DAAH0101CR189 !a!n!*!n! !20010717!20031015!181947730!181947730!181947730!N!TDA Research Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !+000000367168!N!N!000000000000!AD92!RDTE/OTHER Defense-applied Research !A2 !missile And Space Systems !1000!NOT Discernable Or Classified !541710!*!*!3! ! ! !*!*!*!b!*!*!n!$750K
- Federal contractDefense · 200007!2100!001547!AH01 !usa Aviation And Missile COMMAND!DAAH0100CR103 !a!*!* !20000420!20020722!181947730!181947730!181947730!N!0BHX7!TDA Research Inc !12345 W 52ND Ave !wheat Ridge !CO!80033!84440!059!08!WHEAT Ridge !jefferson !colorado !0001!+000000399434!N!N!000000000000!AD92!RDTE/OTHER Defense-applied Research !S1 !services !1AIC!APACHE (AH-64) Adv Attack !3721!3!*!*!*!B!N!Z!A !n!u!$750K
- Federal contractNASA$316K
Federal awards are summed by year (577 awards); hover a bar for the split. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.
12 records have no date or no amount, so they aren’t placed on the timeline.
Standing among 11 peers
Line = medianMaterials · Software
- Federal grants#1 · top 9%
- Granted patents#1 · top 9%
Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.
Founders and team
No founders are linked to this company yet.
Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.
Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026
Claim this profile to add your teamWhat it has protected
USPTO · 22 granted of 40- New patentElectromagnetic Inductive Coupling Analysis (EMICA) for on-board or in-lab detection of defects in thick or thin carbon fiber laminatesUSPTOUS 12,748,074
- PendingCatalyst-Sorbent Hybrid Process for Organic Sulfur RemovalUSPTOApplication 19550073
- GrantedPortable Dialysate GeneratorUSPTOUS 12,691,207
Show all 40 patent records
- Electromagnetic Inductive Coupling Analysis (EMICA) for on-board or in-lab detection of defects in thick or thin carbon fiber laminatesSep 29, 2026 · US 12,748,074Granted
- Catalyst-Sorbent Hybrid Process for Organic Sulfur RemovalAug 27, 2026 · Application 19550073Pending
- Portable Dialysate GeneratorJul 28, 2026 · US 12,691,207Granted
- Infrasound Sensors for Large ArraysJul 16, 2026 · Application 19036955Pending
- Mesoporous Carbon Sorbents And Related MethodsJun 9, 2026 · US 12,649,144Granted
- Carbon-carbon Composite Sorbent Formulations For Carbon Dioxide Adsorption, And Related MethodsMay 26, 2026 · US 12,636,632Granted
- Undercoat Corrosion Monitoring Raman SensorMar 24, 2026 · US 12,584,860Granted
- Surface Modified Support for Metal Adsorption and Methods of Using ThereofFeb 12, 2026 · Application 18679181Pending
- Two Parameter Control for RF Warming of Cryopreserved Tissue SamplesJan 22, 2026 · Application 19277091Pending
- Oxygen Concentrator Sorbent Bed Equalization and Feed Manifolds and Method of Using the SameJan 22, 2026 · Application 18779860Pending
- Sorbents for Nutrient Removal from WaterDec 18, 2025 · Application 19238018Pending
- Carbon Sorbent Formulations For Carbon Dioxide Adsorption, And Related MethodsNov 20, 2025 · Application 18666511Pending
- Carbon Sorbent Formulations For Carbon Dioxide Adsorption, And Related MethodsNov 20, 2025 · Application 18666544Pending
- Method of Cellulose Particles and Fibrils Compatibilization and Use Thereof as Reinforcements for Plastic CompositesOct 30, 2025 · Application 18650438Pending
- Portable Dialysate GeneratorOct 30, 2025 · Application 18649373Pending
- Carbon Sorbent Formulations For Carbon Dioxide Adsorption, And Related MethodsOct 14, 2025 · US 12,440,822Granted
- High Density Lithium-Sulfur BatteriesSep 11, 2025 · Application 19076875Pending
- Non-Destructive Evaluation of Lithium-Ion BatteriesApr 15, 2025 · US 12,276,703Granted
- Gas Temperature Sensor With Thermally Luminescent CompoundsMar 4, 2025 · US 12,241,795Granted
- Composite Helmet Liner to Mitigate Blast Shockwave Energy and Reduce Traumatic Brain InjuriesFeb 20, 2025 · Application 18805467Pending
- Materials And Methods For Decontaminating Animal IntegumentFeb 11, 2025 · US 12,220,497Granted
- Simulated Moving Bed System For CO2 Separation, And Method Of SameOct 22, 2024 · US 12,121,846Granted
- Conductive Matrix And Sulfur CompositeOct 22, 2024 · US 12,122,674Granted
- Photodynamic Method Of Inhibiting Growth Of A Microbial Plant PathogenOct 8, 2024 · US 12,108,756Granted
- Electromagnetic Inductive Coupling Analysis (EMICA) for on-board or in-lab detection of defects in thick or thin carbon fiber laminatesSep 19, 2024 · Application 18222249Pending
- Rechargeable Silicon-carbon Anode Lithium Batteries With An Improved Low Temperature Discharge CapacitySep 19, 2024 · Application 18649070Pending
- Cooling Shirt for Workers in Hot EnvironmentsJul 18, 2024 · Application 18413629Pending
- Rechargeable Batteries With Improved Low Temperature PerformanceJul 18, 2024 · Application 18531673Pending
- High Performance CO2/H2O Displacement Desorption Sorbents And Methods Of Making SameJul 9, 2024 · US 12,030,032Granted
- Hydrothermal Production of Lithium Iron Phosphate and Lithium Manganese Iron Phosphate in a Continuous ProcessJul 4, 2024 · Application 18424337Pending
- Hydrolysis-tolerant Crosslinked Polymers From Reverse-acrylate Multifunctional MonomersFeb 13, 2024 · US 11,897,983Granted
- Method For Cleaning Firearm SuppressorsFeb 6, 2024 · US 11,890,653Granted
- Compositions For Carbon Dioxide Separation Using Steam Regeneration, And Method For Preparing SameDec 26, 2023 · US 11,850,569Granted
- Air Separation Sorbent And Vacuum Assisted Pressure Swing Adsorption Process Using The SameOct 17, 2023 · US 11,786,859Granted
- Hydrophobic Sorbents For CO2/H2O Displacement Desorption ApplicationsAug 23, 2022 · US 11,420,182Granted
- Mixed Metal Sorbents For CO2/H2O Displacement DesorptionDec 14, 2021 · US 11,198,109Granted
- Diene Gemini Polymerizable Surfactants With Mixed Cis And Trans Isomers That Form Bicontinuous Cubic PhasesSep 30, 2021 · Application 17259467Pending
- Composition And Method For Decontaminating Opioids On SurfacesAug 17, 2021 · US 11,090,520Granted
- Carbon Sorbent For Removal Of Metal Catalysts From PharmaceuticalsAug 3, 2021 · US 11,077,421Granted
- Rapid Fill Compressed Gas Storage TankAug 3, 2021 · US 11,079,068Granted
Related companies, and why
- Applied Systems Engineering IncorporatedShares a founder: William Smith
- ATTOLLO ENGINEERING, LLCShares a founder: William Smith
- BHAWIN LLCShares a founder: William Smith
- BLACK CAPE, INC.Shares a founder: William Smith
- AZIMUTH CORPORATIONSimilar federal contract value in Materials · $209M in contracts
- MAINSTREAM ENGINEERING CORPSimilar federal contract value in Materials · $144M in contracts
Regulatory activity · Materials
- Eliminating Regulations Establishing Fellowships in Laboratory Standardization and Testing for Foreign CitizensNational Institute of Standards and Technology
- Eliminating Obsolete Marking Requirements for Toy, Look-Alike, and Imitation FirearmsNational Institute of Standards and Technology
- Eliminating Obsolete Regulations Related to the Advanced Technology Program and the Technology Innovation ProgramNational Institute of Standards and Technology
Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.
Sources
Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.
How to read this page
Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.
Data freshness
SEC Form D filings through . SBIR and STTR awards through .