ALPHASTAR TECHNOLOGY SOLUTIONS LLC

LONG BEACH, CA · Materials · Private

Integrated Computational Materials Engineering (ICME) software toolset for grain-boundary engineering in additive manufacturing, using physics-based modeling to optimize polycrystalline metal microstr

Claim this profile

Follows are private to you and power your alerts

Updated · alphastarcorp.com

Sector
Materials
Headquarters
LONG BEACH, CA
Total capital
$13.8M
Federal grants
$6M
12 awards · 2015–2025
Rank in peer group#5 of 11
Private capital raised
None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
Federal contracts
$7.8M
39 awards · Defense, NASA
Rank in Materials#55 of 1258
Granted patents
None on recordNo USPTO grants. Applications publish after 18 months.

Capital timeline

200320072011201520192023FEDERAL ↑EQUITY ↓Cumulative $13.8M2003: $1.2M across 1 contract$1.2M2007: $100K across 1 contract2008: $204K across 5 contracts2009: $223K across 3 contracts2010: $1.1M across 6 contracts$1.1M2011: $159K across 4 contracts2012: $892K across 3 contracts2013: $150K across 1 contract2015: $499K across 1 grant · $913K across 3 contracts$1.4M2016: $300K across 2 grants · $267K across 4 contracts2017: $123K across 1 grant · $1.0M across 1 contract$1.1M2018: $1.2M across 3 grants · $125K across 1 contract$1.3M2019: $390K across 2 contracts2020: $100K across 1 grant · $750K across 1 contract2021: $3.7M across 3 grants$3.7M2023: $100K across 1 contract2024: $36K across 1 contract2025: $140K across 1 grant · $140K across 1 contract
200320072011201520192023FEDERAL ↑EQUITY ↓Cumulative $13.8M2003: $1.2M across 1 contract$1.2M2007: $100K across 1 contract2008: $204K across 5 contracts2009: $223K across 3 contracts2010: $1.1M across 6 contracts2011: $159K across 4 contracts2012: $892K across 3 contracts2013: $150K across 1 contract2015: $499K across 1 grant · $913K across 3 contracts$1.4M2016: $300K across 2 grants · $267K across 4 contracts2017: $123K across 1 grant · $1.0M across 1 contract2018: $1.2M across 3 grants · $125K across 1 contract$1.3M2019: $390K across 2 contracts2020: $100K across 1 grant · $750K across 1 contract2021: $3.7M across 3 grants$3.7M2023: $100K across 1 contract2024: $36K across 1 contract2025: $140K across 1 grant · $140K across 1 contract

Latest events

  • Federal contractDefense · Research And Development$140K
  • Federal grantDefense · Phase I · Research And Development$140K
  • Federal contractDefense · Brand Name Alphastar Genoa 3DP Software Renewal$36K
  • Federal contractDefense · Brand Name Alphastar Genoa 3DP$100K
  • Federal grantDefense · Phase II · Grain Boundary Engineering in Additive Manufacturing (AM)$1.0M
  • Federal grantDefense · Phase II · Analysis and Modeling of Erosion in Gas-Turbine Grade Ceramic Matrix Composites (CMCs)$1.1M
  • Federal grantDefense · Phase II · Integrated Hybrid Structural Health Monitoring (SHM) System$1.6M
Show 44 earlier federal awards
  • Federal contractDefense · COVID-19 Dib Design Framework For Optimized Multifunctional Coatings$750K
  • Federal grantDefense · Phase I · Grain Boundary Engineering in Additive Manufacturing (AM)$100K
  • Federal contractDefense · STTR Topic N19B-T033 Award$240K
  • Federal contractDefense · Metals Probabilistic Performance Prediction$150K
  • Federal grantDefense · Phase I · Feed-Forward Controls for Laser Powder Bed Fusion Based Metal Additive Manufacturing$130K
  • Federal grantDefense · Phase I · Lightweight Structural Components of a Missile Body$100K
  • Federal contractDefense · Sbir/sttr Phase I Research&development - Lightweight Structural Components Of A Missile Body$125K
  • Federal grantDefense · Phase II · Additive Manufacturing for Affordable Missile Defense$949K
  • Federal grantNASA · Phase I · In-Situ Sensing of Additive Manufacturing Process for safety-Critical Aerospace Applications$123K
  • Federal contractDefense · Igf::ot::igf SBIR Phase II A2-6446 Alpha Star$1.0M
  • Federal grantDefense · Phase I · Additive Manufacturing for Affordable Missile Defense$150K
  • Federal contractDefense · Research And Development Igf::ot::igf$80K
  • Federal contractDefense · Igf::ot::igf; SBIR PHASE1 Topic N162-091 Design Tool For Topological Optimization Of Air-platform Structural Components Made By Additive Manufacturing.$80K
  • Federal contractDefense · Igf::ot::igf$80K
  • Federal grantDefense · Phase I · Multi-material Additive Manufacturing for Advanced Space Systems$150K
  • Federal contractDefense · Maintenance And Updates For Cmc Software Support For Genoa Structual Analysis, Gui, Pfa Mcq Ceramic Basic And Mcqr_rec/oxi.$27K
  • Federal contractDefense · Igf::ot::igf 6 Month SBIR Phase 1$150K
  • Federal grantDefense · Phase II · Interlaminar Mode I and Mode II Fracture Toughnesses in Ceramic Matrix Composites (CMCs)$499K
  • Federal contractDefense · SBIR Phase II Igf::ot::igf$748K
  • Federal contractDefense · Igf::ot::igf Mcq Training (spring 2015)$15K
  • Federal contractDefense · STTR Phase I$150K
  • Federal contractDefense · Army SBIR Phase 1 Etitled, "analysis Tools For Composite Laminate Material Properties Prediction$100K
  • Federal contractNASA · Genoa Software Lease$43K
  • Federal contractDefense · STTR Phase II Topic N10A-T010$750K
  • Federal contractNASA · Genoa Software License$45K
  • Federal contractDefense · Genoa Software Technical Support$22K
  • Federal contractDefense · Genoa Software Annual Lease Maintenance$78K
  • Federal contractNASA · Service For Advanced Structural Tailoring$15K
  • Federal contractDefense · (STTR Ph II) Hybrid Structures For Improved Damage Tolerance Of Ubitized Structures$750K
  • Federal contractDefense · R&d STTR Topic N10A-T010$100K
  • Federal contractDefense · Software$100K
  • Federal contractNASA · Genoa Software Lease And Maintenance Renewal$45K
  • Federal contractDefense · Software Technical Support$22K
  • Federal contractDefense · Physics-based Life Prediction Model Incorporating Environmental Effects For Sic/sic Ceramic Matrix Composites$100K
  • Federal contractDefense · Software$81K
  • Federal contractNASA · Genoa Software Lease And Maintenance Renewal$43K
  • Federal contractDefense · STTR (PHASE1) - Hybrid Structures For Improved Damage Tolerance Of Unitized Structures$100K
  • Federal contractNASA · Genex Core With Translator; Analysis Modules$34K
  • Federal contractNASA · License Agreement$83K
  • Federal contractNASA · Sow For Multi-level Evaluation Of Morphing Structures Alpha Star Corporation Shall Evaluate By Using Their Multi Level Integrated Computer Code (genoa) A Simulated Morphing Structure Made From Advanced Fiber Composite Materials. This Evaluation Shall Be Done In 6-MONTHS By Performing The Following Tasks: 1. Establish Material Requirements. 2. Evaluate Candidate Design Parameters. 3. Evaluate Piezo-adaptive Shape Simulation. 4. Optimize A Piezo-electrically Controlled Composite Plate 12 In$25K
  • Federal contractNASA · Software Training$17K
  • Federal contractNASA · Genoa Licenses/technical Services/support/upgrades$45K
  • Federal contractDefense · Technical Data (final)$100K
  • Federal contractDefense · 200403!001757!2100!W56HZV!TACOM - Warren !W56HZV04C0022 !a!n! !y! ! !20031231!20051231!603371238!603371238!603371238!N!ALPHA Star Corporation !5199 E Pacific Coast Hwy !long Beach !CA!90804!43000!037!06!LONG Beach !los Angeles !CALIFORNIA!+000000364999!N!N!000000000000!AC42!RDTE/TANK - Automotive-applied Research !S1 !services !000 !* !541330!E! !3! ! ! ! ! !999$1.2M

Federal awards are summed by year (51 awards); hover a bar for the split. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Standing among 11 peers

Line = median

Materials · Software

  • Federal grants#5 · top 45%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

No founders are linked to this company yet.

Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.

Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026

Claim this profile to add your team

What it has protected

No granted patents are on record.

USPTO usually publishes applications 18 months after filing, so recent applications may not be visible yet. Patents assigned under a different entity name won’t match.

Checked: USPTO granted patents and published applications · Oct 23, 2026

Regulatory activity · Materials

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .