PECOS WIND POWER INC

Somerville, MA · Founded 2017 · Energy · Defunct

Wind turbines for distributed renewable electricity generation

Claim this profile

Follows are private to you and power your alerts

Updated · pecoswindpower.com

Sector
Energy
Headquarters
Somerville, MA
Founded
2017
Latest Form D
$457K, Nov 2024
Total capital
$5.4M
Federal grants
$4.6M
6 awards · 2019–2022
Rank in peer group#15 of 39
Private capital raised
$782K
2 Form D · last Nov 2024
23 months since last filing
Federal contracts
None on recordNo federal contract awards found.
Granted patents
3
first 2020
Rank in peer group#10 of 39

Capital timeline

201920202021202220232024FEDERAL ↑EQUITY ↓Cumulative $5.4M$50K$100K$199K$650K$1.1M$2.5M1st Form D$325K2nd Form D$457K
201920202021202220232024FEDERAL ↑EQUITY ↓Cumulative $5.4M$199K$650K$1.1M$2.5M1st Form D$325K2nd Form D$457K

Latest events

  • Private capital raisedForm D · SEC · 2nd filing$457K
  • Private capital raisedForm D · SEC · 1st filing$325K
  • Federal grantDefense · Phase II · Streamlined microgrid solution that integrates wind, solar, and existing diesel generators for DoD energy independence$2.5M
  • Federal grantEnergy · Phase II · TiltUp Tower and Installation System to Reduce the Cost of Distributed Wind Turbines$1.1M
  • Federal grantAgriculture · The Goal Of Pecos Wind POWER'S Usda SBIR Project Is To Demonstrate That Increasing Capacity Factor Of Small-scale Distributed Wind Turbines Is A Technically And Economically Feasible Solution To Providing Lower Cost Electricity To Rural Areas Nationwide. The Concept Will Be Demonstrated Through Research And Development (r&d) Of A High-capacity Factor Drivetrain For Pecos Wind POWER'S 85KW Distributed Wind Turbine, The PW85. It Will Enable The PW85 To Utilize The NATION'S Untapped$650K
  • Federal grantEnergy · Phase I · Tilt-Up Tower and Installation System to Reduce the Cost of Distributed Wind Turbines$199K
  • Federal grantAgriculture · Drivetrain For High Capacity Factor Distributed Wind Turbine$100K
Show 1 earlier federal award
  • Federal grantDefense · Phase I · Distributed Wind Turbine for Energy Resiliency and Security$50K

Node area is scaled to amount. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Federal first

40months

from PECOS WIND POWER INC’s first federal award to its first private round.

First federal award · Aug 2019
Defense · $50K
First Form D · Dec 2022
$325K · 1st Form D
Awards before first raise
6 awards

An association in public records, not a cause or a prediction.

Standing among 39 peers

Line = median

Energy · Device

  • Federal grants#15 · top 38%
  • Granted patents#10 · top 26%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

Researcher links verified by same-company patents and grants
  • JOSHUA GROLEAUResearcherExecutive OfficerLinked by 3 patents · $3.9M in grants as PI
  • CAMERON REAGORDirectorNamed in SEC Form D filings
  • JAMES FORTEDirectorNamed in SEC Form D filings

What it has protected

USPTO · 3 granted of 3

Regulatory activity · Energy

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .