Ormond, LLC

Aerospace · Private

Patented waterjet milling process for countersunk hole drilling in composite and laminated materials

Claim this profile

Follows are private to you and power your alerts

Updated · ormondllc.com

Sector
Aerospace
Total capital
$21.7M
Federal grants
$1.8M
4 awards · 2015–2025
2.0× sector median 2 awards
Private capital raised
None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
Federal contracts
$19.9M
41 awards · Defense, NASA
Rank in Aerospace#153 of 1335
Granted patents
3
3 pending · first 2015

Capital timeline

200320072011201520192023FEDERAL ↑EQUITY ↓Cumulative $21.7M2003: $725K across 1 contract2004: $737K across 1 contract2007: $910K across 2 contracts2008: $750K across 1 contract2009: $589K across 5 contracts2010: $2.3M across 4 contracts$2.3M2011: $150K across 1 contract2012: $1.6M across 3 contracts$1.6M2013: $1.6M across 2 contracts$1.6M2014: $1.4M across 7 contracts2015: $1.5M across 2 grants2016: $1.7M across 1 contract$1.7M2017: $125K across 1 contract2018: $125K across 1 grant · $100K across 1 contract2019: $196K across 1 contract2022: $873K across 2 contracts2023: $1.4M across 4 contracts2024: $2.4M across 2 contracts$2.4M2025: $140K across 1 grant · $2.3M across 2 contracts$2.4M
200320072011201520192023FEDERAL ↑EQUITY ↓Cumulative $21.7M2003: $725K across 1 contract2004: $737K across 1 contract2007: $910K across 2 contracts2008: $750K across 1 contract2009: $589K across 5 contracts2010: $2.3M across 4 contracts$2.3M2011: $150K across 1 contract2012: $1.6M across 3 contracts2013: $1.6M across 2 contracts2014: $1.4M across 7 contracts2015: $1.5M across 2 grants2016: $1.7M across 1 contract$1.7M2017: $125K across 1 contract2018: $125K across 1 grant · $100K across 1 contract2019: $196K across 1 contract2022: $873K across 2 contracts2023: $1.4M across 4 contracts2024: $2.4M across 2 contracts$2.4M2025: $140K across 1 grant · $2.3M across 2 contracts$2.4M

Latest events

  • Federal contractDefense · The Purpose Of This Effort Is To Develop Improved Waterjet Manufacturing Methods For Refractory Metal Gun Barrels And To Develop An Alternative To Hard-chrome Plating The Inside Diameter (id) Of Barrels.$2.1M
  • Federal grantDefense · Phase I · Research And Development$140K
  • Federal contractDefense · Research And Development$140K
  • Federal contractDefense · SBIR Phase 3 Task 4$2.2M
  • Federal contractDefense · SBIR Phase III Task 5$220K
  • Federal contractDefense · Water Jet Honing, Grinding And Machining Of Tubes: Task 3$749K
  • Federal contractDefense · Cnc Robotic Frame - SBIR Ph III$600K
Show 38 earlier federal awards
  • Federal contractDefense · Contractor To Provide Onsite Training Of The Waterjet Prototype Machine, At The Watervliet Arsenal, Watervliet, New York.$15K
  • Federal contractDefense · Minimum Guarantee $10K.$10K
  • Federal contractDefense · Phase III Water Jet Hormning$753K
  • Federal contractDefense · SBIR Phase III Follow-on Effort$119K
  • Federal contractNASA · Mill Constant Width Cooling Channels Only In Wjm Mid-scale Liners Per April 25 2019 Sow. It Is Assumed That The Liners Will Be The Same Geometry As Prior Mid-scale Liners Milled By Ormond.$196K
  • Federal contractDefense · This Contract Is For A Phase I SBIR Effort Titled: "novel Manufacturing Of Bimetallic Gun Barrels".$100K
  • Federal grantDefense · Phase I · Precision Machining of Composite with Waterjets$125K
  • Federal contractDefense · Igf::ot::igf Status Report$125K
  • Federal contractDefense · Igf::ot::igf Rifling Of Gun Barrels$1.7M
  • Federal grantNASA · Phase II · Manufacturing Advanced Channel Wall Rocket Liners$797K
  • Federal grantNASA · Phase II · Cavitation Peening of Aerospace Bearings$747K
  • Federal contractNASA · Sap Purchase Requisition: 4200523782 For SBIR Phase III Effort For Water Jet Milling Of Channel Wall Liner Coolant Passages For C-18150 Copper.$78K
  • Federal contractDefense · Igf::ot::igf SBIR Phase I$150K
  • Federal contractNASA · Igf::ot::igf This SBIR Will Adapt And Demonstrate A Low Cost Flexible Method Of Manufacturing Channel Wall Liquid Rocket Nozzles And Combustors, While Providing Developers A Means To Manufacture More Complex Designs For Improved Engine Performance. Current Channel Wall Engine Concepts Are Limited By Capabilities Of Available Manufacturing Methods. This SBIR Will Provide A Cold, Non-chemical, Low Load Alternative While Supporting More Complex Liner Designs. It Will Enable Features Such As Cooling$124K
  • Federal contractNASA · Igf::ot::igf High-value Bearings Are A Critical Part Of The Safety, Reliability, Cost And Performance Of Modern Aircraft. A Typical Passenger Jet Will Have 100 To 175 High-valve Bearings Costing From $2,500 To $50,000 Each For A Total Aircraft Cost Of $300,000 To $600,000. All Gas Turbine Engine Bearings Are Inspected At Overhaul And Typically 30-40% Of There Are Rejected. For Each Engine Overhaul, Bearing Replacement Costs On Average $100,000. Any Process That Increases Bearing Performance And $123K
  • Federal contractNASA · SBIR Phase III: Flat Plate Buildup Development And Closeout Technique Demonstration.$100K
  • Federal contractNASA · Igf::ot::igf The Phase I Project Successfully Demonstrated The Feasibility Of Developing A Technology That Will Reduce Cost And Manufacturing Time, Broaden Design Options, And Improve Performance Of Large Space Optics. Primarily Addressed Is Light Weighting Ule Glass Mirrors For Large Telescope Systems. While Milling And Cutting Materials Such As Ule Or Sic Is Often Performed At Ormond Using A Novel Abrasivejet Technology, There Is A Need To Develop This Technology To A The Requirements Of Large$750K
  • Federal contractNASA · Igf::ot::igf To Provide The Development And Demonstrability Of The Water Jet Milling Of A Channel Wall Nozzle Liner Produced From The Inconel 625$57K
  • Federal contractDefense · Igf::ot::igf Rifling Gun Barrels With Waterjets (r&d)$1.5M
  • Federal contractNASA · Igf::ot::igf Proposed Is The Development Of A Manufacturing Technology That Will Increase Feasible Large Optics Design Options And Significantly Reduce The Manufacturing Time, Cost And Risk Involved In Manufacturing Large Optic Components. Specifically Addressed Are Cutting And Light Weighting Of Glass And Ceramic Optical Components. While Milling And Cutting Materials Such As Ule Or Sic Is Often Performed At Ormond Using A Novel Technology, There Is A Need To Develop This Technology To A Point$125K
  • Federal contractDefense · Topic N111-012$750K
  • Federal contractDefense · SBIR Phase 1, Topic #A12-014 - Novel Gun Barrel Rifling Technology$150K
  • Federal contractDefense · Research And Development Topic N102-127$750K
  • Federal contractDefense · SBIR R&d Topic N111-012.$150K
  • Federal contractDefense · SBIR Phase II, Topic #:A09-050$730K
  • Federal contractDefense · SBIR Pi N102-127$150K
  • Federal contractDefense · SBIR Phase II$730K
  • Federal contractDefense · R&d SBIR Topic N092-120.$740K
  • Federal contractDefense · SBIR Phase 1, Topic #A09-050$120K
  • Federal contractDefense · Final Report And Project Summary$120K
  • Federal contractDefense · SBIR Phase I Topic N092-120$150K
  • Federal contractDefense · Ormond Llc$99K
  • Federal contractNASA · Low Cost Method Of Manufacturing Cooled Axisymmetric Scramjets Scramjet Engine Developers Are Working On Advanced Axisymmetric Engine Concepts That May Not Be Feasible Due To Limitations Of Currently Available Manufacturing Methods. The Primary Goal Of This SBIR Is To Make Available A New Technology That Will Make It Feasible To Manufacture Small Diameter One-piece Cooled Axisymmetric Scramjet Combustors. The Availability Of The Proposed Technology Will Result In Scramjet Program Cost Savings $100K
  • Federal contractDefense · Ormond Low Cost Precision Waterjet Machining Of Grid Fins$750K
  • Federal contractDefense · SBIR Phase II Topic N06-047$750K
  • Federal contractDefense · Cavitation Peening Of Ceramic Armor$160K
  • Federal contractDefense$737K
  • Federal contractDefense · 200412!000329!2100!W911W6!AVIATION Applied Technology !W911W604C0002 !a!n! !n! ! !20031031!20051028!005285288!005285288!005285288!N!ORMOND, Llc !1505 Central Avenue South !kent !WA!98032!35415!033!53!KENT !king !WASHINGTON!+000000100000!N!N!000000729982!AZ16!RDTE/OTHER Research & Development-mgmt Support !A1C!OTHER Aircraft Equipment !000 !* !541710!E! !3! ! ! ! ! !999$725K

Federal awards are summed by year (45 awards); hover a bar for the split. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Standing in Aerospace · 1335 companies

Line = median
  • Federal contracts#153 · top 11%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

No founders are linked to this company yet.

Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.

Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026

Claim this profile to add your team

What it has protected

USPTO · 3 granted of 6
Show all 6 patent records

Regulatory activity · Aerospace

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .