AEGIS TECHNOLOGY, INC.

Santa Ana, CA · Founded 2002 · Energy · Private

All-solid-state sodium-ion batteries (ASSNiBs) with solid electrolyte for extreme-temperature operation up to 500°C

Claim this profile

Follows are private to you and power your alerts

Updated · aegistech.net

Sector
Energy
Headquarters
Santa Ana, CA
Founded
2002
Total capital
$11.3M
Federal grants
$2.9M
8 awards · 2015–2021
Rank in peer group#27 of 39
Private capital raised
None on recordNo Form D filings on SEC EDGAR. Some raises are not filed.
Federal contracts
$8.4M
25 awards · NASA, Defense
Rank in Energy#41 of 998
Granted patents
4
1 pending · first 2021
Rank in peer group#10 of 39

Capital timeline

20072009201120132015201720192021FEDERAL ↑EQUITY ↓Cumulative $11.3M$730K$750K$750K$1M$1.6M$1.0M
2007201120152019FEDERAL ↑EQUITY ↓Cumulative $11.3M$750K$1M$1.6M$1.0M

Latest events

  • Federal grantEnergy · Phase I · Tide-Powered Charging Stations for Off-Grid Applications$200K
  • Federal grantNASA · Phase I · Solid-state Sodium-ion Batteries for Extreme-Environment Energy Storage$125K
  • Federal contractNASA · Solid-state Lithium-ion Batteries For Electrified Aircraft Propulsion Energy Storage$83K
  • Federal grantNASA · Phase I · Solid-State Lithium-ion Batteries for Electrified Aircraft Propulsion Energy Storage$125K
  • Federal grantEnergy · Phase I · Modular and Low-Cost Marine Current Energy Converters$200K
  • Federal grantDefense · Phase I · Power Electronics Thermal Interfaces (PETI)$150K
  • Federal grantDefense · Phase II · Nanoparticle Capacitors for Multi-Point Initiation$1.0M
Show 26 earlier federal awards
  • Federal contractDefense · Igf::ot::igf SBIR Phase II Nanoparticle Capacitors For Multi-point Initiation$1.6M
  • Federal grantDefense · Phase I · Nanoparticle Capacitors for Multi-Point Initiation$100K
  • Federal contractDefense · Igf::ot::igf Nanoparticle Capacitors For Multi-point Initiation SBIR Phase I$150K
  • Federal grantEnergy · Phase II · High efficiency, low cost, high-temperature nanocomposite soft magnetic materials for vehicle power electronics$1M
  • Federal contractDefense · Igf::ot::igf - Darpa SBIR Phase I Manufacturable High Energy Density At High Temperature$100K
  • Federal contractDefense · Osd Ph II SBIR$750K
  • Federal contractDefense · Igf::ot::igf (STTR Phase I) Sustainable Alloy Design: Rare Earth Materials Challenge$100K
  • Federal contractDefense · SBIR Phase I$100K
  • Federal contractDefense · SBIR Phase I Contract Award$100K
  • Federal contractDefense · Phase I SBIR To Aegis Technology For Topic # A112-116 Titled High Energy/capacity Cathode Materials.$100K
  • Federal contractDefense · Phase II SBIR - A Viable Method For Metal Nano-coating Of Graphite Microfibers$750K
  • Federal contractDefense · Award Of SBIR Phase II Contract$730K
  • Federal contractDefense · SBIR Phase II, Topic #OSD08-EP5:$730K
  • Federal contractDefense · SBIR Phase Ii-low-cost Method For Metal Nano-coating Or Anisotropic Carbon Fibers$730K
  • Federal contractDefense · Advanced System-level Integration For High Efficiency Primary And Secondary (waste Heat) Thermoelectric Generation$100K
  • Federal contractDefense · R&D$730K
  • Federal contractDefense · Phase I SBIR For Enhancing The Utilization Efficiency Of Cathode Materials In Li-ion Batteries$100K
  • Federal contractDefense · SBIR Phase I$120K
  • Federal contractDefense · SBIR Phase I Topic N101-070-2010$70K
  • Federal contractDefense · SBIR Phase I - Low-cost Method For Metal Nano-coating Of Anisotropic Carbon Fibers$70K
  • Federal contractDefense · Contract Summary Report. FY09 SBIR Phase 1$100K
  • Federal contractDefense · Phase I SBIR$120K
  • Federal contractDefense · Wm-ma SBIR Phase 1, Topic #OSD08-EP5$100K
  • Federal contractDefense · The Contractor Shall Develop A Cost-effective Processing Technique Derived From Ball-milling Process Under Low Temperature Conditions In Order To Produce High Volume High Conductivity (hshc) Nano Material Copper (cu). Then From The Produced Bulk Copper, Various Dimensions From Tenths Of A Micrometer To Several Millimeters Of Wires Will Be Produced With Enhanced Mechanical Strength (greater Than 5 Times) And High Electrical Conductivity (greater Than 80%) As Compared To Pure Course Grain Copper.$70K
  • Federal contractDefense · Phase I SBIR Contract$120K
  • Federal contractNASA · SBIR Phase II$600K

Node area is scaled to amount. Form D reports securities sold, which can differ from an announced round; filings are numbered in the order they were made.

Standing among 39 peers

Line = median

Energy · Material

  • Federal grantsBelow median
  • Granted patents#10 · top 26%

Cumulative measures favor older companies. Rankings describe position today, not outcome. Below the median, ranks show as a band rather than a number.

Founders and team

No founders are linked to this company yet.

Founders appear once a person is matched to the company through its own patents, grants or filings. We never infer people from social profiles.

Checked: USPTO inventors; federal award principal investigators; SEC Form D related persons · Oct 23, 2026

Claim this profile to add your team

What it has protected

USPTO · 4 granted of 5
Show all 5 patent records

Regulatory activity · Energy

Sector-level, not company-level

Rules are matched to sector, not to company. Recent activity in a sector is context rather than a signal about this business — until rules are matched to what a company actually builds, the section is shown as context and nothing more.

Sources

Federal grants from SBIR/STTR, NIH, NSF and DoD records. Federal contracts from USAspending.gov. Private capital from SEC Form D. Patents from USPTO. Publications from OpenAlex. Regulatory activity from the Federal Register. Press matched on company name.

How to read this page

Figures show associations in public records, not causes or predictions. Nothing here is investment advice. An em-dash means no record was found under this company's name, not that none exists.

Data freshness

SEC Form D filings through . SBIR and STTR awards through .