PARAGON SPACE DEVELOPMENT CORPORATION

Tucson, AZ · Aerospace · Private

Advanced spacesuits and crew clothing textiles with bio-inspired materials for lunar and space environments

Claim this profile

Follows are private to you and power your alerts

Updated · paragonsdc.com

Sector
Aerospace
Headquarters
Tucson, AZ
Total capital
$66.8M
Federal grants
$12.9M
24 awards · 2016–2026
Rank in peer group#11 of 61
Private capital raised
None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
Federal contracts
$54M
109 awards · NASA, Defense
Rank in Aerospace#71 of 1335
Granted patents
16
24 pending · first 2016
Rank in peer group#5 of 61

Capital timeline

200620102014201820222026FEDERAL ↑EQUITY ↓Cumulative $66.8M2006: $645K across 1 contract2007: $599K across 1 contract2008: $800K across 3 contracts2009: $1.3M across 3 contracts2010: $382K across 4 contracts2011: $2.9M across 7 contracts2012: $749K across 1 contract2013: $998K across 8 contracts2014: $3.4M across 8 contracts$3.4M2015: $841K across 6 contracts2016: $870K across 2 grants · $15.6M across 6 contracts$16.4M2017: $1M across 3 grants · $1.1M across 3 contracts2018: $274K across 2 grants · $325K across 3 contracts2019: $1.6M across 2 grants · $4.3M across 7 contracts$5.9M2020: $750K across 1 grant · $4.8M across 8 contracts$5.6M2021: $1.7M across 3 grants · $1.2M across 8 contracts2022: $156K across 1 grant · $1.9M across 7 contracts2023: $2.9M across 8 contracts2024: $3.6M across 4 grants · $4.1M across 6 contracts$7.7M2025: $1.4M across 4 grants · $4.8M across 9 contracts$6.3M2026: $1.5M across 2 grants · $262K across 2 contracts
200620102014201820222026FEDERAL ↑EQUITY ↓Cumulative $66.8M2006: $645K across 1 contract2007: $599K across 1 contract2008: $800K across 3 contracts2009: $1.3M across 3 contracts2010: $382K across 4 contracts2011: $2.9M across 7 contracts2012: $749K across 1 contract2013: $998K across 8 contracts2014: $3.4M across 8 contracts2015: $841K across 6 contracts2016: $870K across 2 grants · $15.6M across 6 contracts$16.4M2017: $1M across 3 grants · $1.1M across 3 contracts2018: $274K across 2 grants · $325K across 3 contracts2019: $1.6M across 2 grants · $4.3M across 7 contracts$5.9M2020: $750K across 1 grant · $4.8M across 8 contracts2021: $1.7M across 3 grants · $1.2M across 8 contracts2022: $156K across 1 grant · $1.9M across 7 contracts2023: $2.9M across 8 contracts2024: $3.6M across 4 grants · $4.1M across 6 contracts$7.7M2025: $1.4M across 4 grants · $4.8M across 9 contracts$6.3M2026: $1.5M across 2 grants · $262K across 2 contracts

Latest events

  • Federal grantNASA · Phase I · SBIR Phase I Spacecraft Water Advanced Membrane Pervaporation Exchanger$225K
  • Federal grantNASA · Phase II · SBIR Phase II Multistage Umbilical Disconnect (mud) System$1.3M
  • Federal contractNASA · Development Of The Xemu Lcvg Thermal Control Loop$105K
  • Federal contractNASA · The Purpose Of This Task Order Is To Order Clin 0001 And 0002 Services And Supplies For Fiscal Year (fy) 26. See Parent Contract In Block 2 For Schedule And Description Of Services And Supplies.$157K
  • Federal contractNASA · Authorize And Fund Clins 0001 & 0002 For Fiscal Year (fy) 2026.$201K
  • Federal contractNASA · STTR Phase I - Deep-space Anomaly Solution For Habitat Assistance And Resolution Aid (dashara)$149K
  • Federal contractNASA · Phase I SBIR - Multistage Umbilical Disconnect (mud) System$150K
Show 126 earlier federal awards
  • Federal grantNASA · Phase I · STTR Phase I - Deep-space Anomaly Solution For Habitat Assistance And Resolution Aid (dashara)$149K
  • Federal grantNASA · Phase I · Phase I SBIR - Multistage Umbilical Disconnect (mud) System$150K
  • Federal grantDefense · Phase II · Research And Development$979K
  • Federal contractDefense · Research And Development$979K
  • Federal contractNASA · The Build, Test, And Delivery Of 60 Bpa Bladders.$1.8M
  • Federal grantDefense · Phase I · Research And Development$140K
  • Federal contractDefense · Research And Development$140K
  • Federal contractNASA · The Purpose Of This Task Order (to) Is To Update The Existing Bpa Detrusor Design And Deliver The Updated Detrusor Hardware To NASA That Will Replace The Existing Bpa Detrusor Aboard The International Space Station (iss).$1.1M
  • Federal contractNASA · Maintain Nominal Bpa Operations Through December 2030 Aboard The International Space Station (iss).$86K
  • Federal contractNASA · Bpa Bladder Purchase And Delivery$200K
  • Federal contractNASA · Sustaining Services For The Brine Processor Assembly (bpa) On Iss (clin 0001 & 0002) For Calendar Year (cy) 2024$367K
  • Federal contractDefense · Phase II Award$1.7M
  • Federal grantDefense · Phase II · Phase II Award$1.7M
  • Federal contractDefense · Kick-off Briefing Materials & Fwa Cert.$240K
  • Federal grantDefense · Phase I · Kick-off Briefing Materials & Fwa Cert.$240K
  • Federal contractNASA · Exploration Extra-vehicular Mobility Unit Xemu Training Softgoods Liquid Cooling And Ventilation Garment Lvcg Waist And Hut Vent Ducts The Crew And Thermal Systems Division$86K
  • Federal grantNASA · Phase II · FY24 SBIR Phase II - Softgoods Webbing Integrated Strain Sensor For Inflatable$850K
  • Federal contractNASA · FY24 SBIR Phase II - Softgoods Webbing Integrated Strain Sensor For Inflatable$850K
  • Federal grantNASA · Phase II · STTR Phase II - Spacesuit Cover Against The Abrasive Lunar Environment (scale) & Exploration Textile For High Oxygen Environments$850K
  • Federal contractNASA · STTR Phase II - Spacesuit Cover Against The Abrasive Lunar Environment (scale) & Exploration Textile For High Oxygen Environments$850K
  • Federal contractNASA · Paragon Shall Review And Approve A Cmc/jcct Provided Launch Configuration Design Of The Bpa Detrusor (505600150,$120K
  • Federal contractNASA · Sustaining Services For The Brine Processor Assembly (bpa) On Iss$289K
  • Federal contractNASA · Softgoods Manufacturing Services$158K
  • Federal contractNASA · Complete Data Integration Testing Of The 2 New Sensors That Will Be Added At The Iss Bpa Exhaust Outlet On Iss (humidity And Air Flow).$9K
  • Federal contractNASA · Build, Test, And Delivery Of Brine Processor Assemblies (bpa) BLADDERS.857124-221$994K
  • Federal contractNASA · FY23 SBIR Phase I - Softgoods Webbing Integrated Strain Sensor For Inflatable$150K
  • Federal contractDefense · Phase I Award$249K
  • Federal contractNASA · Sustaining Services For The Brine Processor Assembly (bpa) On The International Space Station (iss)$966K
  • Federal contractNASA · Standard Operations Support Services For FY2023$193K
  • Federal contractNASA · Baseline Contract Support And Spares Consumables Planning For FY2023$84K
  • Federal contractNASA · EO14042 SBIR Phase I Non-water Lunar Ice Mining$156K
  • Federal contractNASA · EO14042 FY22 SBIR Phase I CO2/H2O Sorbent Development For The Xemu$156K
  • Federal contractNASA · EO14042 FY22 SBIR Phase I Exploration Labyrinth Dust Seals (xlids)$156K
  • Federal grantNASA · Phase I · Spacesuit Cover against the Abrasive Lunar Environment (SCALE) & eXploration Textile for high Oxygen eNvironments (xTON)$156K
  • Federal contractDefense · SBIR Phase I Topic A214-012-0941$260K
  • Federal contractNASA · Task Order 2 For 28 Additional Brine Processor Assembly (bpa) Bladders$884K
  • Federal contractNASA · Task Order 3 For CLIN0001 Baseline Contract Support, Spares, And Consumables Planning$206K
  • Federal contractNASA · Task Order 4 For CLIN0002 Standard Operations Support For Fy 22$108K
  • Federal contractNASA · To 6 - Training Shoulder Softgoods$58K
  • Federal grantNASA · Phase II · ISRU Collector of Ice in a Cold Lunar Environment (ICICLE)$759K
  • Federal grantNASA · Phase II · Mechanical-compression Aerobot for extended Range Venus ExpLoration (MARVEL)$760K
  • Federal contractNASA · Xemu Prototype Headset$124K
  • Federal contractNASA · Final Frontier Design (ffd) For The Development Of The Vent Tree System$208K
  • Federal contractNASA · To 6 - Training Softgoods$175K
  • Federal grantNASA · Phase I · Modal Optimized Vibration dust Eliminator (MOVE)$131K
  • Federal contractNASA · Xemu Softgoods Manufacturing Services$107K
  • Federal contractNASA · Sustaining Services For The Brine Processor Assembly (bpa) On Iss$239K
  • Federal contractNASA · Xemu Softgoods Manufacturing Services$134K
  • Federal contractNASA · Variable Altitude Venus Platform$124K
  • Federal contractNASA · Isru Collector Of Ice In A Cold Lunar Environment (icicle)$125K
  • Federal contractNASA · Separation Technology Of On-orbit Liquid And Excrement (stoole)$747K
  • Federal grantNASA · Phase II · Ellipsoidal Propellant Tank (EPT)$750K
  • Federal contractNASA · Xemu Softgoods Manufacturing Services$277K
  • Federal contractNASA · Xemu Softgoods Manufacturing Services$316K
  • Federal contractNASA · Xemu Boots Prototype Development$1.6M
  • Federal contractNASA · The Paragon/boeing/texas A&m Team Will Develop An Integrated, Fully Passive, Thermal Control System (tcs) That Will Be Capable Of Maintaining Supported Vehicle Or Habitat Tcs Temperatures Consistent.$1.5M
  • Federal contractDefense · SBIR Phase I$145K
  • Federal grantNASA · Phase I · Separation Technology of On-Orbit Liquid and Excrement (STOOLE)$125K
  • Federal contractNASA · Surface Space Suit Boot$125K
  • Federal contractNASA · Ellipsoidal Propellant Tank (ept)$125K
  • Federal contractNASA · Smart Passively Articulating High-turndown Radiator (spahr)$125K
  • Federal contractNASA · The Paragon Condensate Separator For Microgravity Conditions (cosmic) Is A Full Flow Device That Separates Liquid Condensate From Air Using An Inertial Process With Low Power Draw, Negligible Pressure Drop, And Efficient Condensate Collection. Cosmic, And Associated Systems In Development By Paragon, Form A Drop-in Solution To Replace The Iss Common Cabin Air Assembly (ccaa) Compact Heat Exchanger Slurper And Water Separator. On Iss, The Slurper Bar Suffers Continued Siloxane Chemical Degradatio$750K
  • Federal contractNASA · Cryogenic Encapsulating Launch Shroud And Insulated Upper Stage (celsius) To Enable Efficient And Safe Transportation Into And Through Space$1.5M
  • Federal contractNASA · Igf:ot:igf Isru-derived Water Purification And Hydrogen Oxygen Production (ihop) Component Development$1.5M
  • Federal grantDefense · Phase II · Energy Storage Enclosure Technologies for High Density Devices$1.5M
  • Federal grantDefense · Phase I · Reheating Air Inside Diving Equipment and Regulators (RAIDER)$150K
  • Federal grantNASA · Phase I · Flexible Radiator (FlexRAD)$125K
  • Federal contractNASA · Paragon Space Development Corporation (paragon) Proposes The Development Of An Advanced Condensate Separator For Microgravity Conditions (cosmic). Cosmic Is A Full Flow Condensate Separator Designed To Separate Condensate From Air Effectively And With Low Power Use. This Technology Employs Paragon S Unique And Robust, Low Power Liquid Separation Technology That Has Heritage In And Has Been Demonstrated As Highly Effective By Honeywell In The Two-phase Extended Evaluation In Microgravity (teem) F$123K
