JENTEK SENSORS, INC.

Marlborough, MA · Aerospace · Private

Advanced eddy current array sensor system with model-based data analytics for non-destructive evaluation of aircraft structural cracks

Claim this profile

Follows are private to you and power your alerts

Updated · jenteksensors.com

Sector
Aerospace
Headquarters
Marlborough, MA
Total capital
$46.3M
Federal grants
$6.3M
10 awards · 2015–2026
Rank in peer group#62 of 155
Private capital raised
None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
Federal contracts
$40.1M
80 awards · Defense, Transportation, NASA
Rank in Aerospace#95 of 1335
Granted patents
30
10 pending · first 2015
Rank in peer group#4 of 155

Capital timeline

200620102014201820222026FEDERAL ↑EQUITY ↓Cumulative $46.3M2006: $3.3M across 4 contracts$3.3M2007: $420K across 3 contracts2008: $3.1M across 8 contracts2009: $4M across 11 contracts$4M2010: $1.8M across 9 contracts2011: $4.4M across 10 contracts$4.4M2012: $1.6M across 9 contracts2013: $2.7M across 3 contracts2014: $2.1M across 7 contracts2015: $300K across 2 grants · $1.1M across 2 contracts2016: $416K across 3 grants · $801K across 3 contracts2017: $1.5M across 1 grant · $1.7M across 2 contracts$3.3M2018: $760K across 1 grant · $2.7M across 2 contracts$3.5M2019: $1.5M across 1 grant · $5K across 1 contract2020: $188K across 2 contracts2021: $8.2M across 3 contracts$8.2M2022: $1.5M across 1 grant2023: $1.9M across 1 contract2026: $225K across 1 grant
200620102014201820222026FEDERAL ↑EQUITY ↓Cumulative $46.3M2006: $3.3M across 4 contracts2007: $420K across 3 contracts2008: $3.1M across 8 contracts2009: $4M across 11 contracts$4M2010: $1.8M across 9 contracts2011: $4.4M across 10 contracts$4.4M2012: $1.6M across 9 contracts2013: $2.7M across 3 contracts2014: $2.1M across 7 contracts2015: $300K across 2 grants · $1.1M across 2 contracts2016: $416K across 3 grants · $801K across 3 contracts2017: $1.5M across 1 grant · $1.7M across 2 contracts2018: $760K across 1 grant · $2.7M across 2 contracts$3.5M2019: $1.5M across 1 grant · $5K across 1 contract2020: $188K across 2 contracts2021: $8.2M across 3 contracts$8.2M2022: $1.5M across 1 grant2023: $1.9M across 1 contract2026: $225K across 1 grant

Latest events

  • Federal grantNASA · Phase I · SBIR Phase I In-situ And Post Process Nondestructive Inspection (ndi) For Space-based And Lunar Laser Welding$225K
  • Federal contractDefense · Research And Development SBIR Phase II$1.9M
  • Federal grantDefense · Phase II · Field Inspection ET-Array System for Aircraft Structures$1.5M
  • Federal contractDefense · SBIR Phase II R&d$1.7M
  • Federal contractTransportation · SBIR Phase II Award To Jentek Sensors Under Topic 20-PH1.$985K
  • Federal contractDefense · SBIR Phase II.5 R&d For Osd$5.5M
  • Federal contractTransportation · SBIR PH1 On Topic 20-PH1 For Inline Inspection Technologies R&d$150K
Show 83 earlier federal awards
  • Federal contractDefense · Jet A+ Handheld System$38K
  • Federal grantDefense · Phase II · ET-Arrays for NDT of Challenging Bolt Holes$1.5M
  • Federal contractDefense · Repair Of Jentek Sensors$5K
  • Federal grantDefense · Phase II · Enhanced Eddy Current Nondestructive Inspection Capability for Corrosion and Crack Detection of Aerospace Structures$760K
  • Federal contractDefense · Research And Development Igf::ot::igf$1.5M
  • Federal contractDefense · R&d- Defense System: Miscellaneous Hard Goods (commercialized)$1.2M
  • Federal contractDefense · SBIR Phase II For Topic A16-012$1.7M
  • Federal contractDefense · Handheld Jet A-test System$34K
  • Federal grantDefense · Phase II · Multimodal nondestructive evaluation of internal surfaces of holes in steel structures$1.5M
  • Federal contractDefense · Igf::ot::igf Repair Of Gridstation System$4K
  • Federal grantDefense · Phase I · High Confidence, Rapid Alloy Identification$146K
  • Federal contractDefense · Igf::ot::igf On-site Diagnostic Review&lmtd Repair$12K
  • Federal contractDefense · Igf::ot::igf - Magnetoresistive-arrays For Low Frequency Eddy Current Imaging Of Buried Corrosion$785K
  • Federal grantDefense · Phase I · Multi-Modal Hole Inspection Using Eddy Current Arrays and Surface Topology Imaging$149K
  • Federal grantNASA · Phase I · Through-Thickness Health Monitoring of Thermal Protection Systems$121K
  • Federal grantDefense · Phase I · Low Cost Rapid MWM-Array Inspection for Airfoil Sustainment$150K
  • Federal contractNASA · Igf::ot::igf:: Quality Testing Magnetic Composite Material$138K
  • Federal grantDefense · Phase I · Magnetoresistive-Arrays for Low Frequency Eddy Current Imaging of Buried Corrosion$150K
  • Federal contractTransportation · Igf::ot::igf SBIR Phase II, 13.2-PH1, Entitled,"pipeline Integrity Assessment Using In-line Inspection"$1.0M
  • Federal contractDefense · Igf::ot::igf SBIR Phase II- Topic: AF121-214 - Wireless Eddy Current Testing Instrument$750K
  • Federal contractDefense · Mwm-array Scanning System Lease$61K
  • Federal contractNASA · Igf::ot::igf This Program Addresses The Need For Interfacial And In-depth Temperature Monitoring Of Thermal Protection Systems (tps). Novel, Linear Drive, Eddy Current Methods Are Proposed That Incorporate Innovative Sensor Array Constructs, Physics-based Models, And Multivariate Inverse Methods To Nondestructively Assess Temperatures For Carbon-based Tps Materials Such As Felts And Pica. The Sensors Can Be Mounted Behind The Tps Material Or Embedded Within The Tps With Sensing Fields That Are P$122K
  • Federal contractNASA · Igf::ot::igf An Ideal Nde Data Acquisition And Analysis Tool Would Be A Versatile And Precise Device Capable Of Providing Support For A Large Number Of Inspections Using Numerous Inspection Methods Such As Jentek's Meandering Winding Magnetometer (mwm) Inspection, Standard Eddy Current Testing (et), Ultrasonic Testing (ut), And Other Digitized Ndt Methodologies. Such A "super" Instrument Could Address Nasa's Need For Improved Nondestructive Evaluation (nde) Of Complex Built Up Structural Compone$125K
  • Federal contractNASA · Igf::ot::igf This Program Addresses The Need For Non-destructive Evaluation (nde) Methods For Quality Assessment And Defect Evaluation Of Thermal Protection Systems (tps). Novel Linear Drive Eddy Current Methods Are Proposed For Nde Of Carbon-based Tps Materials, Such As Felts, Rigid Materials, And Three Dimensional Woven Fiber Composites. Using A Combination Of Physics-based Models Of Layered Media, Including An Eddy Current Micromechanical Model Extension For Composites, Multivariate Inverse M$750K
  • Federal contractTransportation · Igf::ot::igf 13.2-PH1-002 Jentek Sensors Inc., Project Title, Structured Waveform, Magnetic Field (swmf) Pig Development For Cracks And Corrosion$150K
  • Federal contractNASA · Igf::ot::igf Quality Testing Magnetic Composite Material$145K
  • Federal contractDefense · SBIR P2.5 Topic N07-168$1.8M
  • Federal contractNASA · Igf::ot::igf This Program Addresses The Need For Non-destructive Evaluation (nde) Methods For Quality Assessment And Defect Evaluation Of Thermal Protection Systems (tps), Including Permanently Installed Sensors For Tps Condition, Stress And Temperature Monitoring. Novel Linear Drive Eddy Current Methods Are Proposed For Nde Of Carbon-based Tps Materials, Such As Three Dimensional Woven Fiber Composites And Felts. Using A Combination Of Physics-based Models, Multivariate Inverse Methods, High R$125K
  • Federal contractDefense · Igf::ot::igf SBIR Landing Gear Fatigue Damage Detection$737K
  • Federal contractNASA · Igf::ot::igf - Stress Rupture Is A Sudden And Catastrophic Failure Of The Overwrap Of A Pressure Vessel While Holding At A Stress Level Below The Ultimate Strength For An Extended Time. Currently There Is No Simple Method Of Determining The Stress Rupture Life Of Either A Composite Overwrapped Pressure Vessel (copv) Or Providing A Screening Technique To Determine If A Particular Copv Is Close To The Time Of A Stress Rupture Failure. A Key Factor For Stress Reliability Modeling Of Copvs Is The $135K
  • Federal contractDefense · Mux Units$140K
  • Federal contractDefense · Gridstation Durable System$65K
  • Federal contractNASA · On Site Demand Training For Jentek's Gridstation And Mwm Array.$8K
  • Federal contractDefense · Phase II SBIR Award$750K
  • Federal contractDefense · SBIR Phase I Award$150K
  • Federal contractDefense · Landing Gear Fatigue Dmage Detection And Tracking$150K
  • Federal contractNASA · Igf::ot::igf Other Functions. Health Monitoring Of Compsite Overwrapped Pressure Vessels$140K
  • Federal contractDefense · 7-CHANNEL Beta Test Grid Station$64K
  • Federal contractDefense · Single Channel Probe$16K
  • Federal contractDefense · Research And Development SBIR Ph I Topic N112-087$80K
  • Federal contractDefense · SBIR Phase I Topic N112-120$80K
  • Federal contractDefense · Characterization Of Multi-layer Coatings$1.5M
  • Federal contractTransportation · Phmsa SBIR Phase I, 11.1-PH2-002 Jentek Sensors Inc.$145K
  • Federal contractDefense · Mvm-array Inspection Of Hvof Coated Landing Gear Components$742K
  • Federal contractDefense · Phase II, Topic SB091-011, Jentek Sensor$1.5M
  • Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$80K
  • Federal contractNASA · Damage Caused By Composite Overwrapped Pressure Vessels (copvs) Failure Can Be Catastrophic. Thus, Monitoring Condition And Stress In The Composite Overwrap, Including The Fiber Layers Most Prone To Failure Is Needed During Both Preflight Qualification And Spaceflight. We Will Develop Practical Non-destructive Evaluation (nde) Capability For Use During Spaceflight And Surface Mounted Magnetic Stress Gages (msgs) For Preflight Qualifications/testing And In-flight Monitoring. Nde Will Address Dama$99K
  • Federal contractDefense · Other Aircraft Part And Auxiliary Equipment Manufacturing$100K
  • Federal contractDefense · R&d Topic N102-136$80K
  • Federal contractDefense · SBIR Ph Ii-cost Plus Fixed Fee$710K
  • Federal contractDefense · R&d Under SBIR Topic N102-141$80K
  • Federal contractDefense · Phase II, Topic AF083-246, Jentek Sensor$740K
  • Federal contractDefense · Request Non-personal Services For A One-$7K
  • Federal contractDefense · SBIR Phase I Contract.$100K
  • Federal contractNASA · Carbon Wrapped Composite Overwrapped Pressure Vessels(copv) Health Monitoring Study.$50K
  • Federal contractNASA · Sensor Upgrade Of Government Owned Mwm System$13K
  • Federal contractDefense · Grid With Properties$5K
  • Federal contractDefense · Characterization Of Multilayer Coatings Using Shaped Field Electromagnetic Sensor Arrays$100K
  • Federal contractNASA · Modern Aircraft (and Next Generation Spacecraft) Increasingly Rely On Composite Components Due To Their Excellent Specific Strength And Stiffness, As Well As Improvements In Costs And Manufacturing Quality. However, Life Management For Composites Is In Its Infancy Compared To Life Management For Metal Structures. Limitations In The Ability Of Standard Nondestructive Evaluation (nde) Methods To Observe Manufacturing Quality And In-service Damage Evolution Of Composite Structures May Prevent Desig$740K
  • Federal contractDefense · Research And Development$993K
  • Federal contractDefense · R&d Phase II SBIR Topic #N07-177$499K
  • Federal contractDefense · Final Report And Project Summary$120K
  • Federal contractTransportation · Phmsa SBIR Phase I Recommendation 091-PH1-018 Jentek Sensors Inc.$100K
  • Federal contractDefense · Darpa SBIR Phase I$99K
  • Federal contractDefense · SBIR Phase 1, AF083-246, Jentek$100K
  • Federal contractDefense · SBIR P2$1.0M
  • Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$150K
  • Federal contractNASA · Micromechanical Models For Composite Nde And Diagnostics Modern Aircraft Increasingly Rely On Composite Components, Due To Their Excellent Material Properties. However, Fastening/joining And Design Methodologies In Current Use Are Artifacts Of Metallic Aircraft Component Use And Are Not Yet Optimized For Use With Composites. Furthermore, Limitations In Our Current Ability To Observe Manufacturing Quality And In-service Damage Evolution Of Composite Structures May Prevent Designers From Realizin$100K
  • Federal contractDefense · Research And Development In The Physical, Engineering, And Life Sciences (except Biotechnology)$100K
  • Federal contractDefense · SBIR Phase I$70K
  • Federal contractDefense · Jentek Sensors, SBIR Ph II$1.2M
  • Federal contractDefense · SBIR Phase III Topic N04-256$220K
  • Federal contractDefense · Hybrid Nde Methods For Linear Friction Weld Characterization$100K
  • Federal contractDefense · Base 7-CHANNEL Beta Test Gridstation$94K
  • Federal contractDefense · R&d SBIR Topic N06-020$1.1M
  • Federal contractDefense · Final Report$150K
  • Federal contractDefense · SBIR Phase I Topic N07-169$150K
  • Federal contractDefense · Phase I SBIR Topic N07-177$150K
  • Federal contractDefense · SBIR Phase I Effort$120K
  • Federal contractTransportation · Phmsa SBIR Phase I$100K
  • Federal contractDefense · 200608!424858!1700!N68335!NAVAL Air Engineering Station !N6833506C0308 !a!n! !y! ! !20060516!20070516!858400716!858400716!858400716!N!JENTEK Sensors, Inc !110-1 Clematis Avenue !waltham !MA!02453!72600!017!25!WALTHAM !middlesex !mass !+000000374983!N!N!000000749962!AC62!RDTE/ELECTRONICS & Communication Eq-applied Resea !A7 !electronics And Communication Equip !000 !not Discernable !541720!E! !3! ! ! ! ! !999$1.0M
  • Federal contractDefense$1.5M
  • Federal contractDefense · 200606!358652!1700!N68335!NAVAL Air Engineering Station !N6833506C0145 !a!n! !y! ! !20060327!20070327!858400716!858400716!858400716!N!JENTEK Sensors, Inc !110-1 Clematis Avenue !waltham !MA!02453!49655!017!25!NORTH Waltham !middlesex !mass !+000000249892!N!N!000000749722!AC62!RDTE/ELECTRONICS & Communication Eq-applied Resea !A7 !electronics And Communication Equip !000 !not Discernable !541710!E! !3! ! ! ! ! !999$750K

Federal awards are summed by year (90 awards); hover a bar for the split. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Standing among 155 peers

Line = median

Aerospace · Device

  • Federal grants#62 · top 40%
  • Granted patents#4 · top 3%
  • Linked publications#18 · top 12%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

No founders are linked to this company yet.

Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.

Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026

Claim this profile to add your team

What it has protected

USPTO · 30 granted of 40
Show all 40 patent records

Recent research by its founders

  • MWM-Array and MR-MWM-Array Eddy Current Testing for Piping and Vessels20190 cites
  • PR-392-113701-R01 Improved Crack Depth Measurement Techniques20180 cites
  • Hand-Held, Wireless (or Ethernet) Eddy Current Array System for Rapid Inspection20160 cites

Regulatory activity · Aerospace

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .