LYNNTECH INC.
COLLEGE STATION, TX · Medtech · Private
Field-deployable sample collection system for blood and biological specimens in remote locations
lynntech.com →- Grants
- $81M
- 213 awards
- Sector median: 1
- Raised
- —
- No Form D on record
- Contracts
- $226M
- 397 awards · NASA, Defense, Commerce
- #4 of 4531 in medtech
- Patents
- 40
- 17 granted · 23 pending
- Sector median: 2
Capital Timeline
Federal ↑Equity ↓20012003200520072009201120132015201720192021202320252027
| Date | Event | Source | Amount |
|---|---|---|---|
| Federal contract | National Aeronautics and Space Administration · A Microfluidic Icon Analyzer | $600,000 | |
| Federal contract | Department of Defense · 200312!001262!2100!MD17 !US Army Medical Research Acq ACT!DAMD1703C0096 !a!n! !n! !20030806!20040720!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Drive, Suite!college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000100000!N!N!000000000000!AN95!RDTE/OTHER Medical - Eng/manuf Develop !S1 !services !1000!NOT Discernable Or Classified !541710!E! !3! ! ! ! ! !99990909!B | $846,171 | |
| Federal contract | Department of Defense · 200402!000719!2100!W15P7T!USA Communications-electronics !W15P7T04CP415 !a!n! !n! ! !20031121!20051101!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Drive, Suite!college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000362598!N!N!000000000000!AC65!RDTE/ELECTRONICS & Communication Eq-eng/manuf Dev !A7 !electronics And Communication Equip !000 !* !541710!E! !3! ! ! ! ! !999 | $729,998 | |
| Federal contract | Department of Defense · 200409!000567!5700!GJ20 !wr-alc/pko !FA850104C0009 !a!n! !n! ! !20040621!20060621!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Drive, Suite!college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000600000!N!N!000000750000!AC12!RDTE/AIRCRAFT-APPLIED Research !S1 !services !000 !* !541710!E! !3! ! ! ! ! !999 | $1,734,854 | |
| Federal contract | National Aeronautics and Space Administration · 5KW Fuel Cell And Electrolyzer Stacks | $995,696 | |
| Federal contract | Department of Defense · 200412!000581!9700!HQ0006!MISSILE Defense Agency !HQ000604C7089 !a!n! !n! ! !20040831!20060901!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Drive, Suite!college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000750000!N!N!000000750000!AC21!RDTE/MISSILE And Space Systems-basic Research !A2 !missile And Space Systems !caa !mda Support !541710!E! !3! ! ! ! ! !999 | $750,000 | |
| Federal contract | Department of Defense · 200412!000930!5700!GD50 !oklahoma City Alc/lid !FA810304C0153 !a!n! !n! ! !20040909!20060831!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Drive, Suite!college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000750000!N!N!000000000000!AD91!RDTE/OTHER Defense-basic Research !S1 !services !000 !* !541990!E! !3! ! ! ! ! !999 | $750,000 | |
| Federal contract | Department of Defense · Fuel Cell Supply Integration And Safety | $600,000 | |
| Federal contract | Department of Commerce · SBIR Phase I | $75,000 | |
| Federal contract | Department of Defense · 200512!503524!2100!W81XWH!US Army Medical Research Acq ACT!W81XWH05C0171 !a!n! !n! ! !20050826!20060729!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Dr Ste 102 !college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000100000!N!N!000000100000!AN91!RDTE/OTHER Medical - Basic Research !C9E!ALL Other Supplies And Equipment !000 !* !541710!E! !3! ! ! ! ! !202 | $850,000 | |
| Federal contract | Department of Defense · 200605!600102!2100!W911NF!USA Materiel Command ACQUISITION!W911NF06C0011 !a!n! !n! ! !20051103!20061101!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Dr Ste 102 !college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000369494!N!N!000000369494!AZ11!RDTE/OTHER Research & Development-basic Research !S1 !services !000 !not Discernable !541710!E! !3! ! ! ! ! !999 | $716,519 | |
| Federal contract | National Aeronautics and Space Administration · Insitute Production Of Hydrogen For Buoyancy On Tital | $595,580 | |
| Federal contract | National Aeronautics and Space Administration · SBIR II: Research Porject "novel Regenerative Carbon Analyzer For Water Quality Monitoring" | $600,000 | |
| Federal contract | Department of Defense · 200607!601489!2100!W81XWH!US Army Medical Research Acq ACT!W81XWH06C0064 !a!n! !n! ! !20051220!20061220!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Dr Ste 102 !college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000100000!N!N!000000100000!AN95!RDTE/OTHER Medical - Eng/manuf Develop !S1 !services !000 !* !541710!E! !3! ! ! ! ! !999 | $850,000 | |
| Federal contract | Department of Defense · 200608!000996!5700!FA8501!WR-ALC Pko !FA850106C0037 !a!n! !y! ! !20060530!20080604!184758308!184758308!184758308!N!LYNNTECH, Inc !7607 Eastmark Dr Ste 102 !college Statio !TX!77840!15976!041!48!COLLEGE Station !brazos !texas !+000000750000!N!N!000000000000!AC11!RDTE/AIRCRAFT-BASIC Research !S1 !services !000 !not Discernable !541710!E! !3! ! ! ! ! !999 | $750,000 | |
| Federal contract | Department of Commerce · Phase II SBIR | $300,000 | |
| Federal contract | Department of Defense · Scientific Research Services | $726,589 | |
| Federal contract | Department of Defense · Scientific Research - Phase II | $740,623 | |
| Federal contract | Department of Defense · SBIR Phase I | $120,000 | |
| Federal contract | National Aeronautics and Space Administration · SBIR Phase II Reasearch Project: A Novel Technology For Simultaneous Toc Reduction And Biofouling Prevention | $598,278 | |
| Federal contract | National Aeronautics and Space Administration · Electrochemical-drive Fluid Pump For Spacecraft Thermal Control | $100,000 | |
| Federal contract | Department of Defense · R&d Effort: Natick Baa | $339,623 | |
| Federal contract | Department of Defense · SBIR Phase II High Power, Long Endurance Micro Fuel Cell For Micro Air Vehicles | $750,000 | |
| Federal contract | Department of Defense · Phase II & Phase II Continuation Effort | $750,000 | |
| Federal contract | Department of Defense · High Efficiency Power Supply | $745,829 | |
| Federal contract | Department of Defense · Scientific Research Services | $697,482 | |
| Federal contract | Department of the Interior · Dhs SBIR 5.2 Phase II - A Non Lethal, Non-tethered, Inexpensive Electro-muscular Disruption Projectile | $750,000 | |
| Federal contract | Department of Defense · SBIR Phase II, High Efficiency Phota-electrochemical Cell For Hydrogen Generation For Fuel Cells | $1,733,000 | |
| Federal contract | Department of Defense · Scientific Research Services | $750,000 | |
| Federal contract | Department of Defense · R & D: Year 2 | $723,071 | |
| Federal contract | Department of Defense · SBIR Phase I | $70,000 | |
| Federal contract | Department of the Interior · Dhs 7.1 SBIR Phase I - Highly Efficient Portable Trace Explosives Sampling System | $100,000 | |
| Federal contract | Department of Defense · SBIR Phase I Rad 3/USACEHR A072-147-1705 | $819,583 | |
| Federal contract | Department of Defense · Phase 1 SBIR Topic No. A072-092-0893 | $70,000 | |
| Federal contract | Department of Defense · SBIR Phase 1, Topic #A07-058 | $120,000 | |
| Federal contract | National Aeronautics and Space Administration · With The Increasing Power Demands And Longer Life Spans Of Space Vehicles, Their Thermal Management Becomes Ever More Critical. Accompanying This Is An Unprecedented Need For Reduction In Spacecraft Size And Weight. However, Reduced Weight Leads To Higher Power Densities, And Waste-heat Dissipation Densities Have Grown By An Order Of Magnitude With The Use Of Smaller, More Powerful Electronics. Active Thermal Control Methods Are Needed To Cope With The Increasing Heat Dissipation Requirements An | $600,000 | |
| Federal contract | Department of the Interior · Dhs SBIR 7.2 Phase I Wide-area Infrared Imager (wairi) For Increasing Human Detection Probability | $100,000 | |
| Federal contract | Department of Defense · Tthm-drinking Water | $100,000 | |
| Federal contract | National Aeronautics and Space Administration · Compact, Lightweight, Efficient Cooling Pump For Space Suits Life Support Systems. | $100,000 | |
| Federal contract | Department of Defense · SBIR Phase 1 AF073-123 Lynntech | $100,000 | |
| Federal contract | Department of the Interior · Dhs SBIR Phase II - Bio-advise - A Rapid And Fully Automated Biothreat Evluation Model | $750,000 | |
| Federal contract | National Aeronautics and Space Administration · Electolyzer Endplate Set | $9,000 | |
| Federal contract | Department of Defense · Progress Report | $70,000 | |
| Federal contract | Department of Defense · Basic Award | $69,999 | |
| Federal contract | Department of Defense · Rad Iv/wrair Cbd Phase 1 C081-107-0061 | $70,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $100,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $70,000 | |
| Federal contract | Department of Defense · Progress Report | $70,000 | |
| Federal contract | Department of Defense · SBIR I Topic N07-183, Advanced Low Temperature Ionic Liquids For Naval Electrochemical Devices | $100,000 | |
| Federal contract | Department of Defense · Scientific Research Services | $100,000 | |
| Federal contract | Department of Defense · Phase III Continuation Effort | $3,542,385 | |
| Federal contract | Department of Defense · Scientific Research Services | $70,000 | |
| Federal contract | Department of Defense · SBIR Phase I Nanoparticles Immobilized Hydrogels To Protect Skin During Flash Fire Exposure | $69,996 | |
| Federal contract· 1 of 5 same day | National Aeronautics and Space Administration · One Of The Highest Priorities In Environmental Control And Life Support (ecls) For Longer Missions Is To Recover And Process Wastewater To Provide Clean Water. There Is An Important Need For A Total Organic Carbon (toc) Sensor To Assure That The Organic Chemical Content Of Water Environment Of The Astronaut Crew Habitat Falls Within Acceptable Limits, And That The Chemical Life Support System Is Functioning Properly. For Longer Missions, Water Monitoring Requires Sensitive, Fast Response, Online | $100,000 | |
| Federal contract· 2 of 5 same day | National Aeronautics and Space Administration · With The Introduction Of Low-cost, Small, Rapidly Configurable Spacecraft, The Need For Robust, Versatile, Readily Deployable, And Easily Ground-testable Thermal Control Technologies Becomes Ever More Critical. Passive Two-phase Thermal Control Technology, That Is, Heat Pipes, Defines The Current State-of-the-art, Yet It Is Clear That This Technology Alone Will Not Meet The Needs Of Future Spacecraft. Dramatic Improvements In The Versatility And Effectiveness Of Heat Pipes Are Possible With A Sm | $100,000 | |
| Federal contract· 3 of 5 same day | National Aeronautics and Space Administration · NASA Is Now Concerned With Maintaining, Validating, And Improving Fire Safety On The Iss Throughout Its Lifetime While Providing Maximum Flexibility In The Types Of Experiments And Operations That Can Be Conducted By The Crew Members. Thus, More Comfortable, Durable And Flexible Flame Retardant Crew Clothing Is Required, Especially During Long Term Missions. Current Cotton Clothing Is Highly Flammable And Not Suitable For Fire Fighting. There Is Urgent Need To Develop Non-flammable Alternatives | $100,000 | |
| Federal contract· 4 of 5 same day | National Aeronautics and Space Administration · Portable Cathode-air-vapor-feed Electrochemical Medical Oxygen Concentrator Future Space Exploration Missions Present Significant New Challenges To Crew Health Care Capabilities, Particularly In The Efficient Utilization Of On-board Oxygen Resources. The International Space Station And Future Exploration Vehicles Require A Light Weight, Compact, Portable Oxygen Concentrator Technology (oct) That Can Provide Medical Grade Oxygen From The Ambient Cabin Air. Current Octs Are Heavy, Bulky, Have A | $100,000 | |
| Federal contract· 5 of 5 same day | National Aeronautics and Space Administration · Low Friction Surfaces For Low Temperature Applications Lunar And Other Extraterrestrial Environments Put Extreme Demands On Moving Mechanical Components. Gears Must Continue To Function And Surfaces Must Continue To Slide Over A Wide Temperature Range, The Low End Of Which Renders Most Conventional Lubricants Solidified While The High End Vaporizes Them, Especially In A Vacuum. Extremely Long Service Lives Are Needed, And Dust Can Cause Abrasive Damage. The Solution Is To Use A High Lubricity W | $100,000 | |
| Federal contract | National Aeronautics and Space Administration · Compact, Lightweight, Efficient Cooling Pump For Space Suit Life Support Systems With The Increasing Demands Placed On Extravehicular Activity (eva) For The International Space Station Assembly And Maintenance, Along With Planned Lunar And Martian Missions, The Need For Increased Human Productivity And Capability Becomes Ever More Critical. This Is Most Readily Achieved By Reduction In Space Suit Weight And Volume, And Increased Hardware Reliability, Durability, And Operating Lifetime. Consider | $600,000 | |
| Federal contract | Department of Defense · Scientific Reserach Services | $30,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · Novel Sensor For Human Voc Signature Id | $100,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · SBIR I | $100,000 | |
| Federal contract | Department of Defense · Phase 1, AF09-242 Nbc Detector, Lynn Tec | $100,000 | |
| Federal contract | Department of Defense · Lynntech Inc SBIR Phase I | $100,000 | |
| Federal contract | Department of Defense · Phase I | $275,301 | |
| Federal contract | Department of Defense · Phase I | $100,000 | |
| Federal contract | Department of Defense · Scientific Research Services | $750,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $100,000 | |
| Federal contract | Department of Defense · The Contractor Shall Provide Research Of Electrochemical Devices | $598,019 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $698,605 | |
| Federal contract· 2 of 2 same day | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $190,584 | |
| Federal contract | Department of Defense · SBIR Phase I Award For Proposal Number C091-106-0073[RAPID Air/vapor Sampling System For Chemical Threats] Submitted For Chemical & Biological Defense Topic CBD09-106. | $70,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineer | $100,000 | |
| Federal contract· 1 of 2 same day | Department of the Interior · Dhs-wide-area Infrrared Imaging (wairi) Systems For Person-in-water Detection | $846,320 | |
| Federal contract· 2 of 2 same day | Department of Defense · STTR (phase 1) - Advanced Thermally Remendable Carbon-polymer Composites | $100,000 | |
| Federal contract | Department of Defense · SBIR Phase II, Proposal A2-3612, Topic A07-058 Bipolar Membrane Structure | $729,973 | |
| Federal contract | Department of Homeland Security · Portable Biodetection Project | $5,421,760 | |
| Federal contract | Department of Defense · SBIR Phase 1 | $69,577 | |
| Federal contract | Department of Defense · SBIR I -- Enzymatic Based Bio-fuel Cell | $100,000 | |
| Federal contract | Department of Defense · First Status Report | $100,000 | |
| Federal contract | National Aeronautics and Space Administration · A Priority In Environmental Control And Life Support Systems For Extended Space Missions Is To Recover And Process Wastewater To Provide Potable Water For Crew Consumption And Oxygen Generation. Total Organic Carbon (toc) Indicates The Overall Quality Of Reclaimed And Stored Water And Their Suitability For Crew Consumption By Indicating The Potential Presence Of Hazardous Chemicals. For Extended Missions, Water Monitoring Requires Reliable, Real-time, Online Sensors, With Limited Or No Need For | $600,000 | |
| Federal contract | Department of Defense · SBIR Phase I For An Integrated, Field Portable Dna Profiler For Forensics. | $100,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase I For Electrochemical Pump Driven Individual Water Purification Device | $70,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · Research And Development For Biometric-based Flame Retardant Materials For Combat Uniforms And Equipment: Coatings/fibers Developed From Sustainable And Green Processes | $118,356 | |
| Federal contract· 1 of 5 same day | National Aeronautics and Space Administration · Effective Methods For Recovery And Regeneration Of Cabin Atmosphere To Supply Oxygen Are Critical To Facilitate Extended Duration Manned Missions Including Expeditions To Mars Or A Return To The Moon. Currently, Oxygen Is Recovered As Water Using The Sabatier Reduction Process. One Of The By-products Of This Reaction Is Waste Methane, Which Is Vented Into Space. Lynntech Proposes To Reclaim The Hydrogen From The Methane By Utilizing A Low Power, High Efficiency, Non-thermal Plasma (ntp) Process | $100,000 | |
| Federal contract· 2 of 5 same day | National Aeronautics and Space Administration · Future NASA Lunar Missions Will Require A High Efficiency, Lightweight, Long Life, Maintenance-free Water Electrolyzer For Energy Storage. Anodic Oxygen Evolution Reaction (oer) Is The Limiting Step In Water Electrolysis To Achieve High Efficiency And Durability For Current Electrolyzer Technology. Current Best Candidates For Oer Catalysts Comprising Of Iridium And Ruthenium Oxides Still Suffer From High Activation Overpotential And Incur Performance Losses In The Electrolyzer Due To Non-optimiz | $100,000 | |
| Federal contract· 3 of 5 same day | National Aeronautics and Space Administration · Airfoils Produce More Lift And Less Drag When The Boundary Layer Is Attached To The Airfoil. With Most Aircraft There Are Combinations Of Airspeed And Angle Of Attack Where The Boundary Layer At Least Partially Detaches From The Airfoil. Reducing Boundary Layer Detachment Will Increase Lift And Reduce Drag. This Will Reduce Fuel Consumption Saving Money For The Operator And Improving Control For The Pilot. Two Methods Are Known To Improve Boundary Layer Attachment: Heating The Air And Supplying | $100,000 | |
| Federal contract· 4 of 5 same day | National Aeronautics and Space Administration · TAS::80 0123::TAS With The Ever Increasing Complexity And Duration Of International Space Station (iss) Missions, Along With Planned Lunar And Martian Missions, The Need For More Advance Capabilities For Monitoring The Astronaut Crew Environment Becomes Ever More Critical. Accompanying This Is An Unprecedented Need For Reduction In Instrumentation Size, Weight, And Power Consumption. Recent Advances In Sensor Technology Have Led To The Development Of Miniature Analytical Instruments. However, Ma | $100,000 | |
| Federal contract· 5 of 5 same day | National Aeronautics and Space Administration · One Of The Most Problematic Issues That Facing Efficient Water Reclamation Processes For Long Duration Space Missions Is Biofilm Growth And Biofouling On Ro Membrane And Transfer Line Surfaces. An Immediate Need Therefore Exists To Develop New Technologies To Solve The Problems Associated With Biofouling Of Water Recovery Subsystem Surfaces. Lynntech, Inc. Proposes A Novel Technology For The Preparation And Demonstration Of Stimuli-responsive, Reagent-free, Self-cleaning Surfaces. This Technolog | $100,000 | |
| Federal contract | Department of Defense · SBIR Phase 1, Topic #OSD09-EP5 | $100,000 | |
| Federal contract | National Aeronautics and Space Administration · Future Space Exploration Missions Present Significant New Challenges To Crew Health Care Capabilities, Particularly In The Efficient Utilization Of On-board Oxygen Resources. The International Space Station And Future Exploration Vehicles Require A Light Weight, Compact, Portable Oxygen Concentrator Technology (oct) That Can Provide Medical Grade Oxygen From The Ambient Cabin Air. Current Octs Are Heavy, Bulky, Have A Narrow Operating Temperature Range (ambient To 40 Degree Celsius), And Require | $600,000 | |
| Federal contract | Department of Defense · Advanced Retinal Imaging | $100,000 | |
| Federal contract· 1 of 2 same day | Environmental Protection Agency · SBIR Phase I | $70,000 | |
| Federal contract· 2 of 2 same day | Environmental Protection Agency · SBIR Phase I | $70,000 | |
| Federal contract | Department of Defense · Progress Report | $70,000 | |
| Federal contract | Department of Defense · 6MOS SBIR Phase 1, Topic # OSD09-EP6 | $100,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · R&d SBIR Topic N101-031 | $150,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · Advanced Ferroelectric Polymers... | $100,000 | |
| Federal contract | Department of Defense · First Progress Report | $70,000 | |
| Federal contract· 1 of 5 same day | Department of Defense · SBIR Phase I Cbd / C101-108-0036 | $70,000 | |
| Federal grant· 2 of 5 same day | Department of Agriculture · Biomass-based Commodity Polymers From 5-HYDROXYMETHYLFURFURAL | $90,000 | |
| Federal grant· 3 of 5 same day | Department of Agriculture · Improved Heterogeneous Catalyst For The Transesterification Of Fats And Oils To Biodiesel | $90,000 | |
| Federal grant· 4 of 5 same day | Department of Agriculture · Novel Aqueous System For Electrochemical Generation Of Ammonia | $89,999 | |
| Federal grant· 5 of 5 same day | Department of Agriculture · Novel Aqueous System For Electrochemical Generation Of Ammonia | $8,999 | |
| Federal contract | Department of Defense · Novel Sensor For Human Voc Signature Identification | $735,495 | |
| Federal contract | Department of Defense · Status Report | $80,000 | |
| Federal contract | Department of Commerce · Small Business Innovation Research (SBIR) 2010 Phase I Proposal - An Integrated System For In-field Detection Of Microbial Contaminants In Coastal Waters. | $95,000 | |
| Federal contract | Department of Defense · Advanced Solid Inorganic Lithium-ion Conductors | $747,431 | |
| Federal contract | Department of Defense · Army SBIR Phase I | $70,000 | |
| Federal contract | Department of Defense · Technical Data | $100,000 | |
| Federal contract | Department of Defense · SBIR Ph II Enhancement/rad II | $1,000,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $100,000 | |
| Federal contract | Department of Defense · STTR Phase 1-RADII/USAISR-A10A-025-0070 | $850,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $100,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · First Progress Report | $30,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · SBIR Phase I (A102-118-0740) | $69,500 | |
| Federal contract· 1 of 5 same day | National Aeronautics and Space Administration · Producing Return Fuel On Mars Rather Than Carrying It From Earth Significantly Reduces The Mass That Must Be Lifted From Earth For A Manned Mission To Mars. The Most Practical Propulsion Combination That Can Be Produced Is Methane And Oxygen. Using Propellant Components Made On Mars To Generate Electric Power On The Return Voyage Further Reduces The Mass That Must Be Lifted. We Are Proposing To Develop An Energy Conversion System To Utilize The Components Of This Propulsion Combination To Gene | $100,000 | |
| Federal contract· 2 of 5 same day | National Aeronautics and Space Administration · Lynntech Proposes To Develop And Demonstrate The Ability Of A Compact, Light-weight, And Automated Universal Sample Preparation Module (uspm) To Process Samples From Various Sample Matrices (blood, Swab, Etc) To Yield High Quality Nucleic Acids For Downstream Molecular Detection And Identification. This Unit Allows Previously Complicated, Labor-intensive, And Time Consuming Processes To Be Carryout By A Turn-key And Closed System. Current Utilization Of Biological Testing In The Iss Is Limited B | $100,000 | |
| Federal contract· 3 of 5 same day | National Aeronautics and Space Administration · Human Exploration Of Space Demands Highly Efficient, Light-weight, Long Lifetime And Maintenance-free Power Generation Systems. Energy Storage Applications, Human-rated Exploration Vehicles, In-space Propulsion Systems, Un-manned Aerial Vehicles, Robotic And Manned Rovers Require Steady State Output Electricity Generation To Maximize The Operational Capabilities And Successfully Achieve Complex Missions. Proton Exchange Membrane (pem) Based Fuel Cell Systems Offer The Highest Efficiency And The | $100,000 | |
| Federal contract· 4 of 5 same day | National Aeronautics and Space Administration · NASA Requires An Innovative Solution To The Serious Issue Of Particulate Fouling On Air Revitalization Component Surfaces In Order To Address The Potential For Catastrophic Mission Failure From Severely Compromised Air Revitalization Performance. Additionally, This Would Not Only Limit The Number Of Replacement Components To Be Carried On A Long Term Crewed Mission, But Would Also Lower Launch Weight And Equivalent System Mass. Lynntech Proposes To Provide Proof-of-concept For Innovative Stimuli | $100,000 | |
| Federal contract· 5 of 5 same day | National Aeronautics and Space Administration · The Availability Of High-quality Potable Water Is Essential In Crewed Space Missions. Closed Loop Water Recycling Systems As Well As Potable Water Holding Tanks And Waterlines Provide Environments For Biofilm Formation That Can Facilitate The Growth Of Human Pathogens, As Well As Organisms That Can Cause Deterioration Of Distribution Lines. Prevention Requires The Maintenance Of A Chemically Stable And Biologically Effective Residual Concentration Of Biocide In Water And Wetted Surfaces Of The S | $100,000 | |
| Federal contract | Environmental Protection Agency · SBIR Phase I Lynntech, Inc | $80,000 | |
| Federal contract | Department of Defense · Topic N09-T015, Phase II, Affordable Uuv Power System Architecture | $620,993 | |
| Federal contract | Department of Defense · Basic Topic N092-132 | $300,000 | |
| Federal contract | Department of Defense · SBIR Phase II / "biometric-based Flame Retardant Materials For Combat Uniforms And Equipment: Coatings/fibers Developed From Sustainable And Green Processes." | $730,000 | |
| Federal contract | Department of Defense · Technical Data - Novel Power System For Extended Endurance Of Air Launched Suas - This Challenge Is Complicated By The Requirement To Develop Power Solutions That Do Not Produce Potential Explosive Or Environmental Hazards While System Is On-board Aircraft Or In Storage. Also It Must Have The Ability To Be Launched From A Common Launch Tube Where It Is Stowed Initially With No Initial Air Flow. It Must Be Able To Operate At Temperatures At High Altitudes. Manned Platforms Operate Between 8,000 F | $100,000 | |
| Federal contract | Department of Defense · Smart Miniaturized Power Supply | $96,224 | |
| Federal contract | Department of Defense · First Progress Report | $99,999 | |
| Federal contract | National Aeronautics and Space Administration · Future NASA Missions Require High Efficiency, Lightweight, Long Life, And Maintenance-free Water Electrolyzer Technologies To Generate Oxygen And/or Hydrogen For Energy Storage, Propulsion, Life-support Systems, Cabin-oxygen Replenishment, And Zero-g Science Activities. International Space Station, Future Lunar And Martian Outposts, And Future Exploration Vehicles Require High Efficiency Electrolyzers To Improve Their Operational Capabilities For Long And Complex Missions. The Oxygen Evolution R | $600,000 | |
| Federal contract | Department of Defense · Monthly Progress Reports - SBIR Phase I | $100,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $80,000 | |
| Federal contract | Department of Defense · SBIR Phase II | $750,000 | |
| Federal contract | Department of Defense · Scientific Research Services | $744,048 | |
| Federal contract | National Aeronautics and Space Administration · Airfoils Produce More Lift And Less Drag When The Boundary Layer Is Attached To The Airfoil. With Most Aircraft There Are Combinations Of Airspeed And Angle Of Attack Where The Boundary Layer At Least Partially Detaches From The Airfoil. Reducing Boundary Layer Detachment Increases Lift And Reduce Drag Reducing Fuel Consumption And Improving Control For The Pilot. Two Methods Known To Improve Boundary Layer Attachment Are Heating The Air And Supplying Acoustic Pressure At An Airfoil Dependent Fr | $600,000 | |
| Federal contract | Department of Defense · (STTR Phase I) - A Novel High Efficiency Thermal-electrochemical Device For Hybrid Pv/t Systems | $100,000 | |
| Federal contract· 1 of 3 same day | Department of Defense · First Progress Report | $100,000 | |
| Federal contract· 2 of 3 same day | Department of Defense · First Progress Report | $100,000 | |
| Federal contract· 3 of 3 same day | Department of Defense · Enzymatic Based Bio-fuel Cell | $749,662 | |
| Federal grant | Department of Agriculture · Improved Heterogeneous Catalyst For The Transesterification Of Fats And Oils To Biodiesel | $460,000 | |
| Federal contract | Department of Defense · STTR | $100,000 | |
| Federal contract | Department of Defense · R&d SBIR Topic N101-031 | $745,431 | |
| Federal contract | Department of Defense · High Energy Density VB2/AIR Batteries For Uavs | $150,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $150,000 | |
| Federal contract | Department of Defense · SBIR Phase I Army 2011.2 Log #11255023 | $100,000 | |
| Federal contract | Department of Defense · SBIR Phase I | $150,000 | |
| Federal contract | Department of Defense · Army Phase I Bridgegap Purchase Order, "narrow Size Distribution Of Spherical Metal Sulfide Nanoparticles" | $50,000 | |
| Federal contract | National Aeronautics and Space Administration · Lynntech Proposes A Novel Flow Control Methodology For Airfoils Undergoing Dynamic Stall. Dynamic Stall Refers To An Aerodynamic Phenomenon That Is Experienced By Airfoils That Undergo Rapid Changes In The Flow Angle Of Attack Such As Rotorcraft Based Airfoils, Flapping Wing Technologies As Well As Fixed Wing Aircrafts Undergoing Sudden Angle Of Attack Changes. Dynamic Stall Is Inherently An Unsteady, Non Linear And Complicated Effect That Can Affect Such Flight Parameters As Lift, Drag And Airf | $120,492 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $729,217 | |
| Federal contract | Department of Defense · Army SBIR Phase II Entitled, "narrow Size Distribution Of Sphericical Metal Sulfide Nanoparticles." | $725,757 | |
| Federal grant | Department of Agriculture · Rapid Detection Of Mycotoxins | $99,999 | |
| Federal contract | Environmental Protection Agency · SBIR Phase II- Lynntech, Inc | $299,999 | |
| Federal contract· 1 of 2 same day | Department of Defense · Status Report | $80,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · Status Report | $79,994 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $79,897 | |
| Federal contract | Department of Defense · New Phase I SBIR Contract. | $149,992 | |
| Federal contract | Department of Health and Human Services · Igf::ot::igf A Proof Of Concept Field Test For The Rapid Determination Of Folate Insufficiency | $150,000 | |
| Federal contract | Department of Defense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology) | $675,123 | |
| Federal contract | Department of Defense · Research And Development For Detection Of Urinary Biomarkers For Assessment Of Oxidative Status | $100,000 | |
| Federal contract | Department of Defense · Darpa SBIR Phase I | $100,000 | |
| Federal contract | Department of Defense · STTR Phase II A Novel High Efficiency Thermal-electrochemical Device For Hybrid Pv/t Systems | $750,000 | |
| Federal contract | Department of Defense · Phase I STTR- Lynntech Inc | $99,999 | |
| Federal contract | Department of Defense · The SBIR Osd Solicitation 12.2 Phase I Proposal Number: H122-013-0238, Erms# 12262010 | $150,000 | |
| Federal contract | Department of Defense · SBIR Phase II - Improved Combustion Efficiency And Reduction Of Emmissions Of Compression Ignition Engines Using On-board Non-thermal Plasma Generated Hydrogen Syngas | $725,262 | |
| Federal contract | Department of Defense · SBIR Phase II - Remote Sensing Of Cwas Using Color Changing Sensor Tags And Rfid Detector | $999,726 | |
| Federal contract | Department of Defense · This Phase I Small Business Innovative Research (SBIR) Under Topic C122-106-0045 Entitled Regenerable Carbon Dioxide Removal Technology Based On Novel Macroporous Ion Exchange Resins For Closed-circuit Breathing Apparatus Objective Is To Develop A Scrubber Based Off A High Surface Area Macroporous Ionic Resin With Advanced Grafting Techniques Using Amines To Create A Fully Regenerable Sorbent To Be Used For Carbon Dioxide Capture Within The Self Contained Breathing Apparatus. | $149,970 | |
| Federal contract | Department of the Interior · Igf::ot::igf - SBIR Phase III - Detection Of Persons-in The Water, Wide Area Search And Cueing - R&d Contract | $6,616,396 | |
| Federal contract | Department of Defense · Low Power Non Thermal Plasma Assited Removal Of Impurities For Biogas Purification | $500,000 | |
| Federal contract | Department of Defense · Recovery Of Rhenium From Superalloy Scrap | $100,000 | |
| Federal contract | Department of Defense · Phase I SBIR - Lynntech; Unpressurized High Density Oxygen Storage With Hydrogen Peroxide. | $99,272 | |
| Federal contract | Department of Defense · Status Report | $79,994 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR I--landing Site Assessment (lsa) System For Suas | $150,000 | |
| Federal contract | Department of Defense · SBIR Phase I - A123-116-0096 | $1,649,916 | |
| Federal contract· 1 of 3 same day | National Aeronautics and Space Administration · Igf::ot::igf In Situ Production Of Methane As Propellant And Oxygen As Life Support Consumables From The Atmospheric CO2 And Water On Mars Is A Key Enabling Technology Required For Sustainable And Affordable Human Exploration Of Mars. Sabatier Reaction For Catalytic Methanation Of CO2 With H2 Is A Commercially Well Known Process Achieving Conversions In Excess Of 99% At Temperature Of ~350?C. However, Application Of This Technology For Mars Missions Requires Significant Improvements In Terms Of | $125,000 | |
| Federal contract· 2 of 3 same day | National Aeronautics and Space Administration · Igf::ot::igf With The Increasing Demands Placed On Extravehicular Activities (eva) For International Space Station (iss) Maintenance, There Is A Critical Need For Oxygen Delivery For Eva's From On-station Sources. Since Mechanical Compressors Have Significant Lifetime Issues, NASA Is Evaluating High Pressure Pem Electrolyzer Technology To Generate And Compress Oxygen On The Iss. State-of-the-art Electrolyzers Use Nafion And Similar Perfluorosulfonic Acid Membranes Which Have Significant Hydrogen | $124,999 | |
| Federal contract· 3 of 3 same day | National Aeronautics and Space Administration · Igf::ot::igf Advanced Lithium-ion (li-ion) Batteries Are Currently Under Development For Extravehicular Activity Suits, Altair Lunar Landers, And Lunar Mobility Systems. However, Low Voltage Operation And Low Capacity Cathode Of Current Li-ion Batteries Limits Both Volumetric And Gravimetric Energy Density. High Capacity Cathode Materials With High Voltage Operation Are Needed To Offer The Required Gains At The Integrated Cell Level To Meet Nasa's Goal. Lynntech Proposes To Develop Advanced Cat | $124,995 | |
| Federal contract | Department of Defense · Igf::ot::igf High Energy Density VB2/AIR Batteries For Long Endurance | $749,996 | |
| Federal contract | Department of Defense · Army Phase I Entitled "high Specific Energy And Power Solid-state Energy Storage Device" | $100,000 | |
| Federal contract | Department of Defense · DOD STTR 13.A | $79,955 | |
| Federal contract· 1 of 2 same day | Department of Defense · Technical Data | $150,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · Status Report | $79,999 | |
| Federal contract | Department of Defense · A SBIR Phase I Research And Development Effort Titled "novel Pyroelectric Coatings To Provide Insect Resistant Textiles" | $94,785 | |
| Federal contract | Department of Defense · SBIR Phase I Research Triggered Textile Degradation | $100,000 | |
| Federal contract | Department of Health and Human Services · Igf::ot::igf For Other Functions | $999,999 | |
| Federal contract | Department of Defense · Igf::ot::gf First Progress Technical Report | $750,000 | |
| Federal contract | Department of Defense · Igf::ct::igf Darpa SBIR Phase I Entitled "novel Low-abundance-biomarker-quantification Assay To Detect Oxytocin In Non-tradtional Bisopecimen". | $100,000 | |
| Federal contract | Department of Defense · Award Of Phase I SBIR Topic N132-093 | $149,939 | |
| Federal contract | Department of Defense · Igf::ot::igf Osd (STTR Phase I) Micro Plasma Based Transistors For Development Of Compact High Frequency Power Supplies | $149,997 | |
| Federal contract | Department of Defense · Phase II SBIR Igf::ot::igf | $999,997 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR-1 A Novel, Point-of-care, Multi-analysis Platelet Function Diagnostic System | $149,999 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR 1 "stabl-sd For Improved Burn Casualty Stabilization And Transport" | $150,000 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR 1 - Antimicrobial Protective Silicon Wound Dressings | $149,999 | |
| Federal contract· 1 of 2 same day | Department of Homeland Security · Igf::ot::igf New SBIR Phase I Contract | $100,000 | |
| Federal contract· 2 of 2 same day | National Aeronautics and Space Administration · Igf::ot::igf In Situ Production Of Methane As Propellant By Methanation Of CO2, Also Called Sabatier Reaction, Is A Key Enabling Technology Required For Sustainable And Affordable Human Exploration Of Mars. The Sabatier Reaction Is Conventionally Carried Out In A Fixed Bed Catalyst At High Temperatures Of 350-400 ?c. For The Long Duration Future Mars Missions (~ 18 Months Expected Stay On Mars), The Fixed Bed Sabatier Reactor Design However Is Inadequate Due To Performance And Catalyst Durabilit | $750,000 | |
| Federal contract | Department of Defense · Igf::ot::igf Non-flammable Ionic Liquid Electrolytes For Li-ion Batteries SBIR I | $149,996 | |
| Federal contract | Department of Defense · Igf::ot::igf Base | $3,386,159 | |
| Federal contract | Department of Defense · SBIR Phase I, "corona Discharge Vortex Agglomerator For Improved Separation Of Fin Sand/dust Particles In Turbine Engines. | $149,997 | |
| Federal contract | Department of Defense · SBIR Phase I | $149,683 | |
| Federal grant | Department of Agriculture · Alarm: Next-generation Food-borne Pathogen Detection | $99,999 | |
| Federal contract | National Aeronautics and Space Administration · Igf::ot::igf NASA Emphasizes The Need To Implement Energy Harvesting In Its Future Mission Activities. By Harvesting Energy From The Ambient Surroundings, There Is Less Dependence On A Primary Power Supply (e.g., Combustion Engines, Fuel Cells, Batteries, Solar Cells, Etc.). Overall Power Consumption Is Thereby Reduced, Equipment Weight Goes Down And Logistical Supply Needs Are Simplified. Future NASA Missions Will Need Innovative Energy Harvesting Methods That Are Cost Effective With Reduced Ma | $125,000 | |
| Federal contract | Department of Defense · Award Of SBIR Phase I Contract Under The Topic SOCOM14-004 | $150,000 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase 2 | $746,495 | |
| Federal contract | Department of Defense · Igf::ot::igf Phase I First Monthly Technical Report | $149,995 | |
| Federal contract | Department of Homeland Security · Igf::ot::igf New SBIR Phase I Contract | $100,000 | |
| Federal contract | Department of Defense · Initial Progress | $79,999 | |
| Federal grant | Department of Defense · Phase II · Compact, Logistics Free Electrochemical Reduced Oxygen Breathing Device | $1,235,432 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase I Dhp 14.1 H141-010-0054 | $149,789 | |
| Federal contract | Department of Transportation · Igf::ot::igf Faa SBIR Phase I, 14.2-FA2-017 Lynntech, Inc.,titled " Management System Display To Track Emergency Response Vehicles And Mutual Aid During A Crash Response" | $100,000 | |
| Federal contract | Department of Defense · Igf::ot::igf Antimicrobial Protective Silicone&carbon Based Wound Dress | $998,485 | |
| Federal contract | Department of the Interior · Igf::ot::igf This Phase II Effort Is To Continue Development Of The Detection Of Textur Anomalies On The Ground (dtag) System Developed In Phase I For The Automatic Detection Of Human Footprints On Unimproved Roads. | $736,880 | |
| Federal contract | Department of Defense · Igf::ct::igf Improving Team Cognitive Reading Through The Multi-agent System For Targeting Team Mental Models {mast-tmm} | $749,993 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR II: A Novel, Point-of-care, Multi-aanlysis Platelet Function Diagnostic System | $996,831 | |
| Federal grant | Department of Health and Human Services · Phase I · Rapid detection of arsenic in water | $150,000 | |
| Federal contract | Department of Homeland Security · Igf::ot::igf Department Of Homeland Security Small Business Innovation Research 2015.1 Phase I Firm-fixed Price Contract Between The Department Of Homeland Security, Science&technology Directorate And Lynntech,inc. For Research And Development Support Services, In Accordance With Its Proposal, Entitled "multi-dimensional Digital Print Collection For Dna Collection From Same Sample". | $100,000 | |
| Federal contract | Department of Defense · Igf::ot::igf Lynntech SBIR Phase II | $1,000,000 | |
| Federal grant | National Aeronautics and Space Administration · Phase II · Heat Harvesting by Artificial Muscles | $746,990 | |
| Federal contract | Department of Defense · Igf::ot::igf Sibr I Therm Barrier Enhance Fire Suppression Intumescent | $149,995 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Advanced Li ion battery with improved cycling stability | $150,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Ultrahigh Specific Energy and Specific Power Ultracapacitor | $149,999 | |
| Federal grant | Department of Defense · Phase I · Low power water purification and desalination system | $150,000 | |
| Federal grant | Department of Health and Human Services · Phase I · Antimicrobial Microbead Containing Topical Gel for Burn Wound Disinfection | $293,368 | |
| Federal contract· 1 of 2 same day | National Aeronautics and Space Administration · Igf::ot::igf There Is Limited Capability For Water Quality Analysis Onboard Current Spacecraft. Several Hardware Failures Have Occurred Onboard Iss Which Demonstrate The Need For Measurement Of Inorganic Contaminants. Monitoring Capability Is Of Interest For Identification And Quantification Of Inorganic Species In Potable Water, Thermal Control System Cooling Water, And Human Wastewater. Needed Attributes For Such Multi-ion Analyzers To Be Used In NASA Manned Space Exploration Missions Include: | $125,000 | |
| Federal grant· 2 of 2 same day | National Aeronautics and Space Administration · Phase I · Drag Reduction through Pulsed Plasma Actuators | $122,140 | |
| Federal grant | Department of Defense · Phase I · HAMMER Hybrid Additive Manufacturing Machine with Error Rectification | $149,997 | |
| Federal contract | Department of Defense · Igf::ot::igf - SBIR - Phase I | $149,996 | |
| Federal grant | Department of Defense · Phase II · StABL-SD for Improved Burn Casualty Stabilization and Transport | $994,070 | |
| Federal contract | Department of Defense · Igf::ot::igf Ultrahigh Specific Energy And Specific Power Ultracapcitor | $149,999 | |
| Federal grant | Department of Health and Human Services · Phase II · Rapid Field Test For Iodine Levels In Salt | $485,410 | |
| Federal grant | Department of Defense · Phase I · Next Generation Organ-on-a-Chip | $149,995 | |
| Federal grant | Department of Defense · Phase I · Novel Hybrid Fuel Cell Energy System for High Power Multi-Pulse Discharge | $149,948 | |
| Federal contract | Department of Health and Human Services · Igf::ot::igf A Poc Simple For The Causative Agetnts Of Schistosomiasis And Ochocerciasis | $149,794 | |
| Federal grant | Department of Homeland Security · Phase II · Rapid Low-Cost Biological Warefare Decontamination | $760,000 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Novel Solid State Lithium-Sulfur Battery Technology for Military Vehicles | $100,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Collapsible Stabilization Devices as Broad-Spectrum Force Multipliers | $142,680 | |
| Federal contract | Department of Health and Human Services · Igf::ot::igf Simple, Inexpensive Unit For Removing Cells From Small Amounts Of Blood In Resource-limited Settings | $223,568 | |
| Federal grant | Department of Defense · Phase I · Lightweight Thermoacoustic Device Using Novel Materials for Noise Cancellation of Military Vehicles | $150,000 | |
| Federal contract | Department of Defense · Igf::ot::igf Non-thermal Plasma Synthesis And Passivation Of Halogen Containing Chemical Reagents For Prompt-agent-defeat Weapons SBIR Phase I Project | $149,760 | |
| Federal grant | Department of Health and Human Services · Phase I · Wearable Device to Monitor Blood Alcohol Levels in Real Time | $225,000 | |
| Federal grant | Department of Health and Human Services · Phase I · Biocompatible retinal prosthesis based on a conjugated polymer photoactive layer | $310,154 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · NEOSAFE Novel material for manufacturing of neonatal devices via 3D Printing | $224,982 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · NEOSAFE Novel material for manufacturing of neonatal devices via 3D Printing | $224,982 | |
| Federal contract | Department of Health and Human Services · Igf::ot::igf R&d- Medical: Biomedical (basic Research) | $299,984 | |
| Federal grant | Department of Defense · Phase I · Microfluidic Real-Time Monitoring Array with Graphene Enhanced Impedance Sensing for Coagulation Biomarker Profiling | $149,986 | |
| Federal contract· 1 of 2 same day | Department of Defense · Igf::ot::igf SBIR Ph I - Microfluidic Traveling Wave Electrophoresis System U435CNE | $99,999 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Biocompatible retinal prosthesis based on a conjugated polymer photoactive layer | $310,154 | |
| Federal grant | Department of Defense · Phase I · Advanced Cathode for High Energy Li-Air Batteries | $149,996 | |
| Federal grant | Department of Defense · Phase II · The practical application of QD-labeled phage to the detection of biological threat agents | $999,999 | |
| Federal contract | Department of Defense · Igf::ot::igf Dhp SBIR Ph II #H2-0122 | $994,246 | |
| Federal grant | Department of Defense · Phase I · Fully Integrated Light Therapy-Based Wound Dressings for Wound Healing Applications | $150,000 | |
| Federal grant | Department of Defense · Phase I · Universal Plasma Generator for Selective Removal of Anti-A and Anti-B Antibodies from Donor Plasma | $149,968 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · SNAPCAP A Novel Chronic Wound Management Device | $293,997 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · SNAPCAP A Novel Chronic Wound Management Device | $293,997 | |
| Federal grant | Department of Defense · Phase II · Low power water purification and desalination system | $1,498,564 | |
| Federal contract | Department of the Interior · Igf::ot::igf Low Power Water Purification And Desalination System. Small Business Innovation Research (SBIR)15.1 Phase II. | $1,493,008 | |
| Federal grant | Department of Defense · Phase I · The Application of Stable Bacteriophages for the Detection of Biological Threat Agents | $99,979 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR I Novel Synthetic Jet Based Anti-icing System For The MQ-9 | $149,946 | |
| Federal contract· 1 of 2 same day | National Aeronautics and Space Administration · Igf::ot::igf Planned Mars Missions Require Long Duration Stays In Orbit Or At Planet's Surface, Cannot Rely On Availability Of Pure Reactant For Power Generation, And Necessitate Sun-independent Operation Capability. Direct Methane Solid Oxide Fuel Cell (dm-sofc) Technology With An Internal Reforming Approach Has Been Investigated For Generation Of Electric Power From Methane In Order To Preserve Mission Flexibility. Current Internal Reformer Catalyst Uses A Significant Amount Of Water (or Oxyg | $124,861 | |
| Federal contract· 2 of 2 same day | National Aeronautics and Space Administration · Igf::ot::igf Crew Health And Performance Are Critical To Successful Space Explorations. However, Long Duration Missions Present Numerous Risks To Crew Health And Performance. Human Exploration Missions Beyond Low Earth Orbit (leo) Will Present Additional Challenges. These Missions Will Require Technology Solutions For Crew Health Care To Address Physiological, Psychological, Performance, And Other Needs Insitu, E.g., Self-sufficiency, Since Real-time Medical Support From The Earth, And Emergenc | $124,993 | |
| Federal contract | Department of the Interior · Igf::ot::igf Graphene Chemfets And Opto-electronics For An Environmentally Stable Portable Poc Blood Analyzer. | $150,000 | |
| Federal contract | Department of Defense · Status Report Igf::ot::igf | $80,000 | |
| Federal contract | Department of Defense · Igf::ot::igf Subsequent Phase II SBIR Entitled "regenerable Carbon Dioxide Removal Technology Based On Novel Macroporous Ion Exchange Resins For Closed-circuit Breathing Apparatus" | $965,734 | |
| Federal contract | Department of Defense · Igf::ct::igf Ruggedized Sensor System Monitoring Oceanographic Chemical Parameters | $80,000 | |
| Federal grant | Department of Defense · Phase II · Thermal Barrier Enhancement of Fire Suppression Agents through Intumescent Nanocomposite Additions | $749,997 | |
| Federal contract· 1 of 2 same day | Department of Defense · Status Report Igf::ot::igf | $150,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Safety-enhancing electrolytes for structurally sound batteries under ballistic stresses | $149,999 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase I "real-time Geospatial Haptic Feedback" U439320 | $100,000 | |
| Federal grant | Department of Health and Human Services · Phase I · A Non Toxic solution to develop next generation of insecticidal bed nets | $231,117 | |
| Federal grant | Department of Defense · Phase I · Graphene ChemFETS and Opto-electronics for an Environmentally Stable Portable PoC Blood Analyzer | $149,999 | |
| Federal contract | Department of Defense · Igf::ot::igf - Darpa SBIR Phase II Effort Entitled, "actuating Muscle For Sustainable, Minimally Invasive Energy Harvesting" | $1,502,930 | |
| Federal contract | Department of Defense · Status Report Igf::ot::igf | $79,993 | |
| Federal contract· 1 of 3 same day | Department of Defense · Igf::ot::igf Next Generation Organ On Clip - SBIR II | $750,000 | |
| Federal contract· 2 of 3 same day | Department of Defense · Igf::ot::igf Dhp SBIR Second Phase II #H2-0144 | $2,499,925 | |
| Federal contract· 3 of 3 same day | Department of Health and Human Services · Igf::ot::igf For Other Functions | $149,985 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase II · Lightweight Thermoacoustic Device Using Novel Materials for Noise Cancellation of Military Vehicles | $499,412 | |
| Federal grant· 2 of 2 same day | Department of Agriculture · Alarm: Next-generation Food-borne Pathogen Detection | $599,988 | |
| Federal grant | Department of Health and Human Services · Phase I · iCAP An Innovative Device to Rapidly Resolve Microbial Keratitis | $236,524 | |
| Federal contract | Department of Defense · Igf::ot::igf "novel Hybrid Fuel Cell Energy System For High Power Multi-pulse Discharge" | $747,272 | |
| Federal contract | Department of Defense · Igf::ot::igf Avian Vision Integrated Deterrent (avid) | $149,913 | |
| Federal grant | Department of Defense · Phase II · Advanced Li-ion battery with improved cycling stability | $749,999 | |
| Federal grant | Department of Health and Human Services · Phase II · Enhanced Non Fouling Membranes for Water Purification and Recycling | $402,678 | |
| Federal grant | Department of Health and Human Services · Phase II · One Step, POC Sample to Answer Process for RNA Analysis Outside the Laboratory | $833,462 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase I 16.1 Army, Erms# 16154001 Proposal #A161-051-0524 | $99,765 | |
| Federal grant | Department of Defense · Phase II · Microfluidic Real-Time Monitoring Array with Graphene Enhanced Impedance Sensing for Coagulation Biomarker Profiling | $1,000,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · Igf::ot::igf Army Ph 1 Proposal A161-059-0479 | $150,000 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase II · Enhanced Non Fouling Membranes for Water Purification and Recycling | $805,356 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development Igf::ot::igf | $149,999 | |
| Federal contract· 2 of 2 same day | Department of the Interior · Igf::ot::igf Signal-amplified, Real-time, Therapeutic Drug Monitoring Device | $149,791 | |
| Federal contract· 1 of 2 same day | Department of Defense · Igf::ot::igf | $980,015 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Novel Solid State Lithium-Sulfur Battery Technology for Military Vehicles | $999,999 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase I Research And Development | $80,000 | |
| Federal grant | Department of Defense · Phase I · Comprehensive Sky Compass | $149,913 | |
| Federal contract | Department of the Interior · Igf::ot::igf Component Authentication Via Provenance Encasing For Additive Manufacturing | $99,996 | |
| Federal contract | Department of the Interior · Igf::ot::igf Long Life Efficient Goal-oriented (lego) Solid-state Batteries For Long-life Electronics | $149,981 | |
| Federal contract | Department of Defense · Research And Development, SBIR Phase II, Igf::ot::igf | $999,847 | |
| Federal grant | Department of Defense · Phase I · Lightweight and ultra-conducting copper composite conductors | $100,000 | |
| Federal grant | Department of Defense · Phase I · PCBS: Portable Cooled Biomedical Storage | $142,815 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Phase II- Topic N143-128 | $749,988 | |
| Federal contract | National Aeronautics and Space Administration · Igf::ot::igf Lunar, Mars And Deep Space Exploration Missions Require Enhanced Mission Flexibility (i.e., Using Whatever Resources Available At The Destination) In Order To Reduce Logistics Burden And Overall Mission Cost. Power Generation Technologies That Are Fuel-flexible, Multi-use (e.g., Moon Or Mars), And Cross-platform (lander Use, Rover Use Or Stationary) Are Critical For Mission Flexibility. Solid Oxide Fuel Cell (sofc) Is The Most Suitable Technology For Electricity Generation From Hyd | $749,175 | |
| Federal contract | Department of Defense · "igf::ot::igf" | $1,935,231 | |
| Federal grant | Department of Defense · Phase I · Comprehensive Chemical, Biological, and Explosives Indicator Ticket Platform for Rapid Field Identification of Threats | $150,000 | |
| Federal grant | Department of Defense · Phase I · T-GAP: TURBINE GEOMETRY with ACCUMULATING PARTICLES | $124,875 | |
| Federal contract· 1 of 3 same day | National Aeronautics and Space Administration · Igf::ot::igf For Future Advanced Terrestrial Balloon Missions, NASA Requires Energy Dense And Power Dense Energy Storage Solutions Significantly Exceeding The Performance Of State Of Art Li Ion Batteries. The Requirements For A Typical 100 Day Mission Are For A 28V System Capable Of Providing Wide Power Demand Of 100 W Minimum To 2 Kw Peak. Lynntech Proposes To Design A Battery System With Energy Density In Excess Of 400 Wh/kg And Power Density In Excess Of 1,000 W/kg For The Terrestrial Balloo | $125,000 | |
| Federal contract· 2 of 3 same day | National Aeronautics and Space Administration · Igf::ot::igf Long-term Occupation Of Space Requires A Supply Of Metal Suitable For Fabrication Of Various Components And Structures. While Astronomical Objects Are Rich In The Desired Metallic Elements, These Elements Are In The Form Inappropriate For Use In Additive Manufacturing Processes. Lynntech, In Collaboration With University Of Texas El Paso, Proposes To Develop A Process To Convert Material From Its Native State (typically An Oxide Dispersed In A Silicate Matrix) To One Suitable For U | $124,999 | |
| Federal grant· 3 of 3 same day | National Aeronautics and Space Administration · Phase I · Spacecraft Position Estimation in Interplanetary Trajectories Using Star Trackers | $124,993 | |
| Federal grant | Department of Defense · Phase II · Universal Plasma Generator for Selective Removal of Anti-A and Anti-B Antibodies from Donor Plasma | $1,000,000 | |
| Federal grant | Department of Defense · Phase I · Nanomaterials-Based Moisture Transport Pathway Treatments towards Textiles with Improved Moisture Management and Comfort | $150,000 | |
| Federal grant | Department of Defense · Phase II · Advanced Textile Manufacturing Utilizing 3D Printing | $499,995 | |
| Federal contract | Department of Defense · Igf::ot::igf | $149,996 | |
| Federal contract | Department of Defense · Igf::ot::igf Analyze And Design A Study For The Comprehensive Sky Compass Csc). | $99,944 | |
| Federal grant | Department of Defense · Phase II · Effectively controlled topical delivery of an innovative combination of targeted therapeutics to treat peripheral neuropathy | $999,935 | |
| Federal grant | Department of Defense · Phase I · Conformal Stable Solid-State (CS3) High Energy, and High Power Lithium-Ion Batteries (LIBs) | $100,000 | |
| Federal grant | Department of Health and Human Services · Phase II · One Step, POC Sample to Answer Process for RNA Analysis Outside the Laboratory | $492,973 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Multi-Spectral Solution to Sniper Missed-Distance Corrective Offset | $149,939 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · A High-Throughput Platform to Culture the Unculturables | $149,865 | |
| Federal grant | Department of Health and Human Services · Phase II · Enhanced Non Fouling Membranes for Water Purification and Recycling | $402,678 | |
| Federal contract | Department of Defense · Igf::ot::igf New SBIR Phase I, Baa , Templated Synthesis Of Boron Suboxide | $149,993 | |
| Federal grant | Department of Defense · Phase I · Effectively controlled topical delivery of an innovative combination of targeted therapeutics to treat peripheral neuropathy | $150,000 | |
| Federal contract | Department of Health and Human Services · SBIR Phase II Igf::ot::igf | $999,999 | |
| Federal grant | Department of Defense · Phase I · Pyrotechnic Hybridized Layouts via Advanced Manufacturing of Energetics | $124,997 | |
| Federal contract | Department of Defense · R&d Multi-scale Multifunctional In-situ Sensing Of Strain In Parachute Cord Igf::ot::igf | $99,868 | |
| Federal contract· 1 of 2 same day | Department of Defense · Igf::ot::igf Status Report | $225,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · First Shot Mortar System | $147,119 | |
| Federal grant | Department of Defense · Phase I · Vascularized Tissue Construction Using Specialized 3D Bioprinting Techniques | $149,999 | |
| Federal grant | Department of Defense · Phase I · Deep Eutectic Solvent (DES)-based Electrolytes for Nanomaterials-based Supercapacitors | $149,999 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Ph II Environmentally Stable Point Of Care Blood Analyzer Igf::ot::igf | $3,827,581 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Environmentally Stable Portable PoC Blood Analysis Device | $1,037,581 | |
| Federal grant | Department of Defense · Phase I · 3IN1 An Innovative Product to Stabilize and Concentrate Biomolecular Species from Human Serum and Urine Samples | $150,000 | |
| Federal contract | Department of Defense · Phase I SBIR - 6 Month Base Period, Entitled Comprehensive Chemical, Biological, And Explosives Indicator Ticket Platform For Rapid Field Identification Of Threats | $150,000 | |
| Federal contract | Department of Defense · Sbir/sttr Phase I Research&development - Srpa: Scalable Rocket Performance With AF-M315E | $84,677 | |
| Federal contract | Department of Defense · Igf::ot::igf Dha SBIR Ph I Proposal H172-008-0043 Point Of Care, Microfluidic, Multi-electrode And Optical Hybrid Cbc Erms 17261012 | $149,997 | |
| Federal contract | Department of Defense · SBIR Topic 172-139 Phase I Contract Award | $125,000 | |
| Federal contract | Department of Defense · IGF::0T::IGF SBIR Tasking H172-131-0077 3IN1 An Innovative Product To Stabilize And Concentrate Biomolecular Species From Human Serum And Urine Samples | $150,000 | |
| Federal contract | Department of Defense · Human Subject Testing Of Mhtd | $1,400,343 | |
| Federal contract | Department of Defense · Igf::ot::igf Army SBIR Phase II A2-6914 | $999,935 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · VR Grip Hand Peripheral for Improved Resident Training in Surgical Simulations | $230,987 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Safe High-Energy Long-Life (SHELL) Solid-State Ultracapacitors | $149,999 | |
| Federal grant | Department of Health and Human Services · Phase I · VR Grip - hand Peripheral for Improved Resident Training in Surgical Simulations | $258,946 | |
| Federal grant | Department of Health and Human Services · Phase I · Rapid Test Kit for Measurement of Urinary Iodine | $150,929 | |
| Federal contract | Department of Defense · Igf::ot::igf SBIR Ph II Research And Development | $997,203 | |
| Federal contract | Department of Defense · Research And Development Igf::ot::igf | $224,999 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development, Igf::ot::igf | $999,988 | |
| Federal contract· 2 of 2 same day | Department of Defense · Army SBIR Ph I A173-140-0088 | $149,986 | |
| Federal grant | Department of Health and Human Services · Phase I · Rapid Test Kit for Measurement of Urinary Iodine | $150,929 | |
| Federal grant | Department of Defense · Phase I · Particle Ingestion Engine Sensor | $125,000 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · An Inhaled Clofazimine Formulation for the Treatment of Tuberculosis | $165,180 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · An Inhaled Clofazimine Formulation for the Treatment of Tuberculosis | $384,422 | |
| Federal grant | Department of Defense · Phase II · Sniper Missed-Distance Corrective Offset | $1,488,423 | |
| Federal grant | Department of Defense · Phase II · Vascularized Tissue Construction Using Specialized 3D Bioprinting Techniques | $999,993 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development | $1,184,992 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · A High-Throughput Platform to Culture the Unculturables | $1,497,329 | |
| Federal grant | Department of Defense · Phase I · Plasma Reactor for Production of Extended Solids | $100,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase II, | $1,049,819 | |
| Federal contract· 2 of 2 same day | Department of Defense · This Contract Is Firm-fixed-price (ffp) As Defined In Far 16.202-1, Issued Pursuant To Small Business Innovative Research (SBIR) Program, Phase I, Under Topic Number A18-036, To Procure A Non-personnel Services Contract For Performance Of A Research And Development Effort Entitled, Lithium Batteries With Durable Silicon Honeycomb (silicomb) Anodes, In Accordance With The Performance Work Statement, Dated 11 June 2018, And The Contractor's Proposal, Dated 06 February 2018. These Are Services Req | $1,149,845 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Lightweight and long lasting battery technology for Left Ventricular Assist Devices LVADs | $216,676 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Lightweight and long lasting battery technology for Left Ventricular Assist Devices LVADs | $216,676 | |
| Federal grant | Department of Defense · Phase I · Densely Connected Neural Networks for Remote Sensing | $99,999 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Continuous removal/disposal system for the concurrent sorption and breakdown of contaminants into harmless precipitates | $224,981 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Continuous removal/disposal system for the concurrent sorption and breakdown of contaminants into harmless precipitates | $224,981 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase II · Avian Vision Integrated Deterrent (AVID) | $742,232 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase II · One-Step, POC Sample-to-Answer Process for RNA Analysis Outside the Laboratory | $142,911 | |
| Federal grant | Department of Health and Human Services · Phase I · VR Grip - hand Peripheral for Improved Resident Training in Surgical Simulations | $27,959 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Next Generation All Solid State NASS Lithium Batteries for Implantable Devices | $228,773 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Next Generation All Solid State NASS Lithium Batteries for Implantable Devices | $228,773 | |
| Federal grant | Department of Defense · Phase I · SHACA: Super-Hydrophilic AF-M315E Capillary Action PMD | $149,785 | |
| Federal contract | Department of Defense · Progress Report | $224,998 | |
| Federal grant | Department of Defense · Phase II · Self Regenerating Dust Masks for Punishing Military Operational Environments | $999,027 | |
| Federal grant | Department of Defense · Phase II · Electrochemical Drug Infusion Pump | $1,499,998 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Pulsed Helicon Onboard Exo-Atmospheric Beam Emitter (PHOEBE) w/ magnetic nozzle for beam focusing, collimating, and steering | $99,981 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · High Power and High Energy Internal Nanohybrid Battery-Capacitor (InterNano BatCap) for Space Applications | $149,999 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development "igf::ot::igf" | $999,994 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Development of energetic feedstock for COTS additive manufacturing | $499,996 | |
| Federal contract | Department of Defense · Award Of Lynntech, Inc.'s 18(B) Army SBIR Phase II, Medical R&d Contract Iaw With Proposal No. A2-7296 For "vascularized Tissue Construction Using Specialized 3D Bioprinting Techniques" | $999,993 | |
| Federal contract | Department of Defense · SBIR I Fast-activating Solid Cathode Lithium Reserve Batteries | $150,000 | |
| Federal grant | Department of Defense · Phase I · Portable Ruggedized Energy Efficient Medical Sterilizer | $125,000 | |
| Federal contract | Department of Defense · This Is A Phase II SBIR Contract Titled: "sniper Missed-distance Corrective Offset". | $1,488,423 | |
| Federal contract· 1 of 2 same day | Department of Defense · This Contract Is For A Phase I SBIR Titled: "reserve Li/cfx Battery With High Energy And Power Density" | $150,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · On-Orbit Small Spacecraft Servicing System | $149,947 | |
| Federal contract | Department of Defense · Combination High-pressure Pump And Energy Recovery Device That Will Recover The Hydraulic Energy From The Brine Stream And Transmit It Directly To The High Pressure Pump. | $999,627 | |
| Federal grant | Department of Defense · Phase II · 3IN1 An Innovative Product to Stabilize and Concentrate Biomolecular Species from Human Serum and Urine Samples | $969,501 | |
| Federal contract | Department of Defense · Dha 17.2 SBIR Phase II Medical R&d Contract For Proposal #H2-0383, Titled: Point Of Care Test For Disease Severity And Risk Stratification - Erms 18234006 | $2,088,943 | |
| Federal contract | Department of Defense · Small Business Innovation Research (SBIR) Phase II Templated Synthesis Of Boron Suboxide | $956,739 | |
| Federal contract | Department of Defense · Gpu-enabled Large Scale State Estimation | $150,000 | |
| Federal grant | Department of Defense · Phase I · Individual Incapacitating Stun Effect Round (IISER) | $124,975 | |
| Federal grant | Department of Defense · Phase II · Enhancing Performance via Innovative Coating of Additively Manufactured Parts | $749,901 | |
| Federal contract· 1 of 2 same day | Department of Defense · This Is Small Business Innovation Research Phase II Effort Under Topic A16-128 Comprehensive Sky Compass. This Effort Shall Further Develop Comprehensive Sky Compass Sensor. | $1,012,622 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Comprehensive Sky Compass | $498,128 | |
| Federal contract | Department of Defense · Small Business Innovative Research Phase I Topic # AF183-017. An Alternate Corrosion Resistant Coating To Be Applied To Aluminum Secondary Power System Parts. | $150,000 | |
| Federal grant | Department of Health and Human Services · Phase I · An Inhaled Clofazimine Formulation for the Treatment of Tuberculosis | $219,242 | |
| Federal grant | Department of Defense · Phase I · Rapid At-home Test for Monitoring Tacrolimus Levels in Plasma | $149,882 | |
| Federal contract | Department of Defense · Army 12.3 SBIR Sequential Phase II Medical R&d Contract For Proposal #A2-7551, Titled: "self-regenerating Dust Masks For Punishing Military Operational Environments" Erms 19304001 | $999,027 | |
| Federal contract | Department of Defense · Next Generation Power Source For Weapon Systems | $150,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · DOD Phase II Small Business Innovation Research (SBIR) Program Entitled, "comprehensive Chemical, Biological, And Explosives Indicator Ticket Platform For Rapid Field Identification Of Threats." The Contractor Will Be Lynntech, Inc. Of College Station, Tx. The Period Of Performance Is 2 Years, And The Amount Of The Contract Will Be For $999,999.99. | $1,000,000 | |
| Federal contract· 2 of 2 same day | Department of Defense · SBIR Phase 1 - Shaca: Super-hydrophilic AF-M315E Capillary Action Pmd | $149,785 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Rapid Simple Antimicrobial Determination and POC Diagnostic for Gonorrhea | $243,652 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Rapid Simple Antimicrobial Determination and POC Diagnostic for Gonorrhea | $243,652 | |
| Federal contract | Department of Defense · Award Of Lynntech's Dha SBIR 19.1 Phase I Medical R&d Contract From Proposal H191-011-0058 "magnetically-induced Analgesia For Point Of Injury Pain Management" | $162,473 | |
| Federal grant | Department of Defense · Phase I · ESAD: Elastomer Selection for AF-M315E Diaphragm | $149,903 | |
| Federal contract | Department of Defense · Small Business Innovation Research (SBIR), Topic Af 191-028, A Field Depolayble Metal Deactivator Additive Analyzer | $150,000 | |
| Federal grant | Department of Defense · Phase I · AIREPAC: Automated Innovative Rapid Egress Portable Airlock Concept | $149,926 | |
| Federal contract | Department of Defense · SBIR Ph I - Proposal# A183-149-0257 - Lynntech, Inc. | $150,000 | |
| Federal contract· 1 of 5 same day | Department of Defense · SBIR Ph I Energy Harvesting System For Aircraft Wireless | $150,000 | |
| Federal contract· 2 of 5 same day | Department of Defense · Small Business Innovation Research (SBIR), Topic - Afi 191-026, Crack Sizing From Vibrothermography Data Using Neural Networks | $299,840 | |
| Federal contract· 3 of 5 same day | Department of Defense · Research And Development | $995,965 | |
| Federal contract· 4 of 5 same day | Department of Defense · Army R&d Medical Contract SBIR Ph II - A2-7604 Title: Simplified Miniature Blood Sampler And Preserver For Toxicant Exposure Monitoring Topic Number - A17-140 | $2,499,946 | |
| Federal grant· 5 of 5 same day | National Aeronautics and Space Administration · Phase I · Integrated Multi-Mode Photonic Crystal Spectrometer with On-Chip Photodetection | $124,999 | |
| Federal contract· 1 of 2 same day | Department of Defense · Deep Eutectic Solvent (des)-based Electrolytes For Nanomaterials-based Supercapacitors. | $969,501 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Deep Eutectic Solvent (DES)-based Electrolytes for Nanomaterials-based Supercapacitors | $497,664 | |
| Federal contract | Department of Defense · Phi SBIR Award With Option Period | $107,999 | |
| Federal grant | Department of Health and Human Services · Phase I · Rapid electrochemical detection of arsenic in water | $196,003 | |
| Federal contract | Department of Defense · Army R&d Medical Contract SBIR Phase II, Proposal No. A2-7599, Titled, " 3IN1 An Innovative Product To Stabilize And Concentrate Biomolecular Species From Human Serum And Urine Samples", Topic Number A17-131 | $1,000,000 | |
| Federal grant | Department of Defense · Phase I · TINEY – Pre-Preg Out of Autoclave Processing | $140,000 | |
| Federal grant | Department of Defense · Phase I · Experimentally-Validated Model for Heat Treatment of 3D Printed Titanium | $167,254 | |
| Federal grant | Department of Defense · Phase II · Fooling Computer Vision Classifiers with Adversarial Examples | $999,924 | |
| Federal contract | Department of Defense · Multi-cell Human 3D Brain Model On Chip Proposal #F19C-001-0030 Topic AF192C-T0001 | $150,000 | |
| Federal grant | Department of Health and Human Services · Phase II · Rapid Test Kit for Measurement of Urinary Iodine | $538,447 | |
| Federal contract | Department of Defense · Medical Research And Development Purchase Order For Dha SBIR Ph I H192-002-0012 For Neurofeedback Of Vestibular Response For Optimization Of Applied Neuromodulation To Mediate Vestibular Impairment | $246,478 | |
| Federal grant | Department of Defense · Phase I · Comprehensive and Modular Military Working Dog Decontamination Kit | $167,500 | |
| Federal grant | Department of Health and Human Services · Phase II · Rapid Test Kit for Measurement of Urinary Iodine | $1,035,887 | |
| Federal grant | Department of Defense · Phase I · Integrated Video Intent Determination for Guarding with Identity Layers (iVIDGIL) | $111,500 | |
| Federal contract | Department of Defense · This Is A Small Business Innovation Research - Phase I Effort With A 10-MONTH Duration Base Period And A 6-MONTH Option Period If Exercised, Subject: Deep Generative Modeling Of Infrared Datasets For Aided Target Recognition, Topic # A19-119. | $111,499 | |
| Federal contract | Department of Defense · SBIR Phase 1 Topic N193-146 Contract Award | $139,736 | |
| Federal contract· 1 of 2 same day | Department of Defense · The Purpose Of This SBIR Phase II Effort Is Directed Towards The Commercialization Of A New Class Of Two-dimensional Inorganic Nanosheets, Known As Mxenes. | $749,208 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Methods for the Scaled up Production of Stabilized MXenes | $749,864 | |
| Federal contract | Department of Defense · Lynntech SBIR I Proposal C192-004-0010 | $167,499 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Dual Application Relativistic Linear Accelerator (DARLA) | $149,745 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · High Energy Rechargeable Li-Metal with Enhanced Safety (HERMES) Batteries | $150,000 | |
| Federal contract | Department of Defense · Sbir/sttr Phase II R&d - High Power And High Energy Internal Nanohybrid Battery-capacitor (internano Batcap) For Space Applications. | $1,820,816 | |
| Federal grant | Department of Defense · Phase I · Genetically engineered bacteriophages against bio-threat bacteria | $167,499 | |
| Federal grant | Department of Defense · Phase I · Bulk Semiconductor Neutron Detection via Advanced Boron Materials | $100,000 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Development of a Simple Diagnostic for Causative Agents of Schistosomiasis | $241,547 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Development of a Simple Diagnostic for Causative Agents of Schistosomiasis | $172,692 | |
| Federal grant | Department of Defense · Phase II · Safe High-Energy Long-Life (SHELL) Solid-State Ultracapacitors | $999,499 | |
| Federal grant· 1 of 3 same day | Department of Defense · Phase I · Large scale natural melanin production for military applications | $166,500 | |
| Federal grant· 2 of 3 same day | Department of Defense · Phase I · Energy Harvesting Multiferroic Resonating Beams for Unattended Sensors | $111,489 | |
| Federal grant· 3 of 3 same day | Department of Defense · Phase I · Advanced composites for avionics packaging | $139,999 | |
| Federal contract | Department of Defense · Research And Development | $139,998 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Rapid Additive Production Technology for Optimized Repair (RAPTOR) | $111,389 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · JP8 fueled, Personal Atmospheric Water Harvester | $111,459 | |
| Federal grant | Department of Defense · Phase I · Deblurring and Rolling Shutter Artifact Mitigation for fast Panning | $140,000 | |
| Federal grant | Department of Defense · Phase II · Rapid At-home Test for Monitoring Tacrolimus Levels in Blood | $1,099,983 | |
| Federal contract | Department of Defense · SBIR Phase I Phase 1 Small Arms Bullet Tracking Techniques And Algorithm Development. | $111,471 | |
| Federal grant | Department of Health and Human Services · Phase I · Development of a dengue exposure monitor | $244,402 | |
| Federal grant | National Aeronautics and Space Administration · Phase I · Moon Express - Green Propellant Lunar Transfer Stage | $124,674 | |
| Federal grant | Department of Health and Human Services · Phase I · Rapid POC diagnostic for Candida species and multidrug resistance identification | $224,757 | |
| Federal contract | Department of Defense · SBIR I Phase I Topic A201-018-0369. Energy Harvesting Multiferroic Resonating Beams For Unattended Sensors | $111,489 | |
| Federal contract | Department of Defense · Develop Reference Testing Method For Corrosion Effects From Interaction Of Lead-free Material And Ammunition Housing In Various Liquid Solvents And Identity A Technology For Nondestructive Detection Of Corrosion In Brass. | $111,499 | |
| Federal contract | Department of Defense · On-demand Hypoxia Trainer | $3,180,578 | |
| Federal contract | Department of Defense · SBIR Phase I Final Report And Project Summary | $167,254 | |
| Federal grant | Department of Health and Human Services · Phase I · iKITT Innovative Keratitis Identity Type Test | $147,526 | |
| Federal contract | Department of Defense · The Purpose Of This Contract Is To Award A SBIR Phase I Under Topic A19-158 | $111,500 | |
| Federal contract | Department of Defense · Phase II SBIR | $1,000,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · Research And Development | $238,280 | |
| Federal contract· 2 of 2 same day | Department of Defense · SBIR Phase I: Lynntech | $111,459 | |
| Federal contract· 1 of 2 same day | Department of Defense · Multi-channel Infusion Pump (mcip)- Small Business Innovation Research (SBIR) III | $3,937,064 | |
| Federal grant· 2 of 2 same day | National Aeronautics and Space Administration · Phase II · Generative Adversarial Networks for Real-Time Realistic Physics Simulations | $749,962 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase II · GPU-Enabled Large-Scale State Estimation | $749,902 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · iKITT Innovative Keratitis Identity Type Test | $310,891 | |
| Federal contract | Department of Defense · Phase I Kickoff Summary Report - | $199,949 | |
| Federal grant | Department of Defense · Phase II · Deep Generative Modeling of Infrared Datasets for Aided Target Recognition | $544,759 | |
| Federal contract· 1 of 2 same day | Department of Defense · Next-generation Rechargeable Zinc Batteries For Electric Vertical Takeoff And Landing Aircraft | $149,964 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Additive Manufacturing of Carbon-fiber Composite using RF Heating for Advanced Air Mobility Vehicles | $149,949 | |
| Federal contract | Department of Defense · 6TH Phase I Status Report | $111,493 | |
| Federal contract | Department of Defense · In Situ Production Of Infrared Obscurant | $111,499 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Development of Self-Detoxifying Filter Media for Active Decontamination | $250,768 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Development of Self-Detoxifying Filter Media for Active Decontamination | $250,768 | |
| Federal grant | Department of Defense · Phase I · Multiplexed, high-throughput functional assay to evaluate bactericidal activity of antibodies against Shigella | $249,997 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase II: Comprehensive And Modular Military Working Dog Decontamination Kit | $1,550,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Comprehensive and Modular Military Working Dog Decontamination Kit | $775,461 | |
| Federal contract | Department of Defense · This Contract Is Firm-fixed-price (ffp) As Defined In Far 16.202-1, Issued Pursuant To Small Business Innovative Research (SBIR) Program, Phase I, Under Topic Number A20-103. | $49,974 | |
| Federal contract | Department of Defense · 1ST Monthly Progress Report | $111,389 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase II - A2-8241 - Lynntech, Inc. - "self-powered Desalination Battery For Individual Soldiers" | $1,099,977 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · AREPI âÃÂàASCENT Rapid Emergency Power Igniter | $49,941 | |
| Federal contract | Department of Defense · Small Business Innovation Research Phase I, Entitled, Turnable Infrared Transparent Adhesive | $111,497 | |
| Federal grant | Department of Defense · Phase II · Next-Generation Aluminum Molten Air Battery for Munition Systems | $749,998 | |
| Federal contract· 1 of 2 same day | Department of Defense · New Darpa SBIR Phase II | $1,489,214 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Generative Augmentation by Pose and Style Transfer to Amplify Radiant Imagery (GAP-STAR) | $1,499,351 | |
| Federal grant | Department of Health and Human Services · Phase II · Rapid Test Kit for Measurement of Urinary Iodine | $497,440 | |
| Federal contract | Department of Defense · Quick-single Nucleotide Polymorphism (quick-snp) | $166,053 | |
| Federal grant | Department of Health and Human Services · Phase I · Development of a Simple Diagnostic for Causative Agents of Schistosomiasis | $68,855 | |
| Federal grant | Department of Defense · Phase I · Chemical Threat Agent Sensors on UAV Platforms | $49,998 | |
| Federal contract | Department of Defense · Small Business Innovation Research (SBIR) Phase I Bridge And SBIR Phase II Effort Titled, Deep Generative Modeling Of Infrared Datasets For Aided Target Recognition. | $1,155,985 | |
| Federal grant | Department of Homeland Security · Phase I · Development of a Novel Biothreat Detection System | $149,702 | |
| Federal grant | Department of Homeland Security · Phase I · Non-Invasive Breathalyzer Detector to Screen the Presence of Viral Respiratory Infections | $150,000 | |
| Federal grant | Department of Health and Human Services · Phase II · iCAP An Innovative Device to Rapidly Resolve Microbial Keratitis | $468,754 | |
| Federal contract | Department of Defense · Small Business Innovative Research Phase II- Energy Harvesting System | $749,999 | |
| Federal grant· 1 of 2 same day | Department of Health and Human Services · Phase I · Point-of-care diagnostic for amplification and detection of SARS-CoV-2 RNA | $260,571 | |
| Federal grant· 2 of 2 same day | Department of Health and Human Services · Phase I · Point-of-care diagnostic for amplification and detection of SARS-CoV-2 RNA | $256,575 | |
| Federal grant | Department of Defense · Phase I · Mobile On-Demand Hydrogen Peroxide Generation System | $167,499 | |
| Federal grant | Department of Health and Human Services · Phase I · iKITT Innovative Keratitis Identity Type Test | $163,365 | |
| Federal grant | Department of Defense · Phase II · Experimentally-Validated Model for Heat Treatment of 3D-Printed Titanium | $549,999 | |
| Federal contract | Department of Defense · New Purchase Order For Dha SBIR Ph I H211-009-0082 Project Titled, "portable Oxygen Generator For Deployed Army Casualty Care". | $249,999 | |
| Federal grant | Department of Defense · Phase I · COMET: COolant MEthod for Extreme Temperatures | $139,999 | |
| Federal contract | Department of Defense · Commercial Availability Of Pristine TI3C2 Mxenes | $999,999 | |
| Federal contract | Department of Defense · The Overall Objective Of This Work Is To Develop An Integrated And Continuous Drying Process To Produce Highly Dispersible Obscurant Materials With Performance Significantly Superior To Baseline Materials. | $1,095,954 | |
| Federal contract· 1 of 2 same day | Department of Defense · Energy Dense Battery | $49,998 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Advanced UAV Wiring System Clamps | $49,993 | |
| Federal contract | Department of Defense · High Energy Rechargeable Li-metal Batteries With Enhanced Safety (hermes) | $49,995 | |
| Federal grant | Department of Defense · Phase I · CHARIOT: Connector High-speed Aerial Resupply/Insertion Over-the-horizon Transport | $224,981 | |
| Federal contract | Department of Defense · Contract Award Of STTR Phase 1 Topic N21B-T023 | $239,962 | |
| Federal contract | Department of Defense · Army Small Business Innovation Research (SBIR) Program For The Effort Entitled "experimentally-validated Model For Heat Treatment Of 3D-PRINTED Titanium" | $1,099,999 | |
| Federal contract | Department of Defense · SBIR Phase 2 Research And Development | $2,093,018 | |
| Federal grant | Department of Defense · Phase I · Far-Forward Austere Sterilizer (FAST) | $250,000 | |
| Federal grant | Department of Defense · Phase I · Impact Resistant Mortar Baseplate | $259,608 | |
| Federal contract | Department of Defense · Behavioristic Electromagnetic Spectrum Assessment General Learning Engine(beagle) - Small Business Innovation Research (SBIR) Phase I | $259,611 | |
| Federal grant | Department of Defense · Phase I · Surface-Enhanced Raman Scattering Substrate | $165,415 | |
| Federal grant | Department of Homeland Security · Phase II · Development of a Novel Biothreat Detection System | $999,992 | |
| Federal grant | Department of Defense · Phase II · Next-Generation Rechargeable Zn Batteries for Electric Vertical Takeoff and Landing (eVTOL) Aircraft | $749,992 | |
| Federal grant | Department of Health and Human Services · Phase II · iCAP An Innovative Device to Rapidly Resolve Microbial Keratitis | $521,787 | |
| Federal grant | Department of Defense · Phase II · Multiplexed, High-throughput Functional Assay to Evaluate Bactericidal Activity of Antibodies Against Shigella | $1,099,999 | |
| Federal contract | Department of Defense · Baa Topic 6-RECHARGEABLE Electrode Materials For Desalination Battery | $302,330 | |
| Federal grant | Department of Defense · Phase I · SiC based CMCs with improved properties | $139,975 | |
| Federal grant | Department of Defense · Phase II · Quick-Single Nucleotide Polymorphism (Quick-SNP) | $1,023,849 | |
| Federal grant· 1 of 2 same day | National Aeronautics and Space Administration · Phase I · Hybrid Water Removal and Reclaimation System (HyWaRRS) | $149,983 | |
| Federal grant· 2 of 2 same day | National Aeronautics and Space Administration · Phase I · Unitized High Pressure Regenerative Fuel Cell Stack for NASA Applications | $149,999 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Novel Green Oxidizer for Solid Propellants | $150,000 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Improved performance and efficiency of solid propellants through enhanced surface passivation of energetics | $150,000 | |
| Federal contract | Department of Defense · Biometrically Inferred Observations For Determining Access And Tracking (biodat) Camera System | $249,554 | |
| Federal grant | Department of Defense · Phase I · Carbon fiber hoops embedded tire | $249,915 | |
| Federal grant | Department of Defense · Phase II · TBD | $1,099,986 | |
| Federal contract | Department of Defense · Lynntech,inc. Phase 1. | $249,124 | |
| Federal contract | Department of Defense · SBIR Phase 1 Research And Development | $238,421 | |
| Federal contract· 1 of 2 same day | Department of Defense · Provide A Portable On-demand Hydrogen Peroxide Generation Which Would Enable Greater Utilization Of This Versatile Green Oxidant In Applications Ranging From Environmental Remediation To Portable Sanitation To Decontamination. | $1,099,995 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Portable On-Demand Hydrogen Peroxide Generation System | $549,997 | |
| Federal contract | Department of Defense · 873 Authority. Packaged Energy Cargo For Expeditionary Operations | $1,249,994 | |
| Federal contract | Department of Defense · Elastomeric Selection For Monopropellant Diaphragm | $750,000 | |
| Federal contract | Department of Defense · SBIR Phase I. | $139,956 | |
| Federal grant | Department of Defense · Phase II · Connector High-speed Aerial Resupply/Insertion Over-the-horizon Transport | $1,499,821 | |
| Federal grant | Department of Defense · Phase I · Hyperextending Insertion System with Sensing (HISS) | $139,998 | |
| Federal grant | Department of Defense · Phase I · Wearables, Biomarkers and Performance Recovery | $146,567 | |
| Federal grant | Department of Defense · Phase I · Event Based Star Tracker | $150,000 | |
| Federal grant | Department of Defense · Phase I · Onsite detection and morphological classification of aerosol particles | $182,998 | |
| Federal contract | Department of Defense · "lynntech, Inc." SBIR Phase II Award Under Topic: A224-020 | $1,699,999 | |
| Federal grant | Department of Defense · Phase II · Far-Forward Austere Sterilizer (FAST) | $1,100,000 | |
| Federal contract | Department of Defense · Lynntech, Inc. SBIR Phase I Under Topic Number A224-024, Lightweight Reconfigurable UH-60 Floor. | $249,997 | |
| Federal grant | Department of Defense · Phase II · Deep Eutectic Solvent (DES)-based Electrolytes for Nanomaterials-based Supercapacitors | $1,000,000 | |
| Federal contract | Department of Defense · Joint Multi-channel Infusion Pump- Award Off Two-step Call On A Broad Agency Announcement | $5,973,933 | |
| Federal grant | Department of Health and Human Services · Phase II · iCAP An Innovative Device to Rapidly Resolve Microbial Keratitis | $566,768 | |
| Federal grant | Department of Defense · Phase II · Remotely Activated Lithium Reserve Battery for Minuteman III Mk12A Reentry Vehicle | $1,799,646 | |
| Federal contract | Department of Defense · Offline Maintenance Actions | $156,653 | |
| Federal contract | Department of Defense · Multi-angle Mesh For Bidirectional Reflectance Distribution Function (brdf) Measurement | $179,434 | |
| Federal contract | Department of Defense · Small Business Innovation Research, Phase II Topic# A214-018 Recognition Biometric Camera System Phase I Was Awarded As Contract# W909MY-22-P-0008. | $1,699,943 | |
| Federal grant· 1 of 2 same day | Department of Defense · Phase I · Enteric Respiration Replacement Life Support (ERRLS) | $249,542 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Integrated Optical Circuit (IOC) with Reduced Half-Wave Voltage | $139,999 | |
| Federal grant | Department of Defense · Phase I · Ankle EVAL-ASSIST Portable Technology to Assess Ankle Instability | $249,990 | |
| Federal contract | Department of Defense · 873AUTHORITY | $239,781 | |
| Federal contract | Department of Defense · SBIR Phase I | $140,000 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase I - Topic N231-063 | $139,974 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase I · Reliable Hydroxyl-Terminated PolyButadiene for Rocket Motors | $139,970 | |
| Federal grant | Department of Health and Human Services · Phase I · An Isothermal Method to Amplify RNA from Bloodborne Viruses | $290,196 | |
| Federal grant | Department of Health and Human Services · Phase I · An Isothermal Method to Amplify RNA from Bloodborne Viruses | $290,196 | |
| Federal contract | Department of Defense · Monthly Status Report | $149,756 | |
| Federal contract· 1 of 2 same day | Department of Defense · STTR 2 N21B-T023 | $1,299,977 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Next-Generation Lithium Battery Enabled by Holey Graphene-based Electrodes | $999,993 | |
| Federal contract· 1 of 2 same day | Department of Defense · "lynntech, Inc." SBIR Phase II Base Award. | $1,699,958 | |
| Federal grant· 2 of 2 same day | Department of Defense · Phase II · Hybrid-powered Energy-efficient Ruggedized Module for Environmental Surveillance | $1,799,692 | |
| Federal contract | Department of Defense · Aptamer-based Silk Hydrogel Sensor To Detect Stress-molecules Under Skin | $179,472 | |
| Federal contract | Department of Defense · Small Business Innovation Research Phase I | $139,972 | |
| Federal contract | Department of Defense · SBIR Phase I | $139,988 | |
| Federal contract | Department of Defense · Kick-off Briefing Materials & Fwa Cert. | $239,837 | |
| Federal contract | Department of Defense · SBIR Ph I | $238,938 | |
| Federal contract | Department of Defense · SBIR II Lynntech | $690,146 | |
| Federal contract | Department of Defense · Darpa SBIR Falcon | $274,987 | |
| Federal contract | Department of Defense · SBIR Phase II "onsite Detection And Morphological Classification Of Aerosol Particles" | $1,315,203 | |
| Federal contract | Department of Defense · Optiframe - Topology Optimized Load-bearing Airframe With Additive Manufacturing (proposal Number: F2D-9713) | $1,759,931 | |
| Federal contract | Department of Defense · "lynntech, Inc." SBIR Phase II | $1,853,966 | |
| Federal contract | Department of Defense · SBIR D2P2 (topic 3: AF233-D002) - Aircraft Vibration Harvester (avh) To Design, Manufacture, And Reach Trl 6 For An Energy Harvesting System Resilient In High-performance Military Aircraft, Ready For Airborne Testing. | $1,759,997 | |
| Federal contract· 1 of 2 same day | Department of Defense · To Develop A Metal Powder Based Additive Manufacturing System For Deployment In Expeditionary Environments To Manufacture Complex Metal Components With Minimal Post Processing Requirements At Or Near The Point Of Need To Support Logistics Scenarios | $193,499 | |
| Federal contract· 2 of 2 same day | Department of Defense · Advancement Of High Energy Rechargeable Lithium Batteries | $750,000 | |
| Federal contract | Department of Defense · SBIR Phase I Proposal F241-0007-0119 - Conformal Safe Solid-state (CS3) Li Metal Battery (lmb) | $179,995 | |
| Federal contract | Department of Defense · Phase I Small Business Technology Transfer (STTR) Contract For "thermal Protection Costing For Artillery Projectiles" | $196,959 | |
| Federal grant | Department of Health and Human Services · Phase I · Cutaneous Gel Delivering an Intriguing MOA Therapeutic to Treat DFU | $343,708 | |
| Federal contract | Department of Defense · Kickoff Briefing | $139,974 | |
| Federal contract | Department of Defense · Feasibility Study, SBIR Phase I, Topic SOCOM244-007, Thermal Barrier Minimal Deflection Handguard | $174,937 | |
| Federal grant | Department of Health and Human Services · Phase I · Make an OFERR: Optimization for Enhanced RNA Replication | $283,304 | |
| Federal contract | Department of Defense · R&d: SBIR Phase II Topic N222-088 Retrofittable High Power Kit For The Jltv | $998,582 | |
| Federal contract | Department of Defense · 873AUTHORITY | $999,306 | |
| Federal contract | Department of Defense · Research And Development | $139,976 | |
| Federal contract | Department of Defense · This Is An Award Of A Base Contract Under Small Business Innovative Research Program Topic 24.2-070. | $239,488 | |
| Federal contract | Department of Defense · SBIR Phase I Lynntech Inc F242-0004-0024 | $179,133 | |
| Federal contract | Department of Defense · F242-0017-0023 Lynntech, Inc. The Objective Of This Topic Is To Improve Space-based Photovoltaic Power Generation Through Non-traditional Improvements To The Solar Cell Module, Such As Modification Of The Cover Glass Or Encapsulant. | $179,906 | |
| Federal contract | Department of Defense · STTR Phase I - Proposal No: A24B-T019-0022 Research And Development Of A Novel Resin For Three-dimensional Printing Of Ballistic Protection Safety Glasses. | $203,950 | |
| Federal contract | Department of Defense · Lynntech Event Based Star Tracker | $1,249,994 | |
| Federal contract | Department of Defense · Lynntech, Inc SBIR Phase I A244-P063 Batteries Focused Open Topic | $249,920 | |
| Federal contract | Department of Defense · Offline Maintenance Actions | $249,648 | |
| Federal contract | Department of Defense · SBIR Phase II - AF221-0018 Wearables, Biomarkers, And Performance Recovery | $1,249,999 | |
| Federal contract | Department of Defense · Joint Multi-channel Infusion Pump Technical Maturation And Risk Reduction | $6,538,391 | |
| Federal contract | Department of Defense · 873AUTHORITY | $997,103 | |
| Federal contract | Department of Defense · 873AUTHORITY | $899,677 | |
| Federal contract· 1 of 2 same day | Department of Defense · SBIR Phase I. | $237,762 | |
| Federal contract· 2 of 2 same day | Department of Defense · Research And Development. | $139,984 | |
| Federal contract | Department of Defense · Daf Topic Number: AF241-0007 Proposal Number: F2-18953 Subject: Conformal Safe Solid-state (CS3) Li Metal Battery (lmb) | $1,799,986 | |
| Federal contract | Department of Defense · Small Business Innovative Research (SBIR) Phase II Topic A254-003, Lynntech, Inc. | $1,998,583 | |
| Federal contract | Department of Defense · SBIR Phase I Base For N00024-25-C-S285 | $139,948 | |
| Federal contract | Department of Defense · Far-forward Austere Sterilizer (fast) | $1,949,986 | |
| Federal contract | National Aeronautics and Space Administration · High-pressure Electrochemical Lift Pump | $848,894 | |
| Federal contract | Department of Defense · Research And Development | $139,988 | |
| Federal contract | Department of Defense · Research And Development | $139,897 | |
| Federal contract | Department of Defense · Research And Development | $999,913 | |
| Federal contract | Department of Defense · This Is A Phase I Contract Award Under Small Business Innovative Research 25.2-074. | $139,993 | |
| Federal contract | Department of Defense · SBIR Phase III Topic N132-093 Delivery Order Placed Under Boa N68335-25-G-0017 | $9,999,992 | |
| Federal contract | Department of Defense · On-demand Generation Of Hydrogen Peroxide For Vaporous Decontamination Systems | $1,677,774 |
Federal grant · SBIR/STTRFederal contract · USAspending
Peer position
| # | Company | Contracts | Disclosed equity |
|---|---|---|---|
| 1 | SIGNAL SOLUTIONS, LLC | $678M | — |
| 2 | OCEANIT LABORATORIES INC | $250M | — |
| 3 | Personalis, Inc. | $246M | $69M |
| 4 | LYNNTECH INC. | $226M | — |
| 5 | CEPHEID | $219M | $5.2M |
| 6 | Spectral Md, Inc. | $189M | $1.1M |
| 7 | Synchron | $170M | $82M |
Ranked on federal contract value rather than capital raised. The equity column is the comparison worth making — companies at the same procurement position often sit at very different points in their funding history.
Patents
- Hypoxia Training Devicegranted
- Hypoxia Training Devicegranted
- Micropumpapplication
- Energetic Feedstock for Additive Manufacturinggranted
- Micropumpgranted
- Integrated Energy Generation and Desalination System and Methodgranted
- Electrochemically Actuated Pumpgranted
- Apparatus for Pumping Fluidgranted
- Hypoxia Training Devicegranted
- Electrolyte for Electrochemical Energy Storage Devicesgranted
- Hypoxia Training Devicegranted
- Fuel Cell Storage Systemgranted
Regulatory activity · Medtech
- New Animal Drugs; Approval of New Animal Drug Applications; Withdrawal of Approval of New Animal Drug Application; Change of SponsorFood and Drug Administration
- Medical Devices; General and Plastic Surgery Devices; Classification of the Skin Patch for Treatment of HyperhidrosisFood and Drug Administration
- Medical Devices; Anesthesiology Devices; Classification of the Monitor for Opioid Induced Impairment of OxygenationFood and Drug Administration
- Medical Devices; Orthopedic Devices; Classification of the Medial Knee Implanted Shock AbsorberFood and Drug Administration
- Medical Devices; Neurological Devices; Classification of the External Lower Extremity Nerve Stimulator for Restless Legs SyndromeFood and Drug Administration
- Medical Devices; General Hospital and Personal Use Devices; Classification of the Infant Supine Sleep SystemFood and Drug Administration
Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.