  • Federal contractNASA · Final Frontier Design (ffd) Proposes A Low Cost Personal Life Support System (plss) For A Space Suit, Utilizing Commercial, Off-the-shelf (cots) Items Wherever Possible. The Closed Loop, Low Cost Plss System Proposed Includes All The Required Systems For A Generic Eva Setup, And Can Be Packaged Effectively For Outer Space Based Applications. The Use Of Cots Items With A Minimum Amount Of Original Parts Greatly Reduces Unit And Development Costs While Maintaining A Safe And Effective Means Of Lif$125K
  • Federal contractNASA · Ot: This Is A Purchase Order For Soe 3 Cell Stack. See Attached Quote # P99901123C, Dated 06/12/2018.$77K
  • Federal grantNASA · Phase II · Development of the Integrated Water Recovery Assembly (IRA) for Recycling Habitation Wastewater$750K
  • Federal contractNASA · Igf::ot::igf Development Of 3 Flexible Mli Blankets (smart)$13K
  • Federal grantNASA · Phase I · Expandable Habitat Outfit Structures$125K
  • Federal contractNASA · Igf::ot::igf NASA Technology Roadmap Area 14 Outlines A Turn Down Goal Of 6 To 1 By A Thermal Control System Operating At The Scale Of Kilowatts Of Heat Removal. These Thermal Control Systems Must Be Designed To Perform This Turn-down And Turn-up Within A Required Time Frame Reliably And Predictably. Paragon S Innovation Will Achieve This With Lower Weight, Less Complexity, And Reduced Costs, All While Maintaining A Highly Flexible Design. The Controlled Stagnation Radiator Offers The Ideal Com$125K
  • Federal contractDefense · Igf::ot::igf SBIR Phase II Award Topic N152-099$974K
  • Federal grantDefense · Phase I · Blood and Pharmaceutical Cooling and Storage System$149K
  • Federal contractDefense · SBIRSOL2016.2 Igf::ct::igf$80K
  • Federal contractNASA · Igf::ot::igf Recovery Of Potable Water From Wastewater Is Essential To The Success Of Long-duration Human Spaceflight. For Human Missions To Mars, The Technology Maturation (ta 207) Objective Is To Recover Greater Than 98 Percent Of The Water From Wastewater Sources (urine, Humidity Condensate, Etc.). This Contract Is For The Development Of Ionomer-membrane Water Processor (iwp) Brine Processor For Flight Demonstration On The International Space Station (iss). Requirements For The Brine Pro$14M
  • Federal grantNASA · Phase II · Fabric, Inflated, Insulating Shroud for Cryogenic In-Space Transportation$748K
  • Federal contractNASA · Igf::ot::igf The Cryogenic Encapsulating Launch Shroud And Insulated Upper Stage (celsius) Innovative Layered System Combines Functions Of Multi-layer Insulation (mli), Micro-meteoroid And Orbital Debris (mmod) Protection, And Fairing Functions (exposure To Free Stream) Into A Deterministic Soft-goods System That Provides Far Greater Performance For Far Less Mass Than The Equivalent State Of The Art (sota) Systems Performing The Same Functions. Celsius Provides Nearly Perfect Radiation Dominated$891K
  • Federal grantNASA · Phase I · Thermally Insulative Structural Connection for Cryogenic Propellant Tanks$122K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation And Thin Red Line Aerospace (trla) Propose A Unique Solution That Thermally Isolates The Upper Stage Rocket From A Payload On Orbit While Still Providing Adequate Structural Connection For Orbital Maneuvers. Cryogenic Fluids Such As LH2 And Lox Are Ideal Upper Stage Propellants Because Of Their High Specific Impulse. Unfortunately, The High Thermal Conductivity Of The Adapter And Payload Interface Or Between The O2 And H2 Tanks Themselves Allo$125K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation And Our Partner Research Institution Texas Tech University (ttu) Propose To Develop A Spacecraft Habitat Wastewater Recycling System That Integrates 1) The Ttu Membrane Aerated Biological Reactor (mabr), 2) Nafion Membrane Water Purification (nwp) Distillation Technology, And 3) Gas-phase Trace Contaminant Removal To Realize A Low-mass, Low-volume, Closed-loop, Sustainable, And Ultra-reliable Water Recycling And Purification System. It Is The C$125K
  • Federal contractNASA · Igf::ot::igf Recovery Of Potable Water From Wastewater Is Essential To The Success Of Long-duration Human Spaceflight. For Human Missions To Mars, The NASA Goal Is To RECOVER>98 Percent Of The Water From Wastewater Sources (urine, Humidity Condensate, Etc.). Presently The Iss Is Able To Recover 75 Percent Of Water From These Sources. To Reach Agency Goals, The Development Of A Brine Processor Is Required. This SBIR Continues Development Of The Ionomer-membrane Water Processor (iwp) Brine Proces$370K
  • Federal contractDefense · Igf::ot::igf Status Report$149K
  • Federal contractDefense · Igf::ot::igf Coordinate Ames Testing$50K
  • Federal contractNASA · Mechanical Counter Pressure Glove$367K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation (paragon) And Our Subcontractor, Thin Red Line Aerospace (trla) Propose A Unique Solution For An Inflated Shroud System That Provides Launch, Ascent, On-orbit, And Transit Protection To A Large Cryogenic Tank. The System Consist Of An Outer Inflated Shroud That Surrounds Nested, Concentric Integrated Ballistic/radiation Shields Separated By A Series Of Loops Via Tension That Are Deployed By Gas Released Between The Perforated Layers Causing Gent$125K
  • Federal contractNASA · Igf::ot::igf Final Frontier Design's (ffd) High Pressure Eva Glove (hpeg) Is A Game Changing Technology Enabling Future Exploration Class Space Missions. The High Operating Pressure Allows Astronauts To Conduct Evas Without A Pre Breathe Penalty, Greatly Increasing Efficiency. The Hpeg Increases Astronaut Comfort And Reduces Fatigue By Allowing For A Large Range Of Motion With Low Joint Torque Throughout. In Its Current Configuration, The Glove Has Shown No Signs Of Hand Or Fingernail Trauma, Re$125K
  • Federal contractNASA · Igf::ot::igf Other Functions. Four Robust Ionomer-membrane Water Processing (iwp) Bags Reinforced To Not Leak During Testing. Bags Will Be Designed With Leak Proof Seams And Seals To The Nafion And Eptfe Materials. The Design And Delivery Of The Bags Include A Cdr, Prototype Manufacturing Including Mrr, Prototype Leak Testing, And Documentation Of The Process And Results. This Is A SBIR Phase III Procurement.$25K
  • Federal contractDefense · Igf::ot::igf SBIR Phase I, Technical Data&feasibility Study For High Performance Marine Diesel Closed Coolant System For High Speed Combatant Craft.$149K
  • Federal contractNASA · Integration And Flight Of Payloads T066-B And T124-B$340K
  • Federal contractNASA · Igf::ot::igf Comprehensive Fabrication Needs For Spaceflight Hardware Parts, Instrument Components, Structures, Fixtures, Assembly Tools, Space Vehicle Parts, Etc.; Assembly Of Fabricated Items And All Required Documentation. The Contractor Shall Manufacture, Assemble, And Prepare Documentation For Spaceflight And Non-flight Parts In Support Of The Manufacturing Engineering Group And Gsfc Projects. The Contractor Shall Provide The Required Personnel, Facilities, And Materials, Unless Otherwi$2K
  • Federal contractNASA · Igf::ot::igf Small Business Set-aside, 63 Offers Place Of Performance: Vendor Site Fabrication Of Commercial Services And Supplies For Goddard Space Flight Center The Advanced Manufacturing Branch (amb) Is Responsible For Maintaining A Complete Manufacturing Facility To Meet The Center's Research And Development Requirements And Assist In The Fabrication Of Hardware Requirements From Multiple NASA Project Missions. This Facility Includes Conventional Machining Equipment, Numerically Controlled $18K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation (paragon) Will Advance Our Solid Oxide Electrolysis / Embedded Sabatier Reactors (soe/esr) System To Generate Power From Its Oxygen (O2) And Methane (CH4) Products. Leveraging Our Soe/esr Technology, Paragon Can Offer A Carbon Deposition Resistant System Capable Of Internally Steam Reforming CH4 And Generating Power In Fuel Cell Mode. Minimal Water Is Required At Start Up; Operations Are Sustained By Recycling Water From The Affluent Using Parag$125K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation (paragon) And Enrg Incorporated (enrg)are Teaming To Provide A Highly Efficient Reactor For Carbon Monoxide/carbon Dioxide (CO/CO2) Conversion Into Methane (CH4). The System Is A Gravity-independent, Compact, Leak-tight, Solid Oxide Electrolyzer (soe) System With Embedded Sabatier Reactors (esr). Applying Corning Incorporated (corning) Intellectual Property (ip), Enrg And Paragon Can Leverage An All-ceramic, Efficient, And Low Mass Solid Oxide F$750K
  • Federal contractDefense · Igf::ot::igf Base$1M
  • Federal contractDefense · Igf::ot::igf Phase II SBIR$981K
  • Federal contractDefense · DOD 2012-3 SBIR Solicitation$150K
  • Federal contractNASA · Igf::ot::igf Our Proposed Multilayered, Flexible, Graded Z Radiation Shielding, Radflexpro, Provides Radiation Protection For Astronauts In Eva For Nasa's Future Space Missions. Radflexpro Can Be Integrated Into Current Space Suit Tmg Designs And Act As Multifunctional Layers, Providing Additional Protection From Micrometeoroids. Current Radflexpro Designs Have Three Layers. The Outer Layer Serves As A First Barrier To Decelerate High Speed And High Energy Particles: The Following Layer Deceler$125K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corporation (paragon) And Enrg Incorporated (enrg) Are Teaming To Provide A Highly Efficient Reactor For Carbon Monoxide/carbon Dioxide (CO/CO2) Conversion Into Methane (CH4). The System Is A Gravity-independent, Compact, Leak-tight, Solid Oxide Electrolyzer(soe) System With Embedded Sabatier Reactors (esr). Utilizing Corning Incorporated (corning)intellectual Property (ip), Enrg And Paragon Can Leverage An All-ceramic, Efficient, And Low Mass Solid Oxide F$125K
  • Federal contractNASA · Igf::ot::igf Paragon Space Development Corp (paragon) And Thin Red Line Aerospace (trla) Proposes To Explore The Utilization Of Inflatable Structures By Designing A Habitation Module As An Integrated, All Fabric Inflatable Structural Architecture, Rather Than Modifying Rigid Space Structural Designs With An Inflatable Envelope. Paragon And Trla Have Developed Several Concepts With The Potential To Eliminate The Need For Hard-material Support Structure Within An Inflated Habitat. A Key Feature O$125K
  • Federal contractNASA · Igf::ot::igf Final Frontier Design (ffd) Proposes To Develop And Deliver An Advanced Pressure Garment Arm With Low Torque And High Range Of Motion (rom), And Increased Durability, Using Their Unique Single Layer Approach To The Pressure Vessel Joint. Ffd Has Developed A Flat Patterned Asymmetric Shoulder Joint For Their Current Space Suit Pressure Garment, With A Natural Position In Human Rest Adduction, Approximately -10 Degrees. In Addition, This Joint Has A Focused Point Of Rotation, Like Th$125K
  • Federal contractDefense · SBIR Medical Research$99K
  • Federal contractNASA · Igf::ot::igf The Original Crave Sdc Demonstrated Feasibility Of The Sdc Concept. The Isdc Phase I And Phase II SBIR Demonstrated Feasibility Of The Isdc Concept By Using Coldplates For The Coolant Layers. The Phase Ii-e/ Phase III Will Demonstrate The Expansion Of The Architecture To Include An Alternate Mechanism For Heat Collection And Transport And Will Prepare The System For Use In The Sls As A Complete, Modular, And Passive Thermal Control Solution. The Technical Objectives Of This Phase I$100K
  • Federal contractDefense · Small Business Innovation Research (SBIR) Phase I - Rancor-rengerable, Heat-abating, Humidity-neutralizing, Carbon Dioxide Removal System$150K
  • Federal contractNASA · Igf::ot::igf Other Function - Paragon Space Development Corporation? (paragon) Proposes To Continue Our Investigation Into The Use Of Microporous-ionomer Membrane Technology To Improve The Robustness And Effectiveness And Simplify Water Recovery Processes For Space Applications. Improved Robustness And Effectiveness Will Be Evident Through (1) Reduced Loading On The Downstream Post Processor Due To The Ionomer?s Unique Property Of Selective Permeability, (2) Near Complete Removal Of Water From$749K
  • Federal contractNASA · Paragon Space Development Corporation And Our Partner Research Institution Texas Tech University (ttu) Propose To Continue Development Of A Spacecraft Habitat Wastewater Recycling System That Integrates 1) A Ttu Membrane Aerated Biological Reactor (mabr), 2) Nafion Membrane Water Purification (nwp) Distillation Technology, And 3) Gas-phase Trace Contaminant Removal (gtcr) To Realize A Low-mass, Low-volume, Closedloop, Sustainable, And Ultra-reliable Water Recycling And Purification System. It Is$750K
  • Federal contractNASA · The Original Sublimator Driven Coldplate (sdc) Design Sought To Provide Significant Mass Savings Over A Traditional Pumped Fluid Loop By Combining The Functions Of A Cold Plate And A Sublimator And Eliminating The Fluid Loop (leimkuehler, Et. Al., "design Of A Sublimator Driven Coldplate Development Unit," 2008-01-2169). The Target Application Was To Provide Heat Rejection For The Ascent Module Of The Altair Lunar Lander Vehicle During The Lunar Ascent Mission Phase. However, In Order To Provide$700K
  • Federal contractNASA · An Inflatable Habitat Is A Pressure Vessel With Flexible Shell. Notable Features Such As Low Weight, Large Inflated Operational Volume, And Small Pre-deployment Volume Offer Significant Advantages Over Traditional Rigid Metallic And Composite Habitat Structures. Conventional Designs Suffer From Indeterminacy Of Load Sharing Between Meridional And Circumferential Members As Well As The Internally Rigid Metal Support Structure. The Designs Must Functionally Index The Meridional And Circumferential$600K
  • Federal contractNASA · Extended Duration Missions To The Moon And Mars Will Require The Use Of In-situ Resources To Generate Propellants And Life Support Consumables. Many Of The Processes For In-situ Resource Utilization (isru) Produce Water, Along With A Variety Of Acid Gases And Other Water Soluble Contaminants. Paragon Proposes To Develop Membrane Technology To Separate Water Vapor From Contaminants In The Isru Systems. The Water Vapor Can Then Be Processed Using Paragon's Demonstrated Solid Oxide Electrolysis (so$600K
  • Federal contractNASA · Spacesuit Glove Pressure Garments Have Been A Design Challenge For NASA Since The Inception Of Spacesuits. The Human Hand Demands A Complex Range Of Motions, A Close Fit, An Ease Of Movement, And A Lack Of Bulk That Is At Odds With The Engineering And Durability Requirements Of An Inflated Safety Garment. While Precision Motions Of The Fingers Are Relatively Well Met By Nasa's Current I.l.c./phase Vi Gloves, The Torque Required For More Gross Power Grips Such As Translating Along Bars Or Graspin$100K
  • Federal contractNASA · Paragon Space Development Corporation Proposes The Use Of An Microporous-ionomer Membrane Pair To Improve The Robustness And Effectiveness Of Membrane-based Water Separation Processes. Improved Robustness And Effectiveness Will Be Evident Through (1) Reduced Loading On The Downstream Post Processor Due To The Ionomer's Unique Property Of Selective Permeability, And (2) Inclusion Of A Backup Barrier Between The Rententate And Permeate. The Microporous Membrane's Function Is To Prevent Liquid Wast$100K
  • Federal contractDefense · Intergrated Variable Heat-load And External Environment Tcs$99K
  • Federal contractNASA · SBIR Phase III- Build Another Pre-prototype That Demonstrates In Series Electrolysis And Sabatier Reactors With Enough Data To Ascertain Conversion In A Nominal Case. Human Space Exploration Requires Two Things: 1) Providing Consumable Resources (such As Oxygen And Water) To Sustain Human Life, 2) Maintaining A Habitable Environment Through Control Of Metabolically Produced Carbon Dioxide (CO2). Oxygen Is Typically Provided To A Spacecraft Directly From Tanks Carried On The Vehicle Or By Electro$83K
  • Federal contractNASA · The Necessity Of Oxygen For Consumption By Human Inhabitants On The Lunar Surface Is Readily Apparent. NASA Is Pursuing Several Ways To Generate Oxygen From Lunar Regolith And Reduce Reliance On Earth For Consumable Re-supply. The Most Mature Method Is Via Hydrogen Reduction. Paragon Sdc Proposes An Innovative Method For Removing The Problematic Acidic Contaminates From The Water Vapor Compound Released During The First Stage Of The Hydrogen Reduction Process. This Innovation Also Includes A Sub$100K
  • Federal contractNASA · The Original Sublimator Driven Coldplate (sdc) Design Sought To Provide Significant Mass Savings Over A Traditional Pumped Fluid Loop By Combining The Functions Of A Cold Plate And A Sublimator And Eliminating The Fluid Loop (leimkuehler, Et. Al., "design Of A Sublimator Driven Coldlpate Development Unit," 2008-01-2169). The Target Application Was To Provide Heat Rejection For The Ascent Module Of The Altair Lunar Lander Vehicle During The Lunar Ascent Mission Phase. However, In Order To Provide$100K
  • Federal contractNASA · An Inflatable Habitat Is A Pressure Vessel With Flexible Shell. Notable Features Such As Low Weight, Large Inflated Operational Volume, And Small Pre-deployment Volume Offer Significant Advantages Over Traditional Rigid Metallic And Composite Habitat Structures. Conventional Designs Suffer From Indeterminacy Of Load Sharing Between Meridional And Circumferential Members As Well As The Internally Rigid Metal Support Structure. The Designs Must Functionally Index The Meridional And Circumferential$100K
  • Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$70K
  • Federal contractNASA · TAS::80 0123::TAS The Continuation Of Concept Development And Test Of A Water-based, Advanced Phase Change Material (pcm) Heat Sink Is Proposed. Utilizing A Novel Material Choice For Both An Expansion Diaphragm And The Pcm Case Itself, The Pcm Can Accommodate Both The Expansion Of The Freezing Water-based Material And Very Low Temperature Of Approximately -250F. The Water-based Pcm Itself Would Be Non-toxic And Non-flammable, But Additives Will Be Included To Preclude Deterioration Of Wither The$600K
  • Federal contractNASA · Metabolic Heat Regenerated Temperature Swing Adsorption For CO2, Thermal And Humidity Control Mtsa Technology Specifically Addresses The Thermal, CO2 And Humidity Control Challenges Faced By Portable Life Support Systems (plss) To Be Used In Nasa's Constellation Program. Metabolically-produced CO2 Present In The Ventilation Gas Of A Plss Is Collected Using A CO2-SELECTIVE Adsorbent Via Temperature Swing Adsorption. The Temperature Swing Is Achieved Through Cooling To Well Below Metabolic Temper$600K
  • Federal contractNASA · Long Duration Spaceflight And Exploration Missions Will Require Complex Operations And Demanding Tasks. Success Will Therefore Depend On The Knowledge And Flexibility Of The Crew And The Critical Tools At Their Disposal. The Purpose Of This Phase II Project Is To Develop A Software Tool That Combines Intelligent Tutoring (or Logic) With Highly Interactive 3D Simulation Software To Create An On-demand Situational Training And Operations Support System. The Platform Will Include A User Interface T$600K
  • Federal contractNASA · Super Conducted, Non Toxic, Non Flammable Phase Change Material Thermal Pack For Portable Life Spt. Systems.$100K
  • Federal contractNASA · Metabolic Heat Generated Temp. Swing Absorption For CO2, Thermal And Humidity Control.$100K
  • Federal contractNASA · Solid Oxide Electrolysis For Oxygen Production In An Air Revitalization System This Award Was Processed Outside Of The Sytem.$599K
  • Federal contractNASA · Low Technology Readiness Level Alternative CO2$645K

Federal awards are summed by year (133 awards); hover a bar for the split. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Standing among 61 peers

Line = median

Aerospace · Orbital_ops · Material

  • Federal grants#11 · top 18%
  • Granted patents#5 · top 8%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

No founders are linked to this company yet.

Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.

Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026

Claim this profile to add your team

What it has protected

USPTO · 16 granted of 40
Show all 40 patent records
  • ULTRAMETSimilar federal contract value in Aerospace · $55.1M in contracts
  • Plasma Processes, LLCSimilar federal contract value in Aerospace · $54.6M in contracts
  • METROLASER, INCORPORATEDSimilar federal contract value in Aerospace · $54.3M in contracts
  • Third Wave Systems, Inc.Similar federal contract value in Aerospace · $53.7M in contracts
  • METAMAGNETICS INCSimilar federal contract value in Aerospace · $52M in contracts
  • Aeronix, Inc.Similar federal contract value in Aerospace · $51M in contracts

Regulatory activity · Aerospace

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